10 resultados para REMAINING DOUBLE-BONDS
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
How people choose to live depends on a variety of social and economic circumstances. Single family dwellings, extended family compounds, and communal apartment blocks are all forms of residential architecture that have ancient roots and occur in every culture. Each form both reflects and affects the living styles of the people who reside there. The double house, which shelters two families in units separated by a wall or floor, balances the convenience of an apartment with the psychological comforts of a home. During the mid to late nineteenth and early twentieth centuries in the United States, the double house was hugely popular in some cities, such as Minneapolis and Milwaukee, but only a minimal presence in Des Moines
Resumo:
The Rebuild Iowa Infrastructure Investment Bonds are exactly that: an investment in Iowa and Iowans. Proposed by Governor Chet Culver in his 2009 Condition of the State address, the Rebuild Iowa bonds are an investment of $700 million to create jobs by addressing much-needed infrastructure projects across the state.
Resumo:
Audit report of the Schedule of Debt Service and Coverage for Iowa State University of Science and Technology for the Dormitory Revenue Refunding Bonds for the year ended June 30, 2012
Resumo:
Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. In reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 1) presents the results of Concept 1 - Steel Beam Precast Units. Concept 2 - Modification of the Beam-in-Slab Bridge is presented in Volume 2. Concept 1, involves the fabrication of precast units (two steel beams connected by a concrete slab) by county work forces. Deck thickness is limited so that the units can be fabricated at one site and then transported to the bridge site where they are connected and the remaining portion of the deck placed. Since Concept 1 bridge is primarily intended for use on low-volume roads, the precast units can be constructed with new or used beams. In the experimental part of the investigation, there were three types of static load tests: small scale connector tests, "handling strength" tests, and service and overload tests of a model bridge. Three finite element models for analyzing the bridge in various states of construction were also developed. Small scale connector tests were completed to determine the best method of connecting the precast double-T (PCDT) units. "Handling strength" tests on an individual PCDT unit were performed to determine the strength and behavior of the precast unit in this configuration. The majority of the testing was completed on the model bridge [L=9,750 mm (32 ft), W=6,400 mm (21 ft)] which was fabricated using the precast units developed. Some of the variables investigated in the model bridge tests were number of connectors required to connect adjacent precast units, contribution of diaphragms to load distribution, influence of position of diaphragms on bridge strength and load distribution, and effect of cast-in-place portion of deck on load distribution. In addition to the service load tests, the bridge was also subjected to overload conditions. Using the finite element models developed, one can predict the behavior and strength of bridges similar to the laboratory model as well as design them. Concept 1 has successfully passed all laboratory testing; the next step is to field test it.
Resumo:
Audit report of the financial statements of the governmental activities, the business type activities, the aggregate discretely presented component units, each major fund and the aggregate remaining fund information of the State of Iowa as of and for the year ended June 30, 2014
Resumo:
The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The pmpose of the Watershed Improvement Fund is to enhance the water quality and flood prevention efforts in the state through a variety of impairment-based, locally directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2).
Resumo:
The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enlmnce the water quality and flood prevention efforts in the state through a variety of impairment-based, locally directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest eamed on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.
Resumo:
The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.
Resumo:
The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.
Resumo:
This is the annual appropriations report submitted on behalf of the Watershed Improvement Review Board (WIRB).