Research Project HR-124, "Development of a Laboratory Durability Test for Asphalts," was initiated in 1966 as a long range comprehensive program. Its ultimate objective was to develop a simple, rapid laboratory test that could be used by highway engineers to select paving asphalt according to quality, to identify inferior asphalts, and to reasonably predict the useful life of asphalts once they were incorporated in the pavements. This report, designated Progress Report No. 3, summarizes the work accomplished during the second year of the HR-124 extension (1967 - 1969), i. e., the period from 1 October 1968 to 31 October 1969.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report summarizes work accomplished under Project HR-142 during the period from January 1, 1969 to December 31, 1969. Pore characteristics of six limestones were studied in relation to their absorption of two asphalt cements. Porosity and pore size distribution were determined by a mercury penetration porosimeter and asphalt absorption was determined by immersion and bulk-impregnated specific gravity methods. A special study was conducted to develop new, simple and more reproducible methods for bulk specific gravity determination. As a result, a new chemical indicator method was developed to determine the saturated surface-dry condition, and a glass mercury pycnometer was designed to determine coarse·and fine aggregates. Asphalt absorption history of one asphalt mixture on campus has been studied since September 1968. Chemical and/or radiation treatments of absorptive aggregates were conducted on four chemicals and two aggregates.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The major objective of this research project is to investigate how fly ash influences the chemical durability of portland cement based materials. The testing program is evaluating how Iowa fly ashes influence the sulfate durability of portland cement-fly ash pastes, mortars, and concretes. Also, alkali-reactivity studies are being conducted on mortar bar specimens prepared in accordance with ASTM C 311. Prelimary sulfate test results, based only on mortar bar studies, indicate that only the very high-calcium fly ash (29 percent CaO, by weight) consistently reduced the durability of test specimens exposed to a solution containing 5 percent sodium sulfate. The remaining four fly ashes that were used in the study showed negligible to dramatic increases in sulfate resistance. Concrete specimens were only beginning to respond to the sulfate solutions after about one year of exposure; and hence, considerably more time will be needed to assess their performance. Preliminary results from the alkali-reactivity tests have indicated that the Oreopolis aggregate is not sensitive to alkali attack. However, some of the test results have indicated that the testing procedure may be prone to delayed expansion due to the presence of periclase (MgO) in the Class C fly ashes. Research is being planned to: (1) verify if the periclase is influencing test results; and (2) estimating the magnitude of the potential error.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1951, a total of 68,869 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2676 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads ----------------- $24,000,000 For secondary roads---------------- $41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) Unobligated available farm to market road funds are rapidly being placed under contract. (i) The letting of highway contracts is increasing rapidly. (j)- Iowa's highway program is estimated to cost $945,000,000 and will require twenty years to build. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1952, a total of 71,493 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2662 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads------------------$23,000,000 For secondary roads---------------- 41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) The surplus of farm to market road funds created during and immediately following the War have now been placed under contract, with only a minimum working balance remaining in the fund. (i) Iowa's highway program was estimated to cost $945,000,000 and to require twenty years to build, by the 1948 Legislative Committee. This estimate would now have to be increased due to price increases and higher required standards. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

(a) Iowa has a total of 101,451 miles of rural roads, both primary and secondary. (b) On January 1, l954, a total of 77,024 miles of these rural roads were surfaced - mostly with gravel and crushed stone. This is 5,53l miles greater than on January l, 1952. (c) Additional roads are being surfaced at the rate of 2766 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 25.4 per cent from property taxes and special taxes......................................$29,708,546.67 63.7 per cent from road use taxes.......... 74,581,080.30 10.6 per cent from Federal Aid (1952 Act).. 12,424,000.00 0.3 per cent from miscellaneous receipts.. 287,922.86 ---- ------------- 100.0 $117,001,549.83 (f) Annual income under present laws, available for highway construction, is approximately, For primary roads $29,420,000.00 For secondary roads $44,328,000.00 In 19_3, $7,299,000 of secondary road construction funds was transferred to the maintenance fund. (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The following report summarizes research activities on the project for the period December 1, 1985 through November 31, 1986. Research efforts for the first year have proceeded basically as outlined in the project proposal.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The following report summarizes research activities on the project for the period December 1, 1986 to November 30, 1987. Research efforts for the second year deviated slightly from those described in the project proposal. By the end of the second year of testing, it was possible to begin evaluating how power plant operating conditions influenced the chemical and physical properties of fly ash obtained from one of the monitored power plants (Ottumwa Generating Station, OGS). Hence, several of the tasks initially assigned to the third year of the project (specifically tasks D, E, and F) were initiated during the second year of the project. Manpower constraints were balanced by delaying full scale implementation of the quantitative X-ray diffraction and differential thermal analysis tasks until the beginning of the third year of the project. Such changes should have little bearing on the outcome of the overall project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Research activities during this period concentrated on continuation of field and laboratory testing for the Dallas County test road. Stationary ditch collection of dust was eliminated because of inconsistent data, and because of vandalism to collectors. Braking tests were developed and initiated to evaluate the influence of treatments on braking and safety characteristics of the test sections. Dust testing was initiated for out of the wheelpath conditions as well as in the wheelpath. Contrary to the results obtained during the summer and fall of 1987, the 1.5 percent bentonite treatment appears to be outperforming the other bentonite treated sections after over a year of service. Overall dust reduction appears to average between 25 to 35 percent. Dallas County applied 300 tons per mile of class A roadstone maintenance surfacing to the test road in August 1988. Test data indicates that the bentonite is capable of interacting and functioning to reduce dust generation of the new surfacing material. Again, the 1.5 percent bentonite treatment appeared the most effective. The fine particulate bonding and aggregation mechanism of the bentonite appears recoverable from the environmental effects of winter, and from alternating wet and dry road surface conditions. The magnesium chloride treatment appears capable of long-term (over one year) dust reduction and exhibited an overall average reduction in the range of 15 to 30 percent. The magnesium chloride treatment also appears capable of interacting with newly applied crushed stone to reduce dust generation. Two additional one mile test roads were to have been constructed early this year. Due to an extremely dry spring and summer, construction scheduling was not possible until August. This would have allowed only minimal data collection. Considering this and the fact that this was an atypically dry summer, it was our opinion that it would be in the best interest of the research project to extend the project (at no additional cost) for a period of one year. The two additional test roads will be constructed in early spring 1989 in Adair and Marion counties.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The following report summarizes research activities conducted on Iowa Department of Transportation Project HR-327, for the period April 1, 1990 through March 31, 1991. The purpose of this research project is to investigate how fly ash influences the chemical durability of portland cement based materials. The goal of this research is to utilize the empirical information obtained from laboratory testing to better estimate the durability of portland cement concrete pavements (with and without fly ash) subjected to chemical attack via the natural environment or the application of deicing salts. This project is being jointly sponsored by the Iowa Department of Transportation and the Iowa Fly Ash Affiliate Research group. The research work is also being cooperatively conducted by Iowa State University and Iowa Department of Transportation research personnel. Researchers at Iowa State University are conducting the paste and mortar studies while Iowa Department of Transportation researchers are conducting the concrete study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Nutrient Reduction Strategy (NRS) is a research- and technology-based approach to assess and reduce nutrients—nitrogen and phosphorus—delivered to Iowa waterways and the Gulf of Mexico by 45 percent. To measure progress, researchers track many different factors, from inputs (e.g. funding) and the human domain (e.g. farmer perspectives) to land management (e.g. on-farm practices) and water quality. Monitoring Iowa streams provides valuable insight into measuring water quality progress and the reduction of surface water nutrient loss. The Iowa Nutrient Reduction Strategy (NRS) aims to reduce the load, or total amount (e.g. tons), of nutrients lost annually. Researchers calculate the load from water monitoring results, which measure concentration combined with stream flow.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Nutrient Reduction Strategy (NRS) is a research- and technology-based approach to assess and reduce nutrients delivered to Iowa waterways and the Gulf of Mexico. The strategy outlines opportunities for efforts to reduce nutrients in surface water from both point sources, such as wastewater treatment plants and industrial facilities, and nonpoint sources, including farm fields and urban areas, in a scientific, reasonable, and cost-effective manner.