4 resultados para Rainwater absorption and retention

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This supplementary project has been undertaken as an effort to continue work previously completed in the Pooled Fund Study of Premature Concrete Pavement Deterioration. As such, it shares the objective of "Identifying the variables that are present in those pavements exhibiting premature deterioration," by collecting additional data and performing statistical analysis of those data. The approach and philosophy of this work are identical to that followed in the above project, and the Pooled Fund Study Final Report provides a detailed description of this process. This project has involved the collection of data for additional sites in the state of Iowa. These sites have then been added to sites collected in the original study, and statistical analysis has been performed on the entire set. It is hoped that this will have two major effects. First, using data from only one state allows for the analysis of a larger set of independent variables with a greater degree of commonality than was possible in the multi-state study, since the data are not limited by state to state differences in data collection and retention. Second, more data on additional sites will increase the degrees of freedom in the model and hopefully add confidence to the results.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project will include the construction of four separate drainage and retention facilities to handle urban runoff that currently flows directly into Lake Storm Lake. These facilities will filter storm water from approximately 503 acres of urban land including two large industrial users Tyson Fresh Meats and Sara Lee Turkey Processing as well as other commercial and residential sections that currently go directly to the lake without filtration. Specifically the project involves the construction of a two cell dry bottomed detention pond system, construction of two rain gardens/bio retention areas, construction of rain gardens along storm water intakes on Highway 7, and construction of a porous rock detention area. The completed project will provide for cleaner water outleting to the fake in an area that has the largest potential for pollutants to enter the lake. This project is being done in conjunction with other watershed improvements including two additional rain gardens already in place and a multi-year dredging effort of Lake Storm Lake that will be starting its fifth year in 2006. Improvements in the rural water shed are also taking place with the help of a watershed coordinator. Some of these projects include buffer strips and filter slips along the waterways in the watershed.