This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With the support of the Iowa Fly Ash Affiliates, research on reclaimed fly ash for use as a construction material has been ongoing since 1991. The material exhibits engineering properties similar to those of soft limestone or sandstone and a lightweight aggregate. It is unique in that it is rich in calcium, silica, and aluminum and exhibits pozzolanic properties (i.e. gains strength over time) when used untreated or when a calcium activator is added. Reclaimed Class C fly ashes have been successfully used as a base material on a variety of construction projects in southern and western Iowa. A pavement design guide has been developed with the support of the Iowa Fly Ash Affiliates. Soils in Iowa generally rate fair to poor as subgrade soils for paving projects. This is especially true in the southern quarter of the state and for many areas of eastern and western Iowa. Many of the soil types encountered for highway projects are unsuitable soils under the current Iowa DOT specifications. The bulk of the remaining soils are Class 10 soils. Select soils for use directly under the pavement are often difficult to find on a project, and in many instances are economically unavailable. This was the case for a 4.43-mile grading (STP-S- 90(22)-SE-90) and paving project in Wapello County. The project begins at the Alliant Utilities generating station in Chillicothe, Iowa, and runs west to the Monroe-Wapello county line. This road carries a significant amount of truck traffic hauling coal from the generating station to the Cargill corn processing plant in Eddyville, Iowa. The proposed 10-inch Portland Cement Concrete (PCC) pavement was for construction directly on a Class 10 soil subgrade, which is not a desirable condition if other alternatives are available. Wapello County Engineer Wendell Folkerts supported the use of reclaimed fly ash for a portion of the project. Construction of about three miles of the project was accomplished using 10 inches of reclaimed fly ash as a select fill beneath the PCC slab. The remaining mile was constructed according to the original design to be used as a control section for performance monitoring. The project was graded during the summers of 1998 and 1999. Paving was completed in the fall of 1999. This report presents the results of design considerations and laboratory and field testing results during construction. Recommendations for use of reclaimed fly ash as a select fill are also presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Three comparable hot mixed asphalt paving mixes were produced using two different aggregates produced from reclaimed portland cement concrete paving and one from a crushed limestone aggregate. These were subjected both dry and soaked to indirect tensile tests to determine the wet strength retention. One mix made from reclaimed concrete demonstrated a slightly better strength retention than the limestone mix and the other less. Satisfactory asphalt paving mixes can be produced from reclaimed concrete pavements but the increased asphalt demand (about 1%) negates part of the potential savings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Central Park Lake Watershed Assessment and Management Plan identified four categories where improvements are needed to remove the 23 acre lake from the impaired waters list. These include the wastewater system, runoff from surrounding lands, in-lake nutrient re-suspension and runoff from hard surfaces within the park. The lake is currently impaired for bacteria, algae and pH. Through outcomes of the Watershed Assessment and Management Plan, this proposal includes for abandonment and reclamation of the single cell wastewater lagoon site, replacement with three conventional septic systems and construction of two wetlands. One of the wetlands is located on the same site as the reclaimed lagoon and the other is located to intercept sediment and trap nutrients transported by tile lines. The prescribed wastewater system improvements are based on assessment by grab samples test by the State Hygienic Lab, development of a Preliminary Engineering Report, soil analysis and communication with IDNR wastewater officials. The two wetland sites were assessed by officials from IDALS and the Jones County SWCD. This project is part of $1.7 million lake restoration effort to reclaim the 47 year old lake. The lake has a positive economic impact of more than $7.6 million annually and supports an average annual visitation of 58,145, according to the Iowa Lakes Valuation Project, conducted by Iowa State University.