18 resultados para Random access system

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report on a review of selected general and application controls for the Iowa Department of Education’s Electronic Access System for Iowa Education Records (EASIER) system for the period April 4 through May 10, 2011

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This is the annual performance report for the Individuals with Disabilities Education Act, Part C, which was submitted on February 2, 2010 to the United States Department of Education, Office of Special Education Programs. The report provides data on the State's Early ACCESS system and the 10 Regional Grantees' performance in 14 national indicators.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As a guide for librarians, library policy makers and the local level, community leaders, local and state policy makers, and library customers across the state, these recommendations create a vision of libraries as friendly, welcoming places where Iowans can access inform ation in person or on-lin e, ob tain, an d use ideas and truste d info rmatio n tha t will enhance their quality of life. This report specifies the steps to achieving this vision and creates an environment of opportunity to m ove s teadily toward the new system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

LEGISLATIVE STUDY – The 83rd General Assembly of the Iowa Legislature, in Senate File 2273, directed the Iowa Department of Transportation (DOT) to conduct a study of how to implement a uniform statewide system to allow for electronic transactions for the registration and titling of motor vehicles. PARTICIPANTS IN STUDY – As directed by Senate File 2273, the DOT formed a working group to conduct the study that included representatives from the Consumer Protection Division of the Office of the Attorney General, the Department of Public Safety, the Department of Revenue, the Iowa State County Treasurer’s Association, the Iowa Automobile Dealers Association, and the Iowa Independent Automobile Dealers Association. CONDUCT OF THE STUDY – The working group met eight times between June 17, 2010, and October 1, 2010. The group discussed the costs and benefits of electronic titling from the perspectives of new and used motor vehicle dealers, county treasurers, the DOT, lending institutions, consumers and consumer protection, and law enforcement. Security concerns, legislative implications, and implementation timelines were also considered. In the course of the meetings the group: 1. Reviewed the specific goals of S.F. 2273, and viewed a demonstration of Iowa’s current vehicle registration and titling system so participants that were not users of the system could gain an understanding of its current functionality and capabilities. 2. Reviewed the results of a survey of county treasurers conducted by the DOT to determine the extent to which county treasurers had processing backlogs and the extent to which county treasurers limited the number of dealer registration and titling transactions that they would process in a single day and while the dealer waited. Only eight reported placing a limit on the number of dealer transactions that would be processed while the dealer waited (with the number ranging from one to four), and only 11 reported a backlog in processing registration and titling transactions as of June 11, 2010, with most backlogs being reported in the range of one to three days. 3. Conducted conference calls with representatives of the American Association of Motor Vehicle Administrators (AAMVA) and representatives of three states -- Kansas, which has an electronic lien and titling (ELT) program, and Wisconsin and Florida, each of which have both an ELT program and an electronic registration and titling (ERT) program – to assess current and best practices for electronic transactions. In addition, the DOT (through AAMVA) submitted a survey to all U.S. jurisdictions to determine how, if at all, other states implemented electronic transactions for the registration and titling of motor vehicles. Twenty-eight states responded to the survey; of the 28 states that responded, only 13 allowed liens to be added or released electronically, and only five indicated allowing applications for registration and titling to be submitted electronically. DOT staff also heard a presentation from South Dakota on its ERT system at an AAMVA regional meeting. ELT information that emerged suggests a multi-vendor approach, in which vendors that meet state specifications for participation are authorized to interface with the state’s system to serve as a portal between lenders and the state system, will facilitate electronic lien releases and additions by offering lenders more choices and the opportunity to use the same vendor in multiple states. The ERT information that emerged indicates a multi-interface approach that offers an interface with existing dealer management software (DMS) systems and through a separate internet site will facilitate ERT by offering access that meets a variety of business needs and models. In both instances, information that emerged indicates that, in the long-term, adoption rates are positively affected by making participation above a certain minimum threshold mandatory. 