9 resultados para Query Refinement
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
The characterization and categorization of coarse aggregates for use in portland cement concrete (PCC) pavements is a highly refined process at the Iowa Department of Transportation. Over the past 10 to 15 years, much effort has been directed at pursuing direct testing schemes to supplement or replace existing physical testing schemes. Direct testing refers to the process of directly measuring the chemical and mineralogical properties of an aggregate and then attempting to correlate those measured properties to historical performance information (i.e., field service record). This is in contrast to indirect measurement techniques, which generally attempt to extrapolate the performance of laboratory test specimens to expected field performance. The purpose of this research project was to investigate and refine the use of direct testing methods, such as X-ray analysis techniques and thermal analysis techniques, to categorize carbonate aggregates for use in portland cement concrete. The results of this study indicated that the general testing methods that are currently used to obtain data for estimating service life tend to be very reliable and have good to excellent repeatability. Several changes in the current techniques were recommended to enhance the long-term reliability of the carbonate database. These changes can be summarized as follows: (a) Limits that are more stringent need to be set on the maximum particle size in the samples subjected to testing. This should help to improve the reliability of all three of the test methods studied during this project. (b) X-ray diffraction testing needs to be refined to incorporate the use of an internal standard. This will help to minimize the influence of sample positioning errors and it will also allow for the calculation of the concentration of the various minerals present in the samples. (c) Thermal analysis data needs to be corrected for moisture content and clay content prior to calculating the carbonate content of the sample.
Resumo:
The Department’s 2007 Greenhouse Gas Inventory is a refinement of previous statewide inventories. It is a bottom-up inventory of two sectors – fossil fuel combustion at federally-recognized major sources of air pollution and fossil fuel combustion and ethanol fermentation at dry mill ethanol plants. This is the first bottomup greenhouse gas inventory conducted for Iowa and the first bottom-up greenhouse gas inventory of ethanol plants in the nation that the Department is aware of. In a bottom-up inventory, facility-specific activity data is used to calculate emissions. In a top-down inventory, aggregate activity data is used to calculate emissions. For example, this bottom-up inventory calculates greenhouse gas emissions from the fossil fuel combustion at each individual facility instead of using the total amount of fossil fuel combusted state-wide, which would be a top-down inventory method. The advantage to a bottom-up inventory is that the calculations are more accurate than a top-down inventory. However, because the two methods differ, the results from a bottom-up inventory are not directly comparable to a top-down inventory.
Resumo:
The most important aspect of property taxation is the concept that all property should be valued for tax purposes on a uniform basis so that the actual property tax burden can be distributed equitably among individual property owners. One of the most widely used and accepted methods of determining relative levels and uniformity of assessments is the assessment/sales ratio study. Such a study, in its most fundamental analysis, is the comparison of the assessed value of an individual property to its sale price. For example, a property assessed at $12,000 which sold for $26,000 would have an assessment/sales ratio of 46% ($12,000 ÷ $26,000). The purpose of this study is to provide assessment/sales ratio information that may be utilized by property tax administrators, local assessing officials, and interested taxpayers in examining the relative levels and uniformity of assessments throughout the State of Iowa. After further refinement, the study is one factor considered by the Director of Revenue in the biennial equalization of assessments.
Resumo:
The most important aspect of property taxation is the concept that all property should be valued for tax purposes on a uniform basis so that the actual property tax burden can be distributed equitably among individual property owners. One of the most widely used and accepted methods of determining relative levels and uniformity of assessments is the assessment/sales ratio study. Such a study, in its most fundamental analysis, is the comparison of the assessed value of an individual property to its sale price. For example, a property assessed at $12,000 which sold for $26,000 would have an assessment/sales ratio of 46% ($12,000 ÷ $26,000). The purpose of this study is to provide assessment/sales ratio information that may be utilized by property tax administrators, local assessing officials, and interested taxpayers in examining the relative levels and uniformity of assessments throughout the State of Iowa. After further refinement, the study is one factor considered by the Director of Revenue in the biennial equalization of assessments.
