23 resultados para SAW-Welding

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Early entry sawing applies sawing earlier and more shallowly than conventional sawing and is believed to increase sawing productivity and reduce the cost of the joint sawing operations. However, some early entry sawing joints (transverse joints) in Iowa were found to experience delayed cracking, sometimes up to 30 days. A concern is whether early entry sawing can lead to late-age random cracking. The present study investigated the effects of different sawing methods on random cracking in portland cement concrete (PCC) pavements. The approach was to assess the cracking potential at sawing joints by measuring the strain development of the concrete at the joints using concrete embedment strain gages. Ten joints were made with the early entry sawing method to a depth of 1.5 in., and two strain gages were installed in each of the joints. Another ten joints were made with the conventional sawing method, five of which were sawed to a depth of one-third of the pavement thickness (3.3 in.), and the other five of which were sawed to a depth of one-quarter of the pavement thickness (2.5 in.). One strain gage was installed in each joint made using conventional sawing. In total, 30 strain gages were installed in 20 joints. The results from the present study indicate that all 30 joints cracked within 25 days after paving, though most joints made using early entry sawing cracked later than the joints made using conventional sawing. No random cracking was observed in the early entry sawing test sections two months after construction. Additionally, it was found that the strain gages used were capable of monitoring the deformations at the joints. The joint crack times (or crack initiation time) measured by the strain gages were generally consistent with the visual observations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

At present, there is little fundamental guidance available to assist contractors in choosing when to schedule saw cuts on joints. To conduct pavement finishing and sawing activities effectively, however, contractors need to know when a concrete mixture is going to reach initial set, or when the sawing window will open. Previous research investigated the use of the ultrasonic pulse velocity (UPV) method to predict the saw-cutting window for early entry sawing. The results indicated that the method has the potential to provide effective guidance to contractors as to when to conduct early entry sawing. The aim of this project was to conduct similar work to observe the correlation between initial setting and conventional sawing time. Sixteen construction sites were visited in Minnesota and Missouri over a two-year period. At each site, initial set was determined using a p-wave propagation technique with a commercial device. Calorimetric data were collected using a commercial semi-adiabatic device at a majority of the sites. Concrete samples were collected in front of the paver and tested using both methods with equipment that was set up next to the pavement during paving. The data collected revealed that the UPV method looks promising for early entry and conventional sawing in the field, both early entry and conventional sawing times can be predicted for the range of mixtures tested.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There were 33 new diagnoses of HIV infection reported in Iowa in the 4th quarter. Keeping in mind that more diagnoses will yet be reported for 2003, we have so far received reports of 79 Iowans who were newly diagnosed with HIV infection in 2003. Reports on persons diagnosed in the last quarter of the year will continue to trickle in through the end of March, but we’ll definitely be substantially below the 104 diagnoses we saw in 2002.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This quarter, we received reports for 26 HIV diagnoses. So far this year, there have been 79 HIV diagnoses reported, exactly the same as this time last year. Thirty-five percent received concurrent AIDS diagnoses. There were 57 AIDS diagnoses in the first three quarters of 2005, 20% higher than what we saw at this time last year. Nearly half (47%) of these were persons who had been diagnosed with HIV for at least one year (fifteen years for two persons), and the rest received concurrent HIV and AIDS diagnoses. In surveillance news, Illinois, Maine, and Philadelphia have announced that they will begin HIV reporting by name on January 1, 2006. Currently they use code or name-to-code systems to report new diagnoses of HIV. The Centers for Disease Control and Prevention do not accept information from areas that report HIV cases by code, so no national surveillance data are available for HIV diagnoses. For this reason, Ryan White CARE Act funds cannot be appropriated according to the number of persons living with HIV. Instead, funds are distributed according to the number of AIDS cases reported to surveillance systems. These data are not representative of current trends in the epidemic and may be rewarding areas for having poorer health care systems.