9 resultados para Project management - Information technology
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
This project supported the planning and conduct of a two-day Iowa Department of Transportation–hosted peer exchange for state agencies that have implemented some or all of the suggested strategies outlined in the Second Strategic Highway Research Program–sponsored project R10, Project Management Strategies for Complex Projects. Presentations were made by participating states, and several opportunities were provided for directed discussion. General themes emerging from the presentations and discussions were identified as follows: To implement improvements in project management processes, agency leadership needs to decide that a new approach to project management is worth pursuing and then dedicate resources to developing a project management plan. The change to formalized project management and five-dimensional project management (5DPM) requires a culture shift in agencies from segmented “silo” processes to collaborative, cooperative processes that make communication and collaboration high priorities. Agencies need trained project managers who are empowered to execute the project management plan, as well as properly trained functional staff. Project management can be centralized or decentralized with equal effect. After an agency’s project management plan and structure are developed, software tools and other resources should be implemented to support the plan and structure. All projects will benefit from enhanced project management, but the project management plan should specify appropriate approaches for several project levels as defined by factors in addition to dollar value. Project management should be included in an agency’s project development manual.
Resumo:
This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to incorporate a greater focus on project management in their project development process. A technical advisory committee (TAC) was assembled to accomplish this effort. The TAC took into consideration the current status of project management with the Iowa DOT, their experience during the demonstration workshop held in Iowa as part of the implementation assistance they received, the project management peer exchange hosted by the Iowa DOT, and additional examples of project management that were presented. With this basis, the TAC participated in a number of discussions to develop draft guidance for the foundation of a Project Management Office (PMO) within the Iowa DOT. The final report describes the process that was used in establishing this guidance. The report details the decisions and decision process that the TAC employed in this endeavor and provides additional thoughts and insight into the draft guidance. Appendix A includes the draft guidance in the form of PMO function details and detailed lists of project management roles and responsibilities. Appendix B includes a starter list of project management resources for the PMO.
Resumo:
In August, 1994, the Office of Local Systems, Project Development Division, Iowa Department of Transportation established a Quality Improvement Team to review and improve upon the federal-aid project development process. The mission was to communicate federal-aid project development procedures to local agencies, beginning with the approval of the Statewide Transportation Improvement Program (STIP) and ending with obligation of federal funds by the Federal Highway Administration (FHWA). In January 1997, another Team (Make it Better) began meeting to clarify, update, and streamline the federal-aid project process. This Project Development Packet is a compilation of these efforts. The packet includes Project Development timelines, flow charts, guidelines, design criteria, Instructional Memorandums and forms to assist in the federal-aid project development process. The main (fold out) flow chart directs to other sections of the packet when appropriate.
Resumo:
This document briefly summarizes the pavement management activities under the existing Iowa Department of Transportation (DOT) Pavement Management System. The second part of the document provides projected increase in use due to the implementation of the Iowa DOT Pavement Management Optimization System. All estimates of existing time devoted to the Pavement Management System and project increases in time requirements are estimates made by the appropriate Iowa DOT office director or function manager. Included is the new Pavement Management Optimization Structure for the three main offices which will work most closely with the Pavement Management Optimization System (Materials, Design, and Program Management).
Resumo:
The missions of the research are to assist the Iowa Department of Transortation (Iowa DOT) to: Define pavement management (PM) optimization; Identify the characteristics of PM optimization systems being developed or implemented; Identify specific and achievable objectives for the Iowa DOT pavement management optimization; Evaluate different PM optimization methodologies; Identify a methodology to perform PM optimization that best satisfies the Iowa DOT's objectives; Develop a plan for the implementation of the PM optimization selected. The project is divided into three (3) phases. The first phase has been completed and accomplished the first three missions (identified above). The second phase has been completed and accomplished the next two missions. Phase three will accomplish the last mission.
Resumo:
The State of Iowa is conducting an as5essment of Information Technology (IT) in the Executive Branch. The purpose of this assessment is to gather data on costs, applications, systems, utilization, operations, hardware assets, administration and activities associated with the provision of IT services. To accomplish this, two leading technology vendors conducted an intense assessment. These vendors, Integrated System Solutions Corporation (ISSC), and Electronic Data Systems (EDS) analyzed extensive data provided by the various ·agencies and conducted on-site interviews during the week of November 13, 1995. Additionally, in the first week of December, the American Federation of State, County, and Municipal Employees (AFSCME) Iowa Council 61 sponsored an assessment. These assessments are included as appendices B, C, and D to this report.
Resumo:
Purpose of Records Management Sysytem indexing standards document is to develop indexing standards that will best support Iowa DOT's effort to build an agency-wide Records Management System
Resumo:
Advances in communication, navigation and imaging technologies are expected to fundamentally change methods currently used to collect data. Electronic data interchange strategies will also minimize data handling and automatically update files at the point of capture. This report summarizes the outcome of using a multi-camera platform as a method to collect roadway inventory data. It defines basic system requirements as expressed by users, who applied these techniques and examines how the application of the technology met those needs. A sign inventory case study was used to determine the advantages of creating and maintaining the database and provides the capability to monitor performance criteria for a Safety Management System. The project identified at least 75 percent of the data elements needed for a sign inventory can be gathered by viewing a high resolution image.
Resumo:
The purpose of the proposed Highway Location Reference Procedure is stated in the contract as follows: "Establishment of a highway network locational reference process that will primarily allow for the proper correlation of pavement management data, and secondarily provide the basis for other existing and future data base integration and for the planned Iowa DOT Geographic Information System. In addition, the locational reference process will be able to correlate network applications with a statewide spatial location method to facilitate the relationship of Iowa DOT data to that of other agencies and to allow for the graphic display of the network in map form." The Design Specifications and Implementation Plan, included in this Final Report, are intended to provide the basis for proceeding with immediate development and implementation of the pavