4 resultados para Railroad tunnels

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Railroad Avenue groundwater contamination site (the site) is in West Des Moines, Polk County, Iowa. Located on approximately 120 acres. The site comprises mixed residential, industrial and commercial properties. Underneath the site, chlorinated volatile organic compounds (VOCs) have contaminatcd the shallow (i.e., 30-50 feet deep) groundwater. These compounds have compromised several shallow wells within the West Des Moines water works system. A contamination source, however, has not yet been identified. In 1993, routine water analysis by the City of West Des Moines identified 1, 2 cis-dichlorocthylcne (1, 2 cis-DCE) at a concentration of 1.2 μg/L (micrograms) per liter of water) in the water supply. Subsequently. several shallow municipal wells were found to be contaminated by VOCs, including 1. 2 cis-DCE, trichloroethylene (TCE), tetrachloroethylene (PCE) and benzene. Five of these wells have been taken out of service. Because of the impact on the West Des Moines water supply, the U.S. Environmental Protection Agency (USEPA) has assigned the site to the National Priorities List. Surface water und sediment at the site have not been impacted by the VOCs. Testing for VOCs in surface soils has not revealed any significant VOC contamination. Subsurface soils -- generally 8 feet or greater in depth -- are contaminated with VOCs, but at levels which should not present a health hazard. The past, present, and future health hazard category chosen for this site is no apparent public health hazard. This category is used when exposure to toxins might be occurring or might have occurrcd in the past, but at levels below any known health hazard. Analysis of available environmental data has not revealed that residental or commercial water customers are or have been exposed to VOCs at concentrations that might cause any adverse health effects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this memorandum is to document the benefit-cost analysis of the river crossing concept alternatives described in the "Concept Alternatives Technical Memo." Benefit-cost studies are designed to measure, in dollars, the potential positive or negative impacts of large-scale construction projects. The concept alternatives analyzed include improvements to the Union Pacific Railroad (UPRR) River Crossing and the U.S. Highway 30 (U.S. 30) River Crossing.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summaries of the data gathered for this project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Use of bridge deck overlays is important in maximizing bridge service life. Overlays can replace the deteriorated part of the deck, thus extending the bridge life. Even though overlay construction avoids the construction of a whole new bridge deck, construction still takes significant time in re-opening the bridge to traffic. Current processes and practices are time-consuming and multiple opportunities may exist to reduce overall construction time by modifying construction requirements and/or materials utilized. Reducing the construction time could have an effect on reducing the socioeconomic costs associated with bridge deck rehabilitation and the inconvenience caused to travelers. This work included three major tasks with literature review, field investigation, and laboratory testing. Overlay concrete mix used for present construction takes long curing hours and therefore an investigation was carried out to find fast-curing concrete mixes that could reduce construction time. Several fast-cuing concrete mixes were found and suggested for further evaluation. An on-going overlay construction project was observed and documented. Through these observations, several opportunities were suggested where small modifications in the process could lead to significant time savings. With current standards of the removal depth of substrate concrete in Iowa, it takes long hours for the removal process. Four different laboratory tests were performed with different loading conditions to determine the necessary substrate concrete removal depth for a proper bond between the substrate concrete and the new overlay concrete. Several parameters, such as failure load, bond stress, and stiffness, were compared for four different concrete removal depths. Through the results and observations of this investigation several conclusions were made which could reduce bridge deck overlay construction time.