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This quarter, we had 33 diagnoses of HIV infection (regardless of AIDS status), which is a little above our usual pace. Fifteen (45%) received concurrent diagnoses of AIDS. There were 8 persons who converted from HIV to AIDS, for a total of 23 AIDS diagnoses, also a little higher than expected. Of note is an increase in the percentage of HIV and AIDS cases diagnosed among Black, non-Hispanic persons during the 1st quarter of 2005. We also saw a bit of an increase in HIV diagnoses among foreign-born persons. It is too early to identify this as a trend; we’ll keep an eye on these numbers through the rest of the year.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This quarter, we saw 17 HIV diagnoses, half the number of persons diagnosed in the first quarter of the year. For the two quarters, there were 50 diagnoses, keeping pace with last year’s number of diagnoses. Nineteen of the 50 (38%) received concurrent AIDS diagnoses. Of concern this year is the high number of persons reported without a risk. Over 40% of new cases were initially reported without a risk. Most of these cases are being investigated by disease prevention specialists. History shows us that a good proportion of these cases will be assigned to a risk category in the coming months as more is learned about their risks and the risks of their partners. Note that only 17% of cases diagnosed in 2004 remain without a known risk. There were 36 AIDS diagnoses in the first two quarters of 2005, just a bit ahead of what we saw last year. Fifteen of these were persons who had been diagnosed with HIV at least one year (fifteen years for two persons), and the rest received concurrent HIV and AIDS diagnoses.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The members of the Iowa Concrete Paving Association, the National Concrete Pavement Technology Center Research Committee, and the Iowa Highway Research Board commissioned a study to examine alternative ways of developing transverse joints in portland cement concrete pavements. The present study investigated six separate variations of vertical metal strips placed above and below the dowels in conventional baskets. In addition, the study investigated existing patented assemblies and a new assembly developed in Spain and used in Australia. The metal assemblies were placed in a new pavement and allowed to stay in place for 30 days before the Iowa Department of Transportation staff terminated the test by directing the contractor to saw and seal the joints. This report describes the design, construction, testing, and conclusions of the project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This manual summarizes the roadside tree and brush control methods used by all of Iowa's 99 counties. It is based on interviews conducted in Spring 2002 with county engineers, roadside managers and others. The target audience of this manual is the novice county engineer or roadside manager. Iowa law is nearly silent on roadside tree and brush control, so individual counties have been left to decide on the level of control they want to achieve and maintain. Different solutions have been developed but the goal of every county remains the same: to provide safe roads for the traveling public. Counties in eastern and southern Iowa appear to face the greatest brush control challenge. Most control efforts can be divided into two categories: mechanical and chemical. Mechanical control includes cutting tools and supporting equipment. A chain saw is the most widely used cutting tool. Tractor mounted boom mowers and brush cutters are used to prune miles of brush but have significant safety and aesthetic limitations and boom mowers are easily broken by inexperienced operators. The advent of tree shears and hydraulic thumbs offer unprecedented versatility. Bulldozers are often considered a method of last resort since they reduce large areas to bare ground. Any chipper that violently grabs brush should not be used. Chemical control is the application of herbicide to different parts of a plant: foliar spray is applied to leaves; basal bark spray is applied to the tree trunk; a cut stump treatment is applied to the cambium ring of a cut surface. There is reluctance by many to apply herbicide into the air due to drift concerns. One-third of Iowa counties do not use foliar spray. By contrast, several accepted control methods are directed toward the ground. Freshly cut stumps should be treated to prevent resprouting. Basal bark spray is highly effective in sensitive areas such as near houses. Interest in chemical control is slowly increasing as herbicides and application methods are refined. Fall burning, a third, distinctly separate technique is underused as a brush control method and can be effective if timed correctly. In all, control methods tend to reflect agricultural patterns in a county. The use of chain saws and foliar sprays tends to increase in counties where row crops predominate, and boom mowing tends to increase in counties where grassland predominates. For counties with light to moderate roadside brush, rotational maintenance is the key to effective control. The most comprehensive approach to control is to implement an integrated roadside vegetation management (IRVM) program. An IRVM program is usually directed by a Roadside Manager whose duties may be shared with another position. Funding for control programs comes from the Rural Services Basic portion of a county's budget. The average annual county brush control budget is about $76,000. That figure is thought not to include shared expenses such as fuel and buildings. Start up costs for an IRVM program are less if an existing control program is converted. In addition, IRVM budgets from three different northeastern Iowa counties are offered for comparison in this manual. The manual also includes a chapter on temporary traffic control in rural work zones, a summary of the Iowa Code as it relates to brush control, and rules on avoiding seasonal disturbance of the endangered Indiana bat. Appendices summarize survey and forest cover data, an equipment inventory, sample forms for record keeping, a sample brush control policy, a few legal opinions, a literature search, and a glossary.