15 resultados para Salaries and fringe benefits
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
The following report is a summary of the insurance and welfare benefits education activities in 2007. 2007 was the first full year that DAS-HRE had a full-time health and welfare benefits educator.
Resumo:
An 4 page report about what happens to your IPERS during furloughs.
Resumo:
The new law makes the following changes: (a) Reduces IPERS benefits not yet earned by regular members and raises contributions for them above the rate set in current law. (b) Raises the limit on how much contributions for regular members can change each year from 0.5 percentage point to 1.0 percentage point. (c) Extends a provision for restoring wage credits for mandatory unpaid time and extends it to union bumping. Other changes are limited in scope and will not affect most members; some changes are merely technical.
Resumo:
Explanation of how divorce can affect IPERS accounts and benefits, especially relating to Qualified Domestic Relations Orders, or QDROs.
Resumo:
The value of providing paved shoulders adjacent to many higher volume roadways has been accepted in many states across the country. Iowa’s paved shoulder policy is considerably more conservative than neighboring states, particularly on rural four-lane and high-volume two-lane highways. The objectives of this research are to examine current design criteria for shoulders employed in Iowa and surrounding states, compare benefits and costs of alternative surface types and widths, and make recommendations based on this analysis for consideration in future design policies for primary highway in Iowa. The report finds that many safety and maintenance benefits would result from enhancing Iowa’s paved shoulder and rumble strip design practices for freeways, expressways, and Super 2 highway corridors. The benefits of paved shoulders include reduced numbers of certain crashes, higher capacity potentials, reduced maintenance, enhanced opportunities for other users such as bicyclists, and even possible increased longevity of pavements. Alternative paved shoulder policies and programming strategies are also offered, with detailed assessments of the benefits, costs, and budget impacts.
Resumo:
This brochure provides general information about relocation assistance provided by the Iowa Department of Transportation (DOT) for those individuals who may be required to move as a result of a highway project. It is not intended to be a legal document that comprehensively explains every right or obligation you have as established by Chapter 316, Code of Iowa; Federal Public Laws 91-646 and 100-17; and 49 CFR. Your relocation adviser will provide the assistance you need to successfully relocate to a suitable replacement property. Your first contact with your relocation adviser will usually occur during the early stages of the appraisal process, and he or she will continue to work with you until you have moved and become established at a new location. Do not hesitate to ask questions so you are sure you understand the process, your rights and the benefits available to you. Please let your DOT relocation adviser know your needs and preferences. If your relocation adviser is unable to help you with a specific problem or concern, he or she may know of another person or an organization that can help you. DO NOT MOVE UNTIL YOU HAVE CONTACTED YOUR DOT RELOCATION ADVISER. Only then will you be sure you are not jeopardizing your potential rights and benefits under this program. No person who lawfully occupies real property will be required by DOT to move without being notified in writing at least 90 days in advance.
Resumo:
This brochure provides general information about relocation assistance provided by the Iowa Department of Transportation (DOT) for those individuals who may be required to move as a result of a highway project. It is not intended to be a legal document that comprehensively explains every right or obligation you have as established by Chapter 316, Code of Iowa; Federal Public Laws 91-646 and 100-17; and 49 CFR. Your relocation advisor will provide the assistance you need to successfully relocate to a suitable replacement property. Your first contact with your relocation advisor will usually occur during the early stages of the appraisal process, and he or she will continue to work with you until you have moved and become established at a new location. Do not hesitate to ask questions so you are sure you understand the process, your rights and the benefits available to you. Please let your DOT relocation advisor know your needs and preferences. If your relocation advisor is unable to help you with a specific problem or concern, he or she may know of another person or an organization that can help you.
Resumo:
IPI is comprised of three divisions. Private Sector funds are handed over to the General Fund. Traditional Industries and Farms funds are managed by IPI. The auditor of the state provides oversight on policies, procedures, and compliance with state law. Each year, the auditor is responsible for providing the Governor, legislature, Director of Corrections, and the public the findings of their comprehensive audits. IPI has received a clean bill of health and has not been cited for any violations in ten (10) years. IPI operates under the guidance of an advisory board, comprised of seven members. The advisory board meets at least four (4) times per year at a location of the board‟s choice, generally at a different prison each quarter. The board reviews the financials, policies, approves any new private sector ventures and offers comprehensive guidance on issues that will impact correctional industries as well as the public and local businesses. Each member serves for two (2) years and may be re-appointed. IPI has found that retaining board members has helped immensely with the continuity of transition and has afforded IPI with superb leadership and guidance. IPI is 100% self-funding. We receive no appropriations from the general fund. We hire our staff, pay their salaries, and pay the stipend of the offenders. We pay for our raw materials, equipment, and construct our buildings all from the proceeds of our sales. We operate with a revolving fund and retain any earnings at year-ends. The retained earnings are used for expansion of our work programs.
