18 resultados para Project management -- Computer programs -- TFC

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project supported the planning and conduct of a two-day Iowa Department of Transportation–hosted peer exchange for state agencies that have implemented some or all of the suggested strategies outlined in the Second Strategic Highway Research Program–sponsored project R10, Project Management Strategies for Complex Projects. Presentations were made by participating states, and several opportunities were provided for directed discussion. General themes emerging from the presentations and discussions were identified as follows: To implement improvements in project management processes, agency leadership needs to decide that a new approach to project management is worth pursuing and then dedicate resources to developing a project management plan. The change to formalized project management and five-dimensional project management (5DPM) requires a culture shift in agencies from segmented “silo” processes to collaborative, cooperative processes that make communication and collaboration high priorities. Agencies need trained project managers who are empowered to execute the project management plan, as well as properly trained functional staff. Project management can be centralized or decentralized with equal effect. After an agency’s project management plan and structure are developed, software tools and other resources should be implemented to support the plan and structure. All projects will benefit from enhanced project management, but the project management plan should specify appropriate approaches for several project levels as defined by factors in addition to dollar value. Project management should be included in an agency’s project development manual.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to incorporate a greater focus on project management in their project development process. A technical advisory committee (TAC) was assembled to accomplish this effort. The TAC took into consideration the current status of project management with the Iowa DOT, their experience during the demonstration workshop held in Iowa as part of the implementation assistance they received, the project management peer exchange hosted by the Iowa DOT, and additional examples of project management that were presented. With this basis, the TAC participated in a number of discussions to develop draft guidance for the foundation of a Project Management Office (PMO) within the Iowa DOT. The final report describes the process that was used in establishing this guidance. The report details the decisions and decision process that the TAC employed in this endeavor and provides additional thoughts and insight into the draft guidance. Appendix A includes the draft guidance in the form of PMO function details and detailed lists of project management roles and responsibilities. Appendix B includes a starter list of project management resources for the PMO.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of Project ASSIST is to provide computer training to individuals who are blind, visually-impaired or deaf-blind. Our training materials address all levels of users, from beginners to advanced users. We have tutorials, keyboard guides and diagrams, and course packets. These materials can be used by individuals who want to learn popular computer programs on their own and by professional trainers for their organization's computer training program. We also offer instructor-led training through our ASSIST Online distance learning program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Various test methods exist for measuring heat of cement hydration; however, most current methods require expensive equipment, complex testing procedures, and/or extensive time, thus not being suitable for field application. The objectives of this research are to identify, develop, and evaluate a standard test procedure for characterization and quality control of pavement concrete mixtures using a calorimetry technique. This research project has three phases. Phase I was designed to identify the user needs, including performance requirements and precision and bias limits, and to synthesize existing test methods for monitoring the heat of hydration, including device types, configurations, test procedures, measurements, advantages, disadvantages, applications, and accuracy. Phase II was designed to conduct experimental work to evaluate the calorimetry equipment recommended from the Phase I study and to develop a standard test procedure for using the equipment and interpreting the test results. Phase II also includes the development of models and computer programs for prediction of concrete pavement performance based on the characteristics of heat evolution curves. Phase III was designed to study for further development of a much simpler, inexpensive calorimeter for field concrete. In this report, the results from the Phase I study are presented, the plan for the Phase II study is described, and the recommendations for Phase III study are outlined. Phase I has been completed through three major activities: (1) collecting input and advice from the members of the project Technical Working Group (TWG), (2) conducting a literature survey, and (3) performing trials at the CP Tech Center’s research lab. The research results indicate that in addition to predicting maturity/strength, concrete heat evolution test results can also be used for (1) forecasting concrete setting time, (2) specifying curing period, (3) estimating risk of thermal cracking, (4) assessing pavement sawing/finishing time, (5) characterizing cement features, (6) identifying incompatibility of cementitious materials, (7) verifying concrete mix proportions, and (8) selecting materials and/or mix designs for given environmental conditions. Besides concrete materials and mix proportions, the configuration of the calorimeter device, sample size, mixing procedure, and testing environment (temperature) also have significant influences on features of concrete heat evolution process. The research team has found that although various calorimeter tests have been conducted for assorted purposes and the potential uses of calorimeter tests are clear, there is no consensus on how to utilize the heat evolution curves to characterize concrete materials and how to effectively relate the characteristics of heat evolution curves to concrete pavement performance. The goal of the Phase II study is to close these gaps.