69 resultados para Regulatory compliance
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
This fact sheets summarizes, in brief form, the compliance requirements for transportation, storage, handling and use of propane. It is not intended to provide comprehensive guidance on regulatory compliance for those dealing with propane, but to highlight those requirements and to assist those who may be affected by the various requirements to obtain detailed information when needed. Information about requirements which apply to the use of propane as a motor fuel is not included.
Resumo:
This fact sheets summarizes, in brief form, the compliance requirements for transportation, storage, handling and use of propane. It is not intended to provide comprehensive guidance on regulatory compliance for those dealing with propane, but to highlight those requirements and to assist those who may be affected by the various requirements to obtain detailed information when needed. Information about requirements which apply to the use of propane as a motor fuel is not included.
Resumo:
The purpose of this investigation was to evaluate the Compensatory Wetland Mitigation Program at the Iowa Department of Transportation (DOT) in terms of regulatory compliance. Specific objectives included: 1) Determining if study sites meet the definition of a jurisdictional wetland. 2) Determining the degree of compliance with requirements specified in Clean Water Act Section 404 permits. A total of 24 study sites, in four age classes were randomly selected from over 80 sites currently managed by the Iowa DOT. Wetland boundaries were delineated in the field and mitigation compliance was determined by comparing the delineated wetland acreage at each study site to the total wetland acreage requirements specified in individual CWA Section 404 permits. Of the 24 sites evaluated in this study, 58 percent meet or exceed Section 404 permit requirements. Net gain ranged from 0.19 acre to 27.2 acres. Net loss ranged from 0.2 acre to 14.6 acres. The Denver Bypass 1 site was the worst performer, with zero acres of wetland present on the site and the Akron Wetland Mitigation Site was the best performer with slightly more than 27 acres over the permit requirement. Five of the 10 under-performing sites are more than five years post construction, two are five years post construction, one is three years post construction and the remaining two are one year post construction. Of the sites that meet or exceed permit requirements, approximately 93 percent are five years or less post construction and approximately 43 percent are only one year old. Only one of the 14 successful sites is more than five years old. Using Section 404 permit acreage requirements as the criteria for measuring success, 58 percent of the wetland mitigation sites investigated as part of this study are successful. Using net gain/loss as the measure of success, the Compensatory Wetland Mitigation Program has been successful in creating/restoring nearly 44 acres of wetland over what was required by permits.
Resumo:
Iowa is one of the more progressive recycling states in the U.S. due in large part to its environmental technical assistance programs for business. The Iowa Department of Economic Development (IDED), Iowa Department of Natural Resources (IDNR), the Recycle Reuse Technology Transfer Center (RRTTC) and the Iowa Waste Reduction Center (IWRC) work together to offer services that help businesses save money, increase operational efficiencies, enhance regulatory compliance and manage difficult waste management issues.
Resumo:
Iowa is one of the more progressive recycling states in the U.S. due in large part to its environmental technical assistance programs for business. The Iowa Department of Economic Development (IDED), Iowa Department of Natural Resources (IDNR), the Recycle Reuse Technology Transfer Center (RRTTC) and the Iowa Waste Reduction Center (IWRC) work together to offer services that help businesses save money, increase operational efficiencies, enhance regulatory compliance and manage difficult waste management issues.
Resumo:
The purpose of this investigation was to evaluate the Compensatory Wetland Mitigation Program at the Iowa Department of Transportation (DOT) in terms of regulatory compliance. Specific objectives included: 1) Determining if study sites meet the definition of a jurisdictional wetland. 2) Determining the degree of compliance with requirements specified in Clean Water Act Section 404 permits. A total of 24 study sites, in four age classes were randomly selected from over 80 sites currently managed by the Iowa DOT. Wetland boundaries were delineated in the field and mitigation compliance was determined by comparing the delineated wetland acreage at each study site to the total wetland acreage requirements specified in individual CWA Section 404 permits. Of the 24 sites evaluated in this study, 58 percent meet or exceed Section 404 permit requirements. Net gain ranged from 0.19 acre to 27.2 acres. Net loss ranged from 0.2 acre to 14.6 acres. The Denver Bypass 1 site was the worst performer, with zero acres of wetland present on the site and the Akron Wetland Mitigation Site was the best performer with slightly more than 27 acres over the permit requirement. Five of the 10 under-performing sites are more than five years post construction, two are five years post construction, one is three years post construction and the remaining two are one year post construction. Of the sites that meet or exceed permit requirements, approximately 93 percent are five years or less post construction and approximately 43 percent are only one year old. Only one of the 14 successful sites is more than five years old. Using Section 404 permit acreage requirements as the criteria for measuring success, 58 percent of the wetland mitigation sites investigated as part of this study are successful. Using net gain/loss as the measure of success, the Compensatory Wetland Mitigation Program has been successful in creating/restoring nearly 44 acres of wetland over what was required by permits.
Resumo:
The Iowa Department of Economic Development (IDED) helps businesses expand or locate all or part of their business in Iowa. It just makes sense for companies engaged in advanced manufacturing, biosciences and information solutions/financial services to look at Iowa and IDED helps to ensure their economic development timelines are met. Iowa is nationally recognized as an innovator in helping businesses by meeting their development needs in a timely and effective manner. IDED networks with Regulatory Assistance Coordinators in agencies across state government to reduce response time to businesses. This agency coordination helps to ensure that regulatory and compliance questions, or other needs associated with project site development and facility expansion are serviced quickly. We have listed information below about some of the more common regulatory requirements related to site development and expansion.
Resumo:
This project investigated regulatory issues that may affect or limit freight movement in Iowa and other Midwest states: Illinois, Kansas, Minnesota, Missouri, Nebraska, South Dakota, and Wisconsin. Current state regulations for the following are reviewed and summarized: - Vehicle dimensions - Vehicle weights - Speed limits - Weight compliance enforcement - Fees and taxes - Driver qualifications - Medical certification - Hours of service - Oversize-overweight permits
Resumo:
The plan is prepared in compliance with Executive Order Number Nine, issued September 14, 1999. Section IV of that order defines a “regulatory action” as a potential rule that is currently under active consideration or development with the agency that the agency reasonably expects to issue in proposed or final form.
Resumo:
Report for the Iowa Utilities Board
Resumo:
Report for Iowa Utilities Board
Resumo:
Regulatory Plan for Fiscal Year 2005
Resumo:
Regulatory Plan for Fiscal Year 2003
Resumo:
The purpose of this handbook is to provide the user with an educational and process reference guide. This is a guide that the reader may utilize to learn Iowa’s reporting and compliance system and also as a handy day-to-day document that may be referred to thereby assisting that individual and/or entity to understand and maintain compliance with Iowa Workers’ Compensation statutes and rules and the requirements required therein.
Resumo:
This plan is intended to implement Governor Vilsack’s Executive Order Number 9, V, signed September 14, 1999. This plan provides the Division of Workers’ Compensation anticipated regulatory actions for potential rule making activity for State Fiscal Year 2005, which began July 1, 2004, and thereafter.