19 resultados para Sand coastal plain vegetation
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
City Audit Report - Special Investigation
Resumo:
The DOT is in the process of replanting all the roadsides on state primary highways to native grasses and wildflowers. While the existing vegetation may look nice, it is not functioning as well as needed for roadside purposes such as erosion control, water infiltration or weed competition. The DOT currently spends nearly $3 million each year to clean ditches, remove silt, and spray and mow weeds. The DOT believes the native vegetation, once established, will provide sufficient benefits and reduced maintenance costs to warrant replacing the existing vegetation.
Resumo:
The Flood Plain Management and Hazard Mitigation Task Force emphasizes the long-term benefits of mitigation and management to the entire state in preventing or reducing damages from floods and other hazards faced in Iowa. Investments in efforts to manage watershed areas and to mitigate any damages from floods or other disaster events benefit individuals, families, communities, agriculture, business and industry, and certainly public entities and infrastructure. The Task Force encourages the Rebuild Iowa Advisory Commission to balance the immediate needs for rebuilding to include the beginning of the investments required to effectively mitigate future damage and maintain effective policy in Iowa’s watersheds. The significance of the damage seen in Iowa from the tornadoes, storms, and floods of 2008 include the loss of eighteen Iowans in disaster-related events. This alone should inspire investment in mitigation efforts for all hazards. Much of the damage resulting from the disasters can be tied to floodplain management and hazard mitigation, pointing the way toward enhanced efforts and new initiatives to safeguard lives, property, and communities’ economic health. Even so, it must be recognized that the weather events throughout last winter and spring added impetus to the rains and storms that ultimately resulted in record flooding. Some perspective must be maintained as planning progresses and significant investments in mitigation are considered to meet a specific level of safety and protection from future threats. The Task Force identified a number of issues, and four were agreed-upon as those with the highest priority to be addressed by the Task Force through a set of recommendations.
Resumo:
The Flood Plain Management and Hazard Mitigation Task Force emphasizes the long-term benefits of mitigation and management to the entire state in preventing or reducing damages from floods and other hazards faced in Iowa. Investments in efforts to manage watershed areas and to mitigate any damages from floods or other disaster events benefit individuals, families, communities, agriculture, business and industry, and certainly public entities and infrastructure. The Task Force encourages the Rebuild Iowa Advisory Commission to balance the immediate needs for rebuilding to include the beginning of the investments required to effectively mitigate future damage and maintain effective policy in Iowa’s watersheds. The significance of the damage seen in Iowa from the tornadoes, storms, and floods of 2008 include the loss of eighteen Iowans in disaster-related events. This alone should inspire investment in mitigation efforts for all hazards. Much of the damage resulting from the disasters can be tied to floodplain management and hazard mitigation, pointing the way toward enhanced efforts and new initiatives to safeguard lives, property, and communities’ economic health. Even so, it must be recognized that the weather events throughout last winter and spring added impetus to the rains and storms that ultimately resulted in record flooding. Some perspective must be maintained as planning progresses and significant investments in mitigation are considered to meet a specific level of safety and protection from future threats. The Task Force identified a number of issues, and four were agreed-upon as those with the highest priority to be addressed by the Task Force through a set of recommendations. Supplemental Information to the August 2008
Resumo:
According to prevailing ecological theory one would expect the most stable vegetation on sites which are least disturbed (Odum 1971). According to theory one would also expect the most diversity of species on undisturbed sites (Odum 1971). This stable and diverse community would be produced over a period of many years through a process of plant succession where annual herbs are replaced by perennial herbs and finally woody plants would come to dominate and perpetuate the community. Another ecological theory holds that the complexity (structure and species diversity) of a plant community is dependent upon the amount of disturbance to which it is subjected (Woodwell, 1970). According to this theory the normal succession of a plant community through its various stages may be arrested at some point depending upon the nature and severity of the disturbance. In applying these theories to roadside vegetation it becomes apparent that mass herbicide spraying and extensive mowing of roadsides has produced a relatively simple and unstable vegetation. It follows that if disturbances were reduced not only would the roadside plant community increase in stability but maintenance costs and energy usage would be reduced. In this study we have investigated several aspects of reduced disturbances on roadside vegetation. Research has centered on the effectiveness of spot spraying techniques on noxious weed control, establishment of native grass cover where ditch cleaning and other disturbance has left the bare soil exposed and the response of roadside vegetation when released from annual mass spraying.