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Underbody plows can be very useful tools in winter maintenance, especially when compacted snow or hard ice must be removed from the roadway. By the application of significant down-force, and the use of an appropriate cutting edge angle, compacted snow and ice can be removed very effectively by such plows, with much greater efficiency than any other tool under those circumstances. However, the successful operation of an underbody plow requires considerable skill. If too little down pressure is applied to the plow, then it will not cut the ice or compacted snow. However, if too much force is applied, then either the cutting edge may gouge the road surface, causing significant damage often to both the road surface and the plow, or the plow may ride up on the cutting edge so that it is no longer controllable by the operator. Spinning of the truck in such situations is easily accomplished. Further, excessive down force will result in rapid wear of the cutting edge. Given this need for a high level of operator skill, the operation of an underbody plow is a candidate for automation. In order to successfully automate the operation of an underbody plow, a control system must be developed that follows a set of rules that represent appropriate operation of such a plow. These rules have been developed, based upon earlier work in which operational underbody plows were instrumented to determine the loading upon them (both vertical and horizontal) and the angle at which the blade was operating.These rules have been successfully coded into two different computer programs, both using the MatLab® software. In the first program, various load and angle inputs are analyzed to determine when, whether, and how they violate the rules of operation. This program is essentially deterministic in nature. In the second program, the Simulink® package in the MatLab® software system was used to implement these rules using fuzzy logic. Fuzzy logic essentially replaces a fixed and constant rule with one that varies in such a way as to improve operational control. The development of the fuzzy logic in this simulation was achieved simply by using appropriate routines in the computer software, rather than being developed directly. The results of the computer testing and simulation indicate that a fully automated, computer controlled underbody plow is indeed possible. The issue of whether the next steps toward full automation should be taken (and by whom) has also been considered, and the possibility of some sort of joint venture between a Department of Transportation and a vendor has been suggested.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Provides instructions for using the computer program which was developed under the research project, "The Economics of Reducing the County Road System: Three Case Studies In Iowa". This program operates on an IBP personal computer with 300K storage. A fixed disk is required with at least 3 megabytes of storage. The computer must be equipped with DOS version 3.0; the programs are written in Fortran. The user's manual describes all data requirements including network preparation, trip information, cost for maintenance, reconstruction, etc. Program operation instructions are presented, as well as sample solution output and a listing of the computer programs.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This appendix is divided into three sections. The first section contains abstracts of each of the eight computer programs in the system, instructions for keypunching the three input documents, and computer operating instructions pertaining to each program. The second section contains system flowcharts for the entire system as well as program flowcharts for each program. The last section contains PL/l program listings of each program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bridge construction projects are becoming increasingly complex as the demand for context-sensitive solutions, aesthetic designs, and accelerated bridge construction becomes more prevalent. In addition, the Iowa Department of Transportation (Iowa DOT) is entering a phase of design and construction of large border bridges, such as the I-80 (let 2008 for $56 million) and US 34 bridges over the Missouri River and I-74 over the Mississippi River. Compared to typical construction projects, these bridges generate more contractor Requests for Information (RFIs), Value Engineering (VE) proposals, Requests for Changes (RFCs), and shop drawings. Management of these submittals is a significant challenge for Resident Construction Engineers (RCEs) and other Iowa DOT staff. In addition, some submittals require cross-departmental and project consultant reviews. Commercially available software exists for managing submittals and project collaboration teams; in-house solutions may also be possible. Implementation is intended to speed construction submittal review time, reduce incidence of delay claims, and free up Iowa DOT staff from project management administrative tasks. Researchers from Iowa State University working with the Iowa DOT conducted a multi-pronged approach to indentify a web-based collaboration solution for Iowa DOT bridge projects. An investigation was launched to determine the functional needs of the Iowa DOT. Commercially available software programs were also evaluated to find what functionality is currently available. A Request for Proposals (RFP) was written to select a commercial web-based collaboration solution for pilot testing. In the second phase of research, a solution will be selected and implemented on two pilot projects. Lessons learned from these pilot projects will assist the Iowa DOT in developing and implementing a long-term solution to improve the management of Iowa DOT bridge projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report describes the first phase in a project to develop an electronic reference library (ERL) to help Iowa transportation officials efficiently access information in critical and heavily used documents. These documents include Standard Specifications for Bridge and Highway Construction (hereinafter called Standard Specifications), design manuals, standard drawings, the Construction Manual, and Material Instruction Memoranda (hereinafter called Material IMs). Additional items that could be included to enhance the ERL include phone books, letting dates, Internet links, computer programs distributed by the Iowa Department of Transportation (DOT), and local specifications, such as the Urban Standard Specifications of Public Improvements. All cross-references should be hyper linked, and a search engine should be provided. Revisions noted in the General Supplemental Specifications (hereinafter called the Supplemental Specifications) should be incorporated into the text of the Standard Specifications. The Standard Specifications should refer to related sections of other documents, and there should be reciprocal hyper links in those other documents. These features would speed research on critical issues and save staff time. A master plan and a pilot version were both developed in this first phase of the ERL.