2 resultados para Rough Set

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report highlights the landmark election legislation adopted in the past two years and statistical information on absentee ballots, provisional ballots, and Election Day Registration. In addition, the report outlines the responsibilities of our Business Services Division which handles hundreds of thousands of corporate filings annually. The Secretary of State’s proposals to the 83rd General Assembly for 2009 legislation are mostly technical in nature and are also set forth in this report. The presidential election on November 4, 2008, brought more voters to the polls in Iowa than ever before. Despite fears of election day problems due to new voting equipment, Election Day Registration, and challenged voter procedures, the election went very smoothly in Iowa. The Elections and Voter Registration Division of my office worked diligently to provide training materials for election administrators and fielded thousands of calls and emails from voters. The result was an efficiently-run election statewide. Though the Secretary of State’s Office, like all other state agencies, is operating under strict budgetary constraints, I assure you that my staff and I will continue to provide excellent service and develop innovative solutions to get through these rough economic times.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The large volume of traffic on the interstate system makes it difficult to make pavement repairs. The maintenance crew needs 4-5 hours to break out the concrete to be replaced and prepare the hole for placing new concrete. Because of this it is usually noon before the patch can be placed. Since it is desirable to remove the barricades before dark there are only 7-8 hours for the concrete to reach the required strength. There exists a need for a concrete that can reach the necessary strength (modulus of rupture = 500 psi) in 7-8 hours. The purpose of this study is to determine if type III cement and/or an accelerator can be used in an M-4 mix to yield a fast setting patch with very little shrinkage. It is recognized that calcium chloride is a corrosive material and may therefore have detrimental effects upon the reinforcing steel. The study of these effects, however, is beyond the scope of this investigation.