Resumo:
This document contains detailed information on Dolliver Memorial State Park, a publication of Park Booklet Series No. 3. It describes in detail the history, location, landscape, rivers, photos, terrain, vegetation, wildlife and maps of the park and nearby ares in Webster County.
Resumo:
The main objective of this study was to evaluate the hydraulic performance of riprap spurs and weirs in controlling bank erosion at the Southern part of the Raccoon River upstream U.S. Highway 169 Bridge utilizing the commercially available model FESWMS and field monitoring. It was found based on a 2 year monitoring and numerical modeling that the design of structures was overall successful, including their spacing and stability. The riprap material incorporated into the structures was directly and favorably correlated to the flow transmission through the structure, or in other words, dictated the permeable nature of the structure. It was found that the permeable dikes and weirs chosen in this study created less volume of scour in the vicinity of the structure toes and thus have less risk comparatively to other impermeable structures to collapse. The fact that the structures permitted the transmission of flow through them it allowed fine sand particles to fill in the gaps of the rock interstices and thus cement and better stabilize the structures. During bank-full flows the maximum scour hole was recorded away from the structures toe and the scourhole size was directly related to the protrusion angle of the structure to the flow. It was concluded that the proposed structure inclination with respect to the main flow direction was appropriate since it provides maximum bank protection while creating the largest volume of local scour away from the structure and towards the center of the channel. Furthermore, the lowest potential for bank erosion also occurs with the present set-up design chosen by the IDOT. About 2 ft of new material was deposited in the area located between the structures for the period extending from the construction day to May 2007. Surveys obtained by sonar and the presence of vegetation indicate that new material has been added at the bank toes. Finally, the structures provided higher variability in bed topography forming resting pools, creating flow shade on the leeward side of the structure, and separation of bed substrate due to different flow conditions. Another notable environmental benefit to rock riprap weirs and dikes is the creation of resting pools, especially in year 2007 (2nd year of the project). The magnitude of these benefits to aquatic habitat has been found in the literature that is directly related to the induced scour-hole volume.
Resumo:
Provides information on Pilot Knob State Park, Merrick State Park, Eagle Lake State Park, Rice Lake State Park and Crystal, East and West Twin, and Duck Lakes including history, maps, location, terrain, photos, vegetation and wildlife.
Resumo:
Data sheet produced by the Iowa Department of Natural Resources is about different times of animals, insects, snakes, birds, fish, butterflies, etc. that can be found in Iowa.
Resumo:
In response to the mandate on Load and Resistance Factor Design (LRFD) implementations by the Federal Highway Administration (FHWA) on all new bridge projects initiated after October 1, 2007, the Iowa Highway Research Board (IHRB) sponsored these research projects to develop regional LRFD recommendations. The LRFD development was performed using the Iowa Department of Transportation (DOT) Pile Load Test database (PILOT). To increase the data points for LRFD development, develop LRFD recommendations for dynamic methods, and validate the results ofLRFD calibration, 10 full-scale field tests on the most commonly used steel H-piles (e.g., HP 10 x 42) were conducted throughout Iowa. Detailed in situ soil investigations were carried out, push-in pressure cells were installed, and laboratory soil tests were performed. Pile responses during driving, at the end of driving (EOD), and at re-strikes were monitored using the Pile Driving Analyzer (PDA), following with the CAse Pile Wave Analysis Program (CAPWAP) analysis. The hammer blow counts were recorded for Wave Equation Analysis Program (WEAP) and dynamic formulas. Static load tests (SLTs) were performed and the pile capacities were determined based on the Davisson’s criteria. The extensive experimental research studies generated important data for analytical and computational investigations. The SLT measured loaddisplacements were compared with the simulated results obtained using a model of the TZPILE program and using the modified borehole shear test method. Two analytical pile setup quantification methods, in terms of soil properties, were developed and validated. A new calibration procedure was developed to incorporate pile setup into LRFD.
Resumo:
Flood-plain and channel-aggradation rates were estimated at selected bridge sites in central and eastern Iowa using four aggradation-measurement methods. Aggradation rates were quantified at 10 bridge sites on the Iowa River upstream of Coralville Lake and at two bridge sites in the central part of Skunk River Basin. Measurement periods used to estimate average aggradation rates ranged in length from 1 to 98 years and varied among methods and sites. A direct comparison cannot be made between aggradation rates calculated using each of the four measurement methods because of differences in time periods and aggradational processes that were measured by each method.
Resumo:
The objectives of this research were to develop a low cost fly ash-sand stabilized roadway and to correlate field performance with pavement design assumptions on a county road heavily trafficked by trucks hauling grain. The road was constructed during the summer of 1984. Three test sections comprised of different base thicknesses were incorporated in the roadway and were tested for compressive stength, structural rating, and rut depth. Annual crack surveys showed no appreciable difference in transverse cracking between the test sections and little to no rutting. The sandbase drainage characteristics beneath the roadway may have contributed to the satisfactory performance of the test sections. This project indicates that in spite of the inflated cost of construction due to the research nature of the work, a fly ash-sand base can be a viable alternative for roadway stabilization.
Resumo:
In several locations of Iowa, it is becoming more difficult to produce concrete sand consistently at a reasonable cost. Both ASTM and AASHTO have specifications for concrete sands that allow a finer, poorer graded sand than Iowa specifications. The objective of the study was to develop standard mix designs to permit the use of finer graded sand for PC concrete. Three hundred cylinders were made from five sands available in the state. Based on the results of the study, the following are recommended: (1) Create another class of concrete sand by: (a) lowering the current mortar strength ratio from 1.5 to 1.3, (b) raising the allowance for the percent passing one sieve and retained on the next from 40 to 45, and (c) including a provision that 25 to 60 percent passing the number 30 sieve is required for the sand; and (2) Modify the standard paving mixes with and without fly ash for use with the finer sand as follows: (a) 8% more cement and fly ash for B-2 to B-5 mixes, (b) 7% more cement and fly ash for A-2 to A-5 mixes, and (c) 5% more cement and fly ash for C-2 to C-5 mixes and water reduced mixes.
Resumo:
Agreed-upon procedures report on the City of Pleasant Plain, Iowa for the period January 1, 2014 through December 31, 2014
Resumo:
The routine maintenance along Iowa's highways and roadways during the summer growing season is a time consuming and costly endeavor. Trimming around guardrail posts and delineator posts is especially costly due to the handwork required. Trimming costs account for approximately 50% of the shoulder mowing costs according to expense figures obtained from the Iowa Department of Transportation (DOT), Office of Maintenance. The FY 2001 statewide trimming costs for the Iowa DOT was approximately $430,000 ($305,000 labor, $125,000 equipment and materials). This product would be required to perform well for 9-21 years, on average, in order to recoup the cost of installation. This includes the durability of the product, but not the cost of repair due to traffic damage, snowplow and wing damage, or damage caused by mowing operations. Maintenance costs associated with vegetation creep over the mats and repair costs would extend the required service life. As a result of resource realignment, the Iowa DOT roadside maintenance policy, for FY 2003 and the future, will be to eliminate trimming around delineator posts unless the reflector is obstructed. This policy change will effectively eliminate the need for weed control mats due to the significant reduction in trimming. The use of the weed control mats could be justified in areas that are dangerous to maintenance workers such as guardrail installations in high traffic areas. Because the delineator posts are further from the edge of the traveled roadway, there is a reduced risk to the maintenance workforce while hand trimming. Because the DuroTrim Vegetation Control Mats appear to have performed adequately in the field trial, they could be considered for use, where safety conditions warrant. That use should be limited, however, due to the considerable initial cost and changes in Iowa DOT roadside maintenance policy. Application should be limited to instances where the use of the DuroTrim Vegetation Control Mats would have a significant impact on the safety of the roadside maintenance workers. The cost savings, due to the elimination of the trimming and mowing alone, is not enough to justify their use in most situations at their current cost. The test sections will continue to be monitored periodically so that approximate service life can be determined.