4. To assess and compare functions or services that might be offered by or through a vendor, the group heard presentations from vendors that offer products or services that facilitate some aspect of ELT or ERT. 5. To assess the concerns, needs and interest of Iowa motor vehicle dealers, the group surveyed dealers to assess registration and titling difficulties experienced by dealers, the types of DMS systems (if any) used by dealers, and the dealers’ interest and preference in using an electronic interface to submit applications for registration and titling. Overall, 40% of the dealers that responded indicated interest and 57% indicated no interest, but interest was pronounced among new car dealers (75% were interested) and dealers with a high number of monthly transactions (85% of dealers averaging more than 50 sales per month were interested). The majority of dealers responding to the dealer survey ranked delays in processing and problems with daily limits on transaction as ―minor difficulty or ―no difficulty. RECOMMENDATIONS -- At the conclusion of the meetings, the working group discussed possible approaches for implementation of electronic transactions in Iowa and reached a consensus that a phased implementation of electronic titling that addressed first electronic lien and title transactions (ELT) and electronic fund transfers (EFT), and then electronic applications for registration and titling (ERT) is recommended. The recommendation of a phased implementation is based upon recognition that aspects of ELT and EFT are foundational to ERT, and that ELT and EFT solutions are more readily and easily attained than the ERT solution, which will take longer and be somewhat more difficult to develop and will require federal approval of an electronic odometer statement to fully implement. ELT – A multi-vendor approach is proposed for ELT. No direct costs to the state, counties, consumers, or dealers are anticipated under this approach. The vendor charges participating lenders user or transaction fees for the service, and it appears the lenders typically absorb those costs due to the savings offered by ELT. Existing staff can complete the programming necessary to interface the state system with vendors’ systems. The estimated time to implement ELT is six to nine months. Mandatory participation is not recommended initially, but should be considered after ELT has been implemented and a suitable number of vendors have enrolled to provide a fair assessment of participation rates and opportunities. EFT – A previous attempt to implement ELT and EFT was terminated due to concern that it would negatively impact county revenues by reducing interest income earned on state funds collected by the county and held until the monthly transfer to the state. To avoid that problem in this implementation, the EFT solution should remain revenue neutral to the counties, by allowing fees submitted by EFT to be immediately directed to the proper county account. Because ARTS was designed and has the capacity to accommodate EFT, a vendor is not needed to implement EFT. The estimated time to implement EFT is six to nine months. It is expected that EFT development will overlap ELT development. ERT – ERT itself must be developed in phases. It will not be possible to quickly implement a fully functioning, paperless ERT system, because federal law requires that transfer of title be accompanied by a written odometer statement unless approval for an alternate electronic statement is granted by the National Highway Traffic Safety Administration (NHTSA). It is expected that it will take as much as a year or more to obtain NHTSA approval, and that NHTSA approval will require design of a system that requires the seller to electronically confirm the seller’s identity, make the required disclosure to the buyer, and then transfer the disclosure to the buyer, who must also electronically confirm the buyer’s identity and electronically review and accept the disclosure to complete and submit the transaction. Given the time that it will take to develop and gain approval for this solution, initial ERT implementation will focus on completing and submitting applications and issuing registration applied for cards electronically, with the understanding that this process will still require submission of paper documents until an electronic odometer solution is developed. Because continued submission of paper documents undermines the efficiencies sought, ―full‖ ERT – that is, all documents necessary for registration and titling should be capable of approval and/or acceptance by all parties, and should be capable of submission without transmittal or delivery of duplicate paper documents .