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The year 1949 saw the Iowa General Assembly’s establishment of the Iowa Secondary Road Research Fund, which led to the creation of a supervisory board within what was then the Iowa State Highway Commission to oversee the expenditure of that fund. The purpose of the fund and the board was to research road construction topics likely to be beneficial to the working of Iowa’s secondary, or local, road system. The supervisory board—called the Iowa Highway Research Board (the “Board”)—was organized by the highway commission in December 1949 and first met in May 1950. The creation of the fund and of the Iowa Highway Research Board marked the first organized effort in the United States to investigate local road construction problems and placed Iowa in the forefront of this field of engineering research. That Iowa should be a leader in such an effort is not surprising, given the early and sustained emphasis of the Iowa State Highway Commission on both research and the dissemination of information to county authorities. Now, 50 years later, a retrospective is in order. To that end, the Iowa Highway Research Board commissioned the preparation of a commemorative history. This work is the result of that project. Throughout its existence, the Board has funded nearly 450 projects, several of national significance. Many new construction and maintenance techniques have been developed, some of which have evolved into standard practices in highway construction. Innovative new materials and equipment have been tested. Still other projects have considered a wide variety of subjects related to the efficient operation of the highway system. Highway safety, conservation, and law have all come under research scrutiny. While it will not be possible, given the short space available, to consider all the projects financed by the Iowa Highway Research Board, it is well worthwhile to examine the Board’s principal projects and its resulting contributions to the field of highway research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fiscal Year 2010 proved to be a year of many challenges. While the nation and the state dealt with an unprecedented economic downturn, a growing number of Iowa families sought assistance to pay higher education costs. The year saw Iowa’s unemployment rate soar to a 23-year high, contributing to a 22 percent increase in enrollment at Iowa’s colleges and universities. An increasing number of Iowans applied for financial aid to pay for college as evidenced by a 47 percent increase in the number of Free Applications for Federal Student Aid (FAFSA) completed over the past 5 years. The economic downturn also forced the State to make a 10 percent reduction in all general fund appropriations which reduced the total amount of state-funded financial aid available to assist families.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Motorcycle Operator Manual states that when a motorcycle and another vehicle collide, more than half of these crashes are caused by drivers entering the rider’s right-of-way. Furthermore, in crashes with motorcyclists, drivers often say they never saw the motorcycle. Therefore, increasing motorcycle conspicuity could help address these issues, resulting in fewer crashes (and injuries and damage).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Experiments with early entry light sawing of Portland cement concrete (PCC) contraction joints began in Iowa in 1989. Since that time, changes in early sawing equipment have occurred as well as changes in specifications for sawing. The option to use early sawing for transverse contraction joints was specified in 1992. A problem happening occasionally with early sawing was the break out of some of the concrete around the end of the joint as the saw blade approached the edge of the slab. To prevent this, it was proposed that the sawing would terminate approximately 1/2" to 3/4" before the edge of the slab, creating a "short joint". This procedure would also leave a concrete "dam" to prevent the run-out and waste of the hot liquid joint sealant onto the shoulder. It would also eliminate the need for the labor and material for applying a duct tape dam at the open ends of each sawed joint to stop hot liquid sealant run-out Agreements were made with the contractor to apply the "short joint" technique for 1 day of paving. The evaluation and results are compared with an adjoining control section. The research found no negative aspects from sawing the "short joint". Three specific findings were noted. They are the following: 1) No joint end "blow-out" spalls of concrete occurred. 2) The need for the duct tape dam to stop liquid sealant overflow was eliminated. 3) Joint end corner spalls appear to be caused mainly by construction shouldering operations equipment. The "short joint" sawing technique can be routinely applied to early entry sawed transverse contraction joints with expectations of only positive results.