3 resultados para Project method
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
The following report summarizes research activities on the project for the period December 1, 1985 through November 31, 1986. Research efforts for the first year have proceeded basically as outlined in the project proposal.
Resumo:
The following report summarizes research activities on the project for the period December 1, 1986 to November 30, 1987. Research efforts for the second year deviated slightly from those described in the project proposal. By the end of the second year of testing, it was possible to begin evaluating how power plant operating conditions influenced the chemical and physical properties of fly ash obtained from one of the monitored power plants (Ottumwa Generating Station, OGS). Hence, several of the tasks initially assigned to the third year of the project (specifically tasks D, E, and F) were initiated during the second year of the project. Manpower constraints were balanced by delaying full scale implementation of the quantitative X-ray diffraction and differential thermal analysis tasks until the beginning of the third year of the project. Such changes should have little bearing on the outcome of the overall project.
Resumo:
The purpose of the proposed Highway Location Reference Procedure is stated in the contract as follows: "Establishment of a highway network locational reference process that will primarily allow for the proper correlation of pavement management data, and secondarily provide the basis for other existing and future data base integration and for the planned Iowa DOT Geographic Information System. In addition, the locational reference process will be able to correlate network applications with a statewide spatial location method to facilitate the relationship of Iowa DOT data to that of other agencies and to allow for the graphic display of the network in map form." The Design Specifications and Implementation Plan, included in this Final Report, are intended to provide the basis for proceeding with immediate development and implementation of the pavement management system. These specifications will also support the future Iowa DOT implementation of other integrated data bases and/or the planned Geographic Information System.