– should remain the ultimate goal. ERT is not recommended as a means to eliminate review and approval of registration and titling transactions by the county treasurers, or to place registration and titling approval in the hands of the dealers, as county treasurers perform an important role in deterring fraud and promoting accuracy by determining the genuineness and regularity of each application. Authorizing dealers to act as registration agents that approve registration and title applications, issue registration receipts, and maintain and deliver permanent metal license plates is not recommended. Although distribution of permanent plates by dealers is not recommended, it is recommended that dealers participating in ERT generate and print registration applied for cards electronically. Unlike the manually-issued cards currently in use, cards issued in this fashion may be queried by law enforcement and are less susceptible to misuse by customers and dealers. The estimated time to implement the electronic application and registration applied for cards is 12 to 18 months, to begin after ELT and EFT have been implemented. It is recommended that focus during this time be on facilitating transfers through motor vehicle dealers, with initial deployment focused on higher-volume dealers that use DMS systems. In the long term an internet option for access to ERT must also be developed and maintained to allow participation for lower-volume dealers that do not use a DMS system. This option will also lay the ground work for an ERT option for sales between private individuals. Mandatory participation in Iowa is not recommended initially. As with ELT, it is recommended that mandatory participation be considered after at least an initial phase of ERT has been implemented and a suitable number of dealers have enrolled to provide a fair assessment of participation rates and opportunities. The use of vendors to facilitate ERT is not initially proposed because 1) DOT IT support staff is capable of developing a system that will interact with DMS systems and will still have to develop a dealer and public interface regardless of whether a vendor acts as intermediary between the DMS systems, and 2) there is concern that the cost of the vendor-based system, which is funded by transaction-based payments from the dealer to the vendor, will be passed to the consumer in the form of additional documentation or conveyance fees. However, the DOT recommends flexibility on this point, as development and pilot of the system may indicate that a multi-vendor approach similar to that recommended for ELT may increase the adoption rate by larger dealers and may ultimately decrease the user management to be exercised by DOT staff. If vendors are used in the process, additional legislation or administrative rules may be needed to control the fees that may be passed to the consumer. No direct cost to the DOT or county treasurers is expected, as the DOT expects that it may complete necessary programming with existing staff. Use of vendors to facilitate ERT transactions by dealers using DMS systems would result in transaction fees that may ultimately be passed to consumers. LEGISLATION – As a result of the changes implemented in 2004 under Senate File 2070, the only changes to Iowa statutes proposed are to section 321.69 of the Iowa Code, ―Damage disclosure statement,and section 321.71, ―Odometer requirements.‖ In each instance, authority to execute these statements by electronic means would be clarified by authorizing language similar to that used in section 321.20, subsections ―2‖ and ―3,‖ which allows for electronic applications and directs the department to ―adopt rules on the method for providing signatures for applications made by electronic means.‖ In these sections, the authorizing language might read as follows: Notwithstanding contrary provisions of this section, the department may develop and implement a program to allow for any statement required by this section to be made electronically. The department shall adopt rules on the method for providing signatures for statements made by electronic means. Some changes to DOT administrative rules will be useful but only to enable changes to work processes that would be desirable in the long term. Examples of long term work processes that would be enabled by rule changes include allowing for signatures created through electronic means and electronic odometer certifications. The DOT rules, as currently written, do not hinder the ability to proceed with ELT, EFT, and ERT.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Executive Summary I. Survey The Task Force conducted a wide-ranging survey of more than 9,000 licensed Iowa attorneys and judges to obtain their input on a variety of civil justice system topics. The survey results helped inform the Task Force of problem areas in Iowa’s civil justice system. II. Two-Tier Justice System The Task Force recommends a pilot program based on a two-tier civil justice system. A two-tier system would streamline litigation processes—including rules of evidence and discovery disclosures—and reduce litigation costs of certain cases falling below a threshold dollar value. III. One Judge/One Case and Date Certain for Trial Some jurisdictions in Iowa have adopted one judge/one case and date certain for trial in certain cases. The assignment of one judge to each case for the life of the matter and the establishment of dates certain for civil trials could enhance Iowans’ access to the courts, improve judicial management, promote consistency and adherence to deadlines, and reduce discovery excesses. IV. Discovery Processes Reforms addressing inefficient discovery processes will reduce delays in and costs of litigation. Such measures include adopting an aspirational purpose for discovery rules to “secure the just, speedy, and inexpensive determination of every action,” holding discovery proportional to the size and nature of the case, requiring initial disclosures, limiting the number of expert witnesses, and enforcing existing rules. V. Expert Witness Fees The Task Force acknowledges the probable need to revisit the statutory additional daily