Resumo:
Four-lane undivided roadways in urban areas can experience a degradation of service and/or safety as traffic volumes increase. In fact, the existence of turning vehicles on this type of roadway has a dramatic effect on both of these factors. The solution identified for these problems is typically the addition of a raised median or two-way left-turn lane (TWLTL). The mobility and safety benefits of these actions have been proven and are discussed in the “Past Research” chapter of this report along with some general cross section selection guidelines. The cost and right-of-way impacts of these actions are widely accepted. These guidelines focus on the evaluation and analysis of an alternative to the typical four-lane undivided cross section improvement approach described above. It has been found that the conversion of a four-lane undivided cross section to three lanes (i.e., one lane in each direction and a TWLTL) can improve safety and maintain an acceptable level of service. These guidelines summarize the results of past research in this area (which is almost nonexistent) and qualitative/quantitative before-and-after safety and operational impacts of case study conversions located throughout the United States and Iowa. Past research confirms that this type of conversion is acceptable or feasible in some situations but for the most part fails to specifically identify those situations. In general, the reviewed case study conversions resulted in a reduction of average or 85th percentile speeds (typically less than five miles per hour) and a relatively dramatic reduction in excessive speeding (a 60 to 70 percent reduction in the number of vehicles traveling five miles per hour faster than the posted speed limit was measured in two cases) and total crashes (reductions between 17 to 62 percent were measured). The 13 roadway conversions considered had average daily traffic volumes of 8,400 to 14,000 vehicles per day (vpd) in Iowa and 9,200 to 24,000 vehicles per day elsewhere. In addition to past research and case study results, a simulation sensitivity analysis was completed to investigate and/or confirm the operational impacts of a four-lane undivided to three-lane conversion. First, the advantages and disadvantages of different corridor simulation packages were identified for this type of analysis. Then, the CORridor SIMulation (CORSIM) software was used x to investigate and evaluate several characteristics related to the operational feasibility of a four-lane undivided to three-lane conversion. Simulated speed and level of service results for both cross sections were documented for different total peak-hour traffic, access densities, and access-point left-turn volumes (for a case study corridor defined by the researchers). These analyses assisted with the identification of the considerations for the operational feasibility determination of a four -lane to three-lane conversion. The results of the simulation analyses primarily confirmed the case study impacts. The CORSIM results indicated only a slight decrease in average arterial speed for through vehicles can be expected for a large range of peak-hour volumes, access densities, and access-point left-turn volumes (given the assumptions and design of the corridor case study evaluated). Typically, the reduction in the simulated average arterial speed (which includes both segment and signal delay) was between zero and four miles per hour when a roadway was converted from a four-lane undivided to a three-lane cross section. The simulated arterial level of service for a converted roadway, however, showed a decrease when the bi-directional peak-hour volume was about 1,750 vehicles per hour (or 17,500 vehicles per day if 10 percent of the daily volume is assumed to occur in the peak hour). Past research by others, however, indicates that 12,000 vehicles per day may be the operational capacity (i.e., level of service E) of a three-lane roadway due to vehicle platooning. The simulation results, along with past research and case study results, appear to support following volume-related feasibility suggestions for four-lane undivided to three-lane cross section conversions. It is recommended that a four-lane undivided to three-lane conversion be considered as a feasible (with respect to volume only) option when bi-directional peak-hour volumes are less than 1,500 vehicles per hour, but that some caution begin to be exercised when the roadway has a bi-directional peak-hour volume between 1,500 and 1,750 vehicles per hour. At and above 1,750 vehicles per hour, the simulation indicated a reduction in arterial level of service. Therefore, at least in Iowa, the feasibility of a four-lane undivided to three-lane conversion should be questioned and/or considered much more closely when a roadway has (or is expected to have) a peak-hour volume of more than 1,750 vehicles. Assuming that 10 percent of the daily traffic occurs during the peak-hour, these volume recommendations would correspond to 15,000 and 17,500 vehicles per day, respectively. These suggestions, however, are based on the results from one idealized case xi study corridor analysis. Individual operational analysis and/or simulations should be completed in detail once a four-lane undivided to three-lane cross section conversion is considered feasible (based on the general suggestions above) for a particular corridor. All of the simulations completed as part of this project also incorporated the optimization of signal timing to minimize vehicle delay along the corridor. A number of determination feasibility factors were identified from a review of the past research, before-and-after case study results, and the simulation sensitivity analysis. The existing and expected (i.e., design period) statuses of these factors are described and should be considered. The characteristics of these factors should be compared to each other, the impacts of other potentially feasible cross section improvements, and the goals/objectives of the community. The factors discussed in these guidelines include • roadway function and environment • overall traffic volume and level of service • turning volumes and patterns • frequent-stop and slow-moving vehicles • weaving, speed, and queues • crash type and patterns • pedestrian and bike activity • right-of-way availability, cost, and acquisition impacts • general characteristics, including - parallel roadways - offset minor street intersections - parallel parking - corner radii - at-grade railroad crossings xii The characteristics of these factors are documented in these guidelines, and their relationship to four-lane undivided to three-lane cross section conversion feasibility identified. This information is summarized along with some evaluative questions in this executive summary and Appendix C. In summary, the results of past research, numerous case studies, and the simulation analyses done as part of this project support the conclusion that in certain circumstances a four-lane undivided to three-lane conversion can be a feasible alternative for the mitigation of operational and/or safety concerns. This feasibility, however, must be determined by an evaluation of the factors identified in these guidelines (along with any others that may be relevant for a individual corridor). The expected benefits, costs, and overall impacts of a four-lane undivided to three-lane conversion should then be compared to the impacts of other feasible alternatives (e.g., adding a raised median) at a particular location.
