124 resultados para Road closures
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
This project explores the user costs and benefits of winter road closures. Severe winter weather makes travel unsafe and dramatically increases crash rates. When conditions become unsafe due to winter weather, road closures should allow users to avoid crash costs and eliminate costs associated with rescuing stranded motorists. Therefore, the benefits of road closures are the avoided safety costs. The costs of road closures are the delays that are imposed on motorists and motor carriers who would have made the trip had the road not been closed. This project investigated the costs and benefits of road closures and found that evaluating the benefits and costs is not as simple as it appears. To better understand the costs and benefits of road closures, the project investigates the literature, conducts interviews with shippers and motor carriers, and conducts case studies of road closures to determine what actually occurred on roadways during closures. The project also estimates a statistical model that relates weather severity to crash rates. Although, the statistical model is intended to illustrate the possibility to quantitatively relate measurable and predictable weather conditions to the safety performance of a roadway. In the future, weather conditions such as snow fall intensity, visibility, etc., can be used to make objective measures of the safety performance of a roadway rather than relying on subjective evaluations of field staff. The review of the literature and the interviews clearly illustrate that not all delays (increased travel time) are valued the same. Expected delays (routine delays) are valued at the generalized costs (value of the driver’s time, fuel, insurance, wear and tear on the vehicle, etc.), but unexpected delays are valued much higher because they result in interruption of synchronous activities at the trip’s destination. To reduce the costs of delays resulting from road closures, public agencies should communicate as early as possible the likelihood of a road closure.
Resumo:
Efforts to improve safety and traffic flow through merge areas on high volume/high speed roadways have included early merge and late merge concepts and several studies of the effectiveness of these concepts, many using Intelligent Transportation Systems for implementation. The Iowa Department of Transportation (Iowa DOT) planned to employ a system of dynamic message signs (DMS) to enhance standard temporary traffic control for lane closures and traffic merges at two bridge construction projects in western Iowa (Adair County and Cass County counties) on I-80 during the 2008 construction season. To evaluate the DMS system’s effectiveness for impacting driver merging actions, the Iowa DOT contracted with Iowa State University’s Center for Transportation Research and Education to perform the evaluation and make recommendations for future use of this system based on the results. Data were collected over four weekends, beginning August 1–4 and ending October 16–20, 2008. Two weekends yielded sufficient data for evaluation, one of transition traffic flow and the other with a period of congestion. For both of these periods, a statistical review of collected data did not indicate a significant impact on driver merging actions when the DMS messaging was activated as compared to free flow conditions with no messaging. Collection of relevant project data proved to be problematic for several reasons. In addition to personnel safety issues associated with the placement and retrieval of counting devices on a high speed roadway, unsatisfactory equipment performance and insufficient congestion to activate the DMS messaging hampered efforts. A review of the data that was collected revealed different results taken by the tube counters compared to the older model plate counters. Although variations were not significant from a practical standpoint, a statistical evaluation showed that the data, including volumes, speeds, and classifications from the two sources were not comparable at a 95% level of confidence. Comparison of data from the Iowa DOT’s automated traffic recorders (ATRs) in the area also suggested variations in results from these data collection systems. Additional comparison studies were recommended.
Resumo:
The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snowpack in the upper basin on the ground longer into the spring, setting the stage for this historic event. The U.S. Army Corps of Engineers (USACE) began increasing the outflow at Gavin’s Point, near Yankton, South Dakota in May. On June 14, 2011, the outflow reached a record rate of over 160,000 cubic feet per second (cfs), over twice the previous record outflow set in 1997. This increased output from Gavin’s Point caused the Missouri River to flow out of its banks covering over 283,000 acres of land in Iowa, forcing hundreds of evacuations, damaging 255,000 acres of cropland and significantly impacting the levee system on the Missouri River basin. Over the course of the summer, approximately 64 miles of primary roads closed due to Missouri River flooding, including 54 miles of Interstate Highway. Many county secondary roads were closed by high water or overburdened due to the numerous detours and road closures in this area. As the Missouri River levels began to increase, municipalities and counties aided by State and Federal agencies began preparing for a sustained flood event. Citizens, businesses, state agencies, local governments and non‐profits made substantial preparations, in some cases expending millions of dollars on emergency protective measures to protect their facilities from the impending flood. Levee monitors detected weak spots in the levee system in all affected counties, with several levees being identified as at risk levees that could potentially fail. Of particular concern was the 28 miles of levees protecting Council Bluffs. Based on this concern, Council Bluffs prepared an evacuation plan for the approximately 30,000 residents that resided in the protected area. On May 25, 2011, Governor Branstad directed the execution of the Iowa Emergency Response Plan in accordance with Section 401 of the Stafford Act. On May 31, 2011, HSEMD Administrator, Brigadier General J. Derek Hill, formally requested the USACE to provide technical assistance and advanced measures for the communities along the Missouri River basin. On June 2, 2011 Governor Branstad issued a State of Iowa Proclamation of Disaster Emergency for Fremont, Harrison, Mills, Monona, Pottawattamie, and Woodbury counties. The length of this flood event created a unique set of challenges for Federal, State and local entities. In many cases, these organizations were conducting response and recovery operations simultaneously. Due to the length of this entire event, the State Emergency Operations Center and the local Emergency Operations Centers remained open for an extended period of time, putting additional strain on many organizations and resources. In response to this disaster, Governor Branstad created the Missouri River Recovery Coordination Task Force to oversee the State’s recovery efforts. The Governor announced the creation of this Task Force on October 17, 2011 and appointed Brigadier General J. Derek Hill, HSEMD Administrator as the chairman. This Task Force would be a temporary group of State agency representatives and interested stakeholders brought together to support the recovery efforts of the Iowa communities impacted by the Missouri River Flood. Collectively, this group would analyze and share damage assessment data, coordinate assistance across various stakeholders, monitor progress, capture best practices and identify lessons learned.
Resumo:
Several accidents, some involving fatalities, have occurred on U.S. Highway 30 near the Archer Daniels Midland Company (ADM) Corn Sweeteners plant in Cedar Rapids, Iowa. A contributing factor to many of these accidents has been the large amounts of water (vapor and liquid) emitted from multiple sources at ADM's facility located along the south side of the highway. Weather and road closure data acquired from IDOT have been used to develop a database of meteorological conditions preceding and accompanying closure of Highway 30 in Cedar Rapids. An expert system and a FORTRAN program were developed as aids in decision making with regard to closure of Highway 30 near the plant. The computer programs were used for testing, evaluation, and final deployment. Reports indicate the decision tools have been successfully implemented and were judged to be helpful in forecasting road closures and in reducing costs and personnel time in monitoring the roadway.
Resumo:
Final report of road equipment procurement and utilization study.
Resumo:
This report was prepared by a committee of city, county and state representatives. The committee met throughout 2002 with the purpose of reviewing and making recommendations to improve the efficiency and operation of Iowa's road and street system. This report is referenced in SF 451 and in Code Section 306.8A.
Resumo:
This report presents the findings and recommendations of the Secondary Road Fund Distribution Advisory Committee (SRFDAC) established by SF 2192 of the 2002 Iowa Acts.
Resumo:
Iowa Workforce Development research conducted in 2001 on Iowa workers displaced by layoffs indicated that post-layoff wages remained at or above pre-layoff levels. During the layoff quarters selected for analysis – first, second, and third quarters of 1998 – there were twenty-one layoff events, none of which were closures. The research at that time did not discriminate between closures or permanent layoffs for which no recall was expected and those layoff events expected to recall workers. The post/pre ratios1 of the affected workers in manufacturing were at or above 100%, while remaining slightly below the universe pre/post ratios for the same time period.
Resumo:
An Iowa State University–led team facilitated development of the CP Road Map. They developed a database of existing research. They gathered input, face to face, from the highway community. They identified gaps in research that became the basis for problem statements, which they organized into a cohesive, strategic research plan.
Resumo:
An Iowa State University–led team facilitated development of the CP Road Map. They developed a database of existing research. They gathered input, face to face, from the highway community. They identified gaps in research that became the basis for problem statements, which they organized into a cohesive, strategic research plan.
Resumo:
An Iowa State University–led team facilitated development of the CP Road Map. They developed a database of existing research. They gathered input, face to face, from the highway community. They identified gaps in research that became the basis for problem statements, which they organized into a cohesive, strategic research plan.
Resumo:
Newsletter by the Iowa Department of Vocational Rehabilitation
Resumo:
Monthly newsletter produced by Iowa Department of Vocational Rehabilitation
Resumo:
Monthly newsletter produced by Iowa Department of Vocational Rehabilitation
Resumo:
Monthly newsletter produced by Iowa Department of Vocational Rehabilitation