compensation limit for expert witness fees. Leaving the compensation level to the discretion of the trial court is one potential solution. VI. Jurors Additions to the standard juror questionnaire would provide a better understanding of the potential jurors’ backgrounds and suitability for jury service. The Task Force encourages adoption of more modern juror educational materials and video. Rehabilitation of prospective jurors who express an unwillingness or inability to be fair should include a presumption of dismissal. VII. Video and Teleconferencing Options When court resources are constrained both by limited numbers of personnel and budget cuts, it is logical to look to video and teleconferencing technology to streamline the court process and reduce costs. The judicial branch should embrace technological developments in ways that will not compromise the fairness, dignity, solemnity, and decorum of judicial proceedings. VIII. Court-Annexed Alternative Dispute Resolution(ADR) Litigants and practitioners in Iowa are generally satisfied with the current use of private, voluntary ADR for civil cases. There is concern, however, that maintaining the status quo may have steep future costs. Court-annexed ADR is an important aspect of any justice system reform effort, and the Task Force perceives benefits and detriments to reforming this aspect of the Iowa civil justice system. IX. Relaxed Requirement of Findings of Fact and Conclusions of Law A rule authorizing parties to waive findings of fact and conclusions of law could expedite resolution of nonjury civil cases. X. Business (Specialty) Courts Specialty business courts have achieved widespread support across the country. In addition, specialty courts provide excellent vehicles for implementing or piloting other court innovations that may be useful in a broader court system context. A business specialty court should be and could be piloted in Iowa within the existing court system framework of the Iowa Judicial Branch. Appendix included as a separate document, is 176 pages.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail service, and promoting improved safety both on the rail system and where the rail system interacts with people and other transportation modes. The Iowa DOT has been developing railroad transportation plans since the late 1970s. The original plan was prepared in 1978 during a time of crisis in the Iowa railroad system. Several large Iowa railroad carriers had filed for bankruptcy and were reorganizing both their businesses and physical systems. The 1978 plan was a guide for determining which railroad lines the state would partner with to preserve and improve the lines. In the 1970s, 1980s and 1990s, the railroad system mileage in Iowa was reduced from about

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report was developed to provide summary information to allow state agency staff, practitioners and juvenile justice system officials to access a specific section of Iowa’s Three Year Plan. It includes the Disproportionate Minority Contact (DMC) section of Iowa’s 2006 Juvenile Justice and Delinquency Prevention Act formula grant Three-Year Plan. The complete Three Year Plan serves as Iowa’s application for Juvenile Justice and Delinquency Prevention Act formula grant funding.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

More than 2,200 Iowans each year experience a traumatic brain injury that requires hospitalization. Of those, more than 750 will experience long-term disability as a result. According to a 2000 CDC report, there are an estimated 50,000 such individuals living in Iowa – a number similar to the population of Ames. As part of an enterprise-wide effort to ensure that all Iowans, including those with brain injuries, have access to quality healthcare, Governor Tom Vilsack signed the Brain Injury Services program bill on May 23. The bill will allow the Iowa Department of Public Health (IDPH) to implement a one-of-a-kind program to help those with brain injuries and their families in navigating and maximizing the Iowa community-based service system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report is a culmination of the Location Referencing System (LRS) team. The team was charged with defining a system that coordinates the collection storage, and access to location referencing information by developing an LRS to be used throughout the Iowa DOT.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project looked at the economic benefits and costs associated with alternative strategies for abandoning low volume rural highways and bridges. Three test counties in Iowa were studied, each 100 square miles in size: Hamilton County having a high agricultural tax base and a high percentage of paved roads and few bridges; Shelby County having a relatively low agricultural tax base, hilly terrain and a low percentage of paved road and many bridges; and Linn County having a high agricultural tax base, a high percentage of paved roads and a large number of non-farm households. A questionnaire survey was undertaken to develop estimates of farm and household travel patterns. Benefits and costs associated with the abandonment of various segments of rural highway and bridge mileages in each county were calculated. "Benefits" calculated were reduced future reconstruction and maintenance costs, whereas "costs" were the added cost of travel resulting from the reduced mileage. Some of the findings suggest limited cost savings from abandonment of county roads with no property access in areas with large non-farm rural population; relatively high cost savings from the abandonment of roads with no property access in areas with small rural population; and the largest savings from the conversion of public dead-end gravel roads with property or residence accesses to private drives.