Resumo:
Through networking, Iowa’s manufacturers share expertise in lean manufacturing, supply chain efficiency and rapid prototyping, strengthening the powerful environment for success. The Iowa Department of Economic Development builds on these strengths with a focus on advanced manufacturing, extending financial and tax benefits to companies making substantial investments and creating higher skill, higher paying jobs. Many companies these days are finding that it pays to explore options in Iowa as they plan manufacturing expansions. You can get in touch with us at www.iowalifechanging.com.
Resumo:
When selecting sites for the industry’s leading data centers, experts and IT leaders such as Google and Microsoft, are increasingly choosing Iowa They’re doing so because they understand that Iowa is a safe zone for data and information storage — tucked away from the major threats and terrorist targets in the U.S. What’s more, there are many infrastructural and financial benefits that only Iowa offers. With all this activity, available research and Iowa’s inherent advantages, it seems the question isn't so much why Iowa, but why not?
Resumo:
The IPERS Member Handbook summarizes the retirement plan that is provided for most employees of Iowa’s schools, cities, counties, townships, state agencies, and other governmental units. This publication explains the rights and benefits of IPERS membership in as clear and useful a manner as possible; however, it is not intended to be a complete presentation of the IPERS law and policies. Benefits provided under IPERS differ for Special service members—sheriffs, deputy sheriffs, and those working in other protection occupations, such as firefighters, police, correctional officers, and conservation officers. This publication explains what these differences are. To help you find information that applies only to you, IPERS also publishes a variety of booklets and brochures to guide you through IPERS benefits at specific stages of your career, from membership enrollment to retirement. These educational resources are available for viewing or printing from our website at www.ipers.org. You may also contact IPERS and request a free printed copy. Alternative formats containing the information in this publication are available upon request. Note: This publication reflects the law as of July 2011. Some provisions will become effective at later dates, as noted. Any inconsistencies or inadvertent omissions will be resolved in favor of the law.
Resumo:
It’s really quite simple. IPERS is a sure thing. IPERS benefits carry a lifetime guarantee. A bad economy and declining stock market do not decrease your benefits. Instead, your benefit amount is determined by a pre-established formula that replaces a percentage of your pre-retirement wages. How close your benefits get to the maximum of the IPERS plan—replacing 65 percent of pre-retirement wages or 72 percent for public safety personnel—is mostly up to you. Current employees don’t have to worry about where to invest or what to do when there is a slump in the stock market. Retirees don’t have to worry that a down market will reduce their monthly payments, and they never have to worry about outliving their IPERS benefits. Disability payments and death benefits act as a safety net for members and their families.
Resumo:
Ramp metering has been successfully implemented in many states to improve traffic operations on freeways. Studies have documented the positive mobility and safety benefits of ramp metering. However, there have been no studies on the use of ramp metering for work zones. This report documents the results from the first deployment of temporary ramp meters in work zones in the United States. Temporary ramp meters were deployed at seven urban short-term work zones in Missouri. Safety measures such as driver compliance, merging behavior, and speed differentials were extracted from video-based field data. Mobility analysis was conducted using a calibrated simulation model and the total delays were obtained for under capacity, at capacity, and over capacity conditions. This evaluation suggests that temporary ramp meters should only be deployed at work zone locations where there is potential for congestion and turned on only during above-capacity conditions. The compliance analysis showed that non-compliance could be a major safety issue in the deployment of temporary ramp meters for under-capacity conditions. The use of a three-section instead of a traditional two-section signal head used for permanent ramp metering produced significantly higher compliance rates. Ramp metering decreased ramp platoons by increasing the percentage of single-vehicle merges to over 70% from under 50%. The accepted-merge-headway results were not statistically significant even though a slight shift towards longer headways was found with the use of ramp meters. Mobility analysis revealed that ramp metering produced delay savings for both mainline and ramp vehicles for work zones operating above capacity. On average a 24% decrease in total delay (mainline plus ramp) at low truck percentage and a 19% decrease in delay at high truck percentage conditions resulted from ramp metering.
Resumo:
This project develops a smartphone-based prototype system that supplements the 511 system to improve its dynamic traffic routing service to state highway users under non-recurrent congestion. This system will save considerable time to provide crucial traffic information and en-route assistance to travelers for them to avoid being trapped in traffic congestion due to accidents, work zones, hazards, or special events. It also creates a feedback loop between travelers and responsible agencies that enable the state to effectively collect, fuse, and analyze crowd-sourced data for next-gen transportation planning and management. This project can result in substantial economic savings (e.g. less traffic congestion, reduced fuel wastage and emissions) and safety benefits for the freight industry and society due to better dissemination of real-time traffic information by highway users. Such benefits will increase significantly in future with the expected increase in freight traffic on the network. The proposed system also has the flexibility to be integrated with various transportation management modules to assist state agencies to improve transportation services and daily operations.