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Integral abutment bridges are constructed without an expansion joint in the superstructure of the bridge; therefore, the bridge girders, deck, abutment diaphragms, and abutments are monolithically constructed. The abutment piles in an integral abutment bridge are vertically orientated, and they are embedded into the pile cap. When this type of a bridge experiences thermal expansion or contraction, horizontal displacements are induced at the top of the abutment piles. The flexibility of the abutment piles eliminates the need to provide an expansion joint at the inside face to the abutments: Integral abutment bridge construction has been used in Iowa and other states for many years. This research is evaluating the performance of integral abutment bridges by investigating thermally induced displacements, strains, and temperatures in two Iowa bridges. Each bridge has a skewed alignment, contains five prestressed concrete girders that support a 30-ft wide roadway for three spans, and involves a water crossing. The bridges will be monitored for about two years. For each bridge, an instrumentation package includes measurement devices and hardware and software support systems. The measurement devices are displacement transducers, strain gages, and thermocouples. The hardware and software systems include a data-logger; multiplexers; directline telephone service and computer terminal modem; direct-line electrical power; lap-top computer; and an assortment of computer programs for monitoring, transmitting, and management of the data. Instrumentation has been installed on a bridge located in Guthrie County, and similar instrumentation is currently being installed on a bridge located in Story County. Preliminary test results for the bridge located in Guthrie County have revealed that temperature changes of the bridge deck and girders induce both longitudinal and transverse displacements of the abutments and significant flexural strains in the abutment piles. For an average temperature range of 73° F for the superstructure concrete in the bridge located in Guthrie County, the change in the bridge length was about 1 118 in. and the maximum, strong-axis, flexural-strain range for one of the abutment piles was about 400 micro-strains, which corresponds to a stress range of about 11,600 psi.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An update of the following: Status of capital projects from prior year appropriations, appropriation from RIIF, and other other projects, current prison population, expected growth and over population, overview of revised classification system and how it affects bed planning, timeline for construction, 2009 funding, plan for the governor recommended $500,000 for project management and other infrastructure priorities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public agencies in Iowa are continually challenged with reduced staff levels, reduced budgets, and increased expectations for services provided. Responding to these demands requires a well-informed and coordinated team that includes professionals, supervisors, technicians, lead workers, and workers. Becoming a coordinated team requires the training and interaction to produce a common foundation to build upon. In 2007, a training program did not exist in the state to provide this level of training for existing or upcoming managers and leaders of public agencies. The Iowa Local Technical Assistance Program (LTAP), in conjunction with Iowa public agency representatives, set out to provide that foundation by developing the Iowa Public Employees Leadership Academy, which was renamed the Public Employees Leadership Institute in July 2011. The Institute is an on-demand, online training program designed to create better (or new) leaders and supervisors for Iowa’s public agencies. The Institute provides a curriculum to train the next generation of leaders, who will replace existing leaders when retirements occur. Through the Institute, Iowa LTAP will provide a coordinated, structured, non-credit educational program available for a modest fee. The techniques and skills offered through the Institute can apply to all who wish to develop or sharpen their leadership and management abilities. This will be true whether the participants are employed in the public or private sector. The 14 courses that were developed and are being offered are as follows: Supervisory Techniques and Skills, Team Development, Communications Skills, Leadership Skills, Community Service/Customer Orientation, Legal Understanding, Fundamentals of Government, Finance, Resource Management, Operations and Maintenance, Basic Management, Emergency Management, Project Management, and Winter Maintenance Management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Electronic distance measuring instruments (EDMI) are used by surveyors in routine length measurements. The constant and scale factors of the instrument tend to change due to usage, transportation, and aging of crystals. Calibration baselines are established to enable surveyors to check the instruments and determine any changes in the values of constant and scale factors. The National Geodetic Survey (NGS) has developed guidelines for establishing these baselines. In 1981 an EDMI baseline at ISU was established according to NGS guidelines. In October 1982, the NGS measured the distances between monuments. Computer programs for reducing observed distances were developed. Mathematical model and computer programs for determining constant and scale factors were developed. A method was developed to detect any movements of the monuments. Periodic measurements of the baseline were made. No significant movement of the monuments was detected.