Resumo:
Article 2120 of the Standard Specifications for Highway and Bridge Construction Series 2009 provides for a fuel adjustment factor to be applied to payments and partial payments for quantities of certain items of excavation work as the work is done, in accordance with the specification, when indicated in the contract documents. A Current Price Index (CPI), in dollars per gallon (liter), will be established by the DOT for each month. The CPI will be the price of No. 2 High Sulfur Diesel, as reported by Oil Price Information Service using the first weekday for the month and the average of all prices reported for Des Moines. The Base Price Index (BPI) for each contract will be the CPI in effect during the month previous to the month of the letting of that contract. If the contract has metric units, divide the Price Index ($/gal) by 3.785412 to obtain $/liter.
Resumo:
Article 2120 of the Standard Specifications for Highway and Bridge Construction Series 2009 provides for a fuel adjustment factor to be applied to payments and partial payments for quantities of certain items of excavation work as the work is done, in accordance with the specification, when indicated in the contract documents. A Current Price Index (CPI), in dollars per gallon (liter), will be established by the DOT for each month. The CPI will be the price of No. 2 High Sulfur Diesel, as reported by Oil Price Information Service using the first weekday for the month and the average of all prices reported for Des Moines. The Base Price Index (BPI) for each contract will be the CPI in effect during the month previous to the month of the letting of that contract. If the contract has metric units, divide the Price Index ($/gal) by 3.785412 to obtain $/liter.
Resumo:
Remote sensing was utilized in the Phase II Cultural Resources Investigation for this project in lieu of extensive excavations. The purpose of the present report is to compare the costs and benefits of the use of remote sensing to the hypothetical use of traditional excavation methods for this project. Estimates for this hypothetical situation are based on the project archaeologist's considerable past experience in conducting similar investigations. Only that part of the Phase II investigation involving field investigations is addressed in this report. Costs for literature review, laboratory analysis, report preparation, etc., are not included. The project manager proposed the use of this technique for the fol lowing logistic, safety and budgetary reasons.