14 resultados para Segments of signs
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
This contract extension was granted to analyze data obtained in the original contract period at a level of detail not called for in the original contract nor permitted by the time constraints of the original contract schedule. These further analyses focused on two primary questions: I. What sources of variation can be isolated within the overall pattern of driver recognition errors reported previously for the 16 signs tested in Project HR-256? 2. Were there systematic relations among data on the placement of signs in a simulated signing exercise and data on the respondents' ability to detect the presence of a sign in a visual field or their ability to recognize quickly and correctly a sign shown them or the speed with which these same persons can respond to a sign for a driver decision?
Resumo:
The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.
Resumo:
Research was undertaken to define an appropriate level of use of traffic control devices on rural secondary roads that carry very low traffic volumes. The goal of this research was to improve the safety and efficiency of travel on the rural secondary road system. This goal was to be accomplished by providing County Engineers with guidance concerning the cost-effective use of traffic control devices on very low volume rural roads. A further objective was to define the range of traffic volumes on the roads for which the recommendations would be appropriate. Little previous research has been directed toward roads that carry very low traffic volumes. Consequently, the factual input for this research was developed by conducting an inventory of the signs and markings actually in use on 2,069 miles of rural road in Iowa. Most of these roads carried 15 or fewer vehicles per day. Additional input was provided by a survey of the opinions of County Engineers and Supervisors in Iowa. Data from both the inventory and the opinion survey indicated a considerable lack of uniformity in the application of signs on very low volume rural roads. The number of warning signs installed varied from 0.24 per mile to 3.85 per mile in the 21 counties in which the inventory was carried out. The use of specific signs not only varied quite widely among counties but also indicated a lack of uniform application within counties. County officials generally favored varying the elaborateness of signing depending upon the type of surface and the volume of traffic on different roads. Less elaborate signing would be installed on an unpaved road than on a paved road. A concensus opinion was that roads carrying fewer than 25 vehicles per day should have fewer signs than roads carrying higher volumes. Although roads carrying 0 to 24 vehicles per day constituted over 24% of the total rural secondary system, they carried less than 3% of the total travel on that system. Virtually all of these roads are classified as area service roads and would thus be expected to carry only short trips primarily by local motorists. Consequently, it was concluded that the need for warning signs rarely can be demonstrated on unpaved rural roads with traffic volumes of fewer than 25 vehicles per day. It is recommended that each county designate a portion of its roads as an Area Service Level B system. All road segments with very low traffic volumes should be considered for inclusion in this system. Roads included in this system may receive a lesser level of maintenance and a reduced level of signing. The county is also afforded protection from liability arising from accidents occurring on roads designated as part of an Area Service Level B system. A uniform absence of warning signs on roads of this nature is not expected to have any discernible effect on the safety or quality of service on these very low volume roads. The resources conserved may be expended more effectively to upgrade maintenance and traffic control on roads carrying higher volumes where the beneficial effect on highway safety and service will be much more consequential.
Resumo:
Transportation agencies in Iowa are responsible for a significant public investment with the installation and maintenance of traffic control devices and pavement markings. Included in this investment are thousands of signs and other inventory items, equipment, facilities, and staff. The proper application of traffic control devices and pavement markings is critical to public safety on streets and highways, and local governments have a prescribed responsibility under the Code of Iowa to properly manage these assets. This research report addresses current traffic control and pavement marking application, maintenance, and management in Iowa.
Resumo:
This research project looked at the economic benefits and costs associated with alternative strategies for abandoning low volume rural highways and bridges. Three test counties in Iowa were studied, each 100 square miles in size: Hamilton County having a high agricultural tax base and a high percentage of paved roads and few bridges; Shelby County having a relatively low agricultural tax base, hilly terrain and a low percentage of paved road and many bridges; and Linn County having a high agricultural tax base, a high percentage of paved roads and a large number of non-farm households. A questionnaire survey was undertaken to develop estimates of farm and household travel patterns. Benefits and costs associated with the abandonment of various segments of rural highway and bridge mileages in each county were calculated. "Benefits" calculated were reduced future reconstruction and maintenance costs, whereas "costs" were the added cost of travel resulting from the reduced mileage. Some of the findings suggest limited cost savings from abandonment of county roads with no property access in areas with large non-farm rural population; relatively high cost savings from the abandonment of roads with no property access in areas with small rural population; and the largest savings from the conversion of public dead-end gravel roads with property or residence accesses to private drives.
Resumo:
Two composite, prestressed, steel beams, fabricated by slightly different methods, were fatigue tested to destruction. Stresses and deflections were measured at regular intervals, and the behavior of each beam as failure progressed was recorded. Residual stresses were then evaluated by testing segments of each beam. An attempt was made to assess the effects of the residual stresses on fatigue strength.
Resumo:
We explore and investigate Japanese dairy markets. We first provide an overview of consumer demand and how it evolved after World War II. Using historical data and econometric estimates of Japanese dairy demand, we identify economic, cultural, and demographic forces that have been shaping consumption patterns. Then we summarize the characteristics of Japanese milk production and dairy processing and policies affecting them. We next describe the import regime and trade flows in dairy products. The analysis of the regulatory system of the dairy sector shows how its incentive structure affects the long-term prospects of various segments of the industry. The paper concludes with policy recommendations of how to reform the Japanese dairy sector.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs
Resumo:
This Tier 2 Environmental Assessment (EA) presents the results of studies and analysis conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480).
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.
Resumo:
This Tier 2 Environmental Assessment (EA) presents the results of studies and analyses conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility1 This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480). More information about the tiering process is found below under Project Background. • Section 1 provides background information on the Project and discusses the relationship between the earlier Tier 1 EIS and this Tier 2 EA. It also discusses the proposed action and the area studied, the purpose of the Project, and the need for the Project based on transportation problems that currently exist or are expected in the future. • Section 2, Alternatives, identifies the range of alternatives considered for Segment 3 to address the transportation problems identified in Section 1. It also identifies the alternatives retained for further study in this EA and the preferred Segment 3 alternative. • Section 3, Affected Environment and Environmental Consequences, describes the general environment for each resource affected by the proposed improvements. It also describes the potential environmental impacts of the Segment 3 Project and methods to avoid, minimize, and mitigate impacts. • Section 4, Disposition, lists the agencies and organizations that will receive copies of this EA and the locations at which this EA will be available for public review. • Section 5, Comments and Coordination, summarizes the agency coordination and public involvement efforts in conjunction with the Segment 3 Project. • Section 6, Conclusion and Recommendation, summarizes resource impacts. • Section 7, References, lists the sources cited in this EA. For Segment 3, the Federal Highway Administration (FHWA) and Iowa Department of Transportation (Iowa DOT) determined that an EA is the appropriate level of Tier 2 study to comply with the National Environmental Policy Act (NEPA) requirements. The primary purpose of an EA is to clearly establish the significance of a project’s environmental impacts. That analysis is included in this document.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.