Resumo:
In the November 2011 report issued by the Governor’s Transportation 2020 Citizen Advisory Commission (CAC), the commission recommended the Iowa Department of Transportation (DOT), at least annually, convene meetings with the cities and counties to review the operation, maintenance and improvement of Iowa’s public roadway system to identify ways to jointly increase efficiency. In response to this recommendation, Gov. Branstad directed the Iowa DOT to begin this effort immediately with a target of identifying $50 million of efficiency savings that can be captured from the $1.2 billion of Road Use Tax Funds (RUTF) provided to the Iowa DOT, cities and counties to administer, maintain and improve the public roadway system. This would build upon past joint and individual actions that have reduced administrative costs and resulted in increased funding for system improvements. Efficiency actions should be quantified, measured and reported to the public on a regular basis. Beyond the discussion of identifying funding solutions to our road and bridge needs, it is critical that all jurisdictions that own, maintain and improve the nation’s road and bridge systems demonstrate to the public these funds are utilized in the most efficient and effective manner. This requires continual innovation in all aspects of transportation planning, design, construction and maintenance - done in a transparent manner to clearly demonstrate to the public how their funds are being utilized. The Iowa DOT has identified 13 efficiency measures separated into two distinct categories – Program Efficiencies and Partnership Efficiencies. The total value of the efficiency measures is $50 million. Many of the efficiency items will need input, refinement and partnership from cities, counties, other local jurisdictions, and stakeholder interest groups. The Iowa DOT has begun meetings with many of these groups to help identify potential efficiency measures and strategies for moving forward. These partnerships and discussions will continue through implementation of the efficiency measures. Dependent on the measures identified, additional action may be required by the legislature, Iowa Transportation Commission, and/or other bodies to implement the action. In addition, a formal process will be developed to quantify, measure and report the results of actions taken on a regular basis.
Resumo:
Often, road construction causes the need to create a work zone. In these scenarios, portable concrete barriers (PCBs) are typically installed to shield workers and equipment from errant vehicles as well as prevent motorists from striking other roadside hazards. For an existing W-beam guardrail system installed adjacent to the roadway and near the work zone, guardrail sections are removed in order to place the portable concrete barrier system. The focus of this research study was to develop a proper stiffness transition between W-beam guardrail and portable concrete barrier systems. This research effort was accomplished through development and refinement of design concepts using computer simulation with LS-DYNA. Several design concepts were simulated, and design metrics were used to evaluate and refine each concept. These concepts were then analyzed and ranked based on feasibility, likelihood of success, and ease of installation. The rankings were presented to the Technical Advisory Committee (TAC) for selection of a preferred design alternative. Next, a Critical Impact Point (CIP) study was conducted, while additional analyses were performed to determine the critical attachment location and a reduced installation length for the portable concrete barriers. Finally, an additional simulation effort was conducted in order to evaluate the safety performance of the transition system under reverse-direction impact scenarios as well as to select the CIP. Recommendations were also provided for conducting a Phase II study and evaluating the nested Midwest Guardrail System (MGS) configuration using three Test Level 3 (TL-3) full-scale crash tests according to the criteria provided in the Manual for Assessing Safety Hardware, as published by the American Association of Safety Highway and Transportation Officials (AASHTO).
Resumo:
Three pavement design software packages were compared with regards to how they were different in determining design input parameters and their influences on the pavement thickness. StreetPave designs the concrete pavement thickness based on the PCA method and the equivalent asphalt pavement thickness. The WinPAS software performs both concrete and asphalt pavements following the AASHTO 1993 design method. The APAI software designs asphalt pavements based on pre-mechanistic/empirical AASHTO methodology. First, the following four critical design input parameters were identified: traffic, subgrade strength, reliability, and design life. The sensitivity analysis of these four design input parameters were performed using three pavement design software packages to identify which input parameters require the most attention during pavement design. Based on the current pavement design procedures and sensitivity analysis results, a prototype pavement design and sensitivity analysis (PD&SA) software package was developed to retrieve the pavement thickness design value for a given condition and allow a user to perform a pavement design sensitivity analysis. The prototype PD&SA software is a computer program that stores pavement design results in database that is designed for the user to input design data from the variety of design programs and query design results for given conditions. The prototype Pavement Design and Sensitivity Analysis (PA&SA) software package was developed to demonstrate the concept of retrieving the pavement design results from the database for a design sensitivity analysis. This final report does not include the prototype software which will be validated and tested during the next phase.
Resumo:
This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.
Resumo:
The major objective of this project is to evaluate image analysis for characterizing air voids in Portland cement contract (PCC) and asphalt concrete (AC) and aggregate gradation in asphalt concrete. Phase 1 of this project has concentrated on evaluation and refinement of sample preparation techniques, evaluation of methods and instruments for conducting image analysis, and finally, analysis and comparison of a select portion of samples. Preliminary results suggest a strong correlation between the results obtained from the linear traverse method and image analysis methods for determining percent air voids in concrete. Preliminary work with asphalt samples has shown that damage caused by a high vacuum of the conventional scanning electron microscope (SEM) may too disruptive. Alternative solutions have been explored, including confocal microscopy and low vacuum electron microscopy. Additionally, a conventional high vacuum SEM operating at a marginal operating vacuum may suffice.