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa Department of Transportation exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway. (1990 revision to 1985 policy.)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The goal of this work was to move structural health monitoring (SHM) one step closer to being ready for mainstream use by the Iowa Department of Transportation (DOT) Office of Bridges and Structures. To meet this goal, the objective of this project was to implement a pilot multi-sensor continuous monitoring system on the Iowa Falls Arch Bridge such that autonomous data analysis, storage, and retrieval can be demonstrated. The challenge with this work was to develop the open channels for communication, coordination, and cooperation of various Iowa DOT offices that could make use of the data. In a way, the end product was to be something akin to a control system that would allow for real-time evaluation of the operational condition of a monitored bridge. Development and finalization of general hardware and software components for a bridge SHM system were investigated and completed. This development and finalization was framed around the demonstration installation on the Iowa Falls Arch Bridge. The hardware system focused on using off-the-shelf sensors that could be read in either “fast” or “slow” modes depending on the desired monitoring metric. As hoped, the installed system operated with very few problems. In terms of communications—in part due to the anticipated installation on the I-74 bridge over the Mississippi River—a hardline digital subscriber line (DSL) internet connection and grid power were used. During operation, this system would transmit data to a central server location where the data would be processed and then archived for future retrieval and use. The pilot monitoring system was developed for general performance evaluation purposes (construction, structural, environmental, etc.) such that it could be easily adapted to the Iowa DOT’s bridges and other monitoring needs. The system was developed allowing easy access to near real-time data in a format usable to Iowa DOT engineers.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project was intended to produce a strategy for addressing current and future access management problems on state highway routes located just outside urban areas that serve as major routes for commuting into and out of major employment centers in Iowa. There were two basic goals: (1) to develop a ranking system for identifying high-priority segments for access management treatments on primary highways outside metro and urban areas and (2) to focus efforts on routes that are major commuting routes at present and in the future. The project focused on four-lane expressways and two-lane arterials most likely to serve extensive commuter traffic. Available spatial and statistical data were used to identify existing and possible future problem corridors with respect to access management. The research team developed a scheme for ranking commuter routes based on their need for attention to access management. This project was able to produce rankings for corridors based on a variety of factors, including proportion of crashes that appear to be access-related, severity of those crashes, and potential for improvement along corridors. Frequency and loss were found to be highly rank correlated; because of this, these indicators were not used together in developing final priority rankings. Most of the highest ranked routes are on two-lane rural cross sections, but a few are four-lane expressways with at-grade private driveways and public road intersections. The most important conclusion of the ranking system is that many of the poor-performing corridors are located in a single Iowa Department of Transportation district near two urban areas--Des Moines and Ames. A comprehensive approach to managing access along commuting corridors should be developed first in this district since the potential benefits would be highest in that region.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Behavioral Risk Factor Surveillance System (BRFSS) is an ongoing telephone survey. It is financially and technically supported by the CDC with further financial support from public and private sources. The BRFSS is designed to collect information on the health conditions, health-related behaviors, attitudes, and awareness of residents age 18 and over. It also monitors the prevalence of these indicators over time. The indicators surveyed are major contributors to illness, disability, and premature death. This report focuses on the data collected during calendar year 2013. Some of the health-related issues discussed are general health status, health care access, cancer screening, tobacco use, alcohol consumption, body weight, physical activity, oral health, diabetes, respiratory conditions, immunizations, and HIV/AIDS awareness.