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT) through the Highway Division is responsible for the design, construction and maintenance of roadways that will provide a high level of serviceability to the motorist. First, the motorist expects to be able to get where he wants to go, but now he also demands a minimum level of comfort. In the construction of new roadways, the public is quick to express dissatisfaction with rough pavements. The Highway Division of the Iowa DOT (formerly Iowa State Highway Commission) has a specification which requires a "smooth-riding surface". For over 40 years, new portland cement concrete (pcc) pavement has been checked with a 10-foot rolling straightedge. The contractor is required to grind, saw or mill off all high spots that deviate more than 1/8" from the 10-foot straight line. Unfortunately, there are instances where a roadway that will meet the above criteria does not provide a "smooth-riding surface". The roadway may have monger undulations (swales) that result in an undesirable ride. The objective of this project was to develop a repeatable, reliable time stable, lightweight test unit to measure the riding quality of pcc pavement at normal highway speed the day after construction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research was initiated to identify methods of reducing the occurrence of transverse cracking. Eight (four repetitive) research sections were established to study three variations in the asphalt concrete pavement. The first variation was the comparison of low- and high-temperature-susceptible asphalt cement (AC) from two different sources. The second variable was to saw and seal transverse joints at spacings varying from 40 to 100 ft. The third variable was to increase the AC content in the asphalt treated base by 1 percent. The research sections were constructed with relatively few problems. Crack and joint surveys have been conducted on all research sections at intervals of less than 1 year since construction. No cracking was identified after the first winter season. The sawed joints also remained sealed through the first winter. At an age of approximately 1 1/2 years there was substantial cracking of the high-temperature-susceptible AC sections and substantial failure of the sealant material in the sawed joints. After almost 4 years, the asphalt pavement constructed with the high-temperature-susceptible AC produced a crack interval of 35 ft, the low-temperature-susceptible AC yielded an interval of 170 ft, and the low-temperature-susceptible AC with an increased AC content yielded an interval of 528 ft. The Pen-Vis number is an effective measure of temperature susceptibility of asphalt cements. The frequency of transverse cracking is affected by the temperature susceptibility of the AC. An increased AC content also reduces the frequency of transverse cracking.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research project investigated the use of image analysis to measure the air void parameters of concrete specimens produced under standard laboratory conditions. The results obtained from the image analysis technique were compared to results obtained from plastic air content tests, Danish air meter tests (also referred to as Air Void Analyzer tests), high-pressure air content tests on hardened concrete, and linear traverse tests (as per ASTM C-457). Hardened concrete specimens were sent to three different laboratories for the linear traverse tests. The samples that were circulated to the three labs consisted of specimens that needed different levels of surface preparation. The first set consisted of approximately 18 specimens that had been sectioned from a 4 in. by 4 in. by 18 in. (10 cm by 10 cm by 46 cm) beam using a saw equipped with a diamond blade. These specimens were subjected to the normal sample preparation techniques that were commonly employed by the three different labs (each lab practiced slightly different specimen preparation techniques). The second set of samples consisted of eight specimens that had been ground and polished at a single laboratory. The companion labs were only supposed to retouch the sample surfaces if they exhibited major flaws. In general, the study indicated that the image analysis test results for entrained air content exhibited good to strong correlation to the average values determined via the linear traverse technique. Specimens ground and polished in a single laboratory and then circulated to the other participating laboratories for the air content determinations exhibited the strongest correlation between the image analysis and linear traverse techniques (coefficient of determination, r-squared = 0.96, for n=8). Specimens ground and polished at each of the individual laboratories exhibited considerably more scatter (coefficient of determination, r-squared = 0.78, for n=16). The image analysis technique tended to produce low estimates of the specific surface of the voids when compared to the results from the linear traverse method. This caused the image analysis spacing factor calculations to produce larger values than those obtained from the linear traverse tests. The image analysis spacing factors were still successful at distinguishing between the frost-prone test specimens and the other (more durable) test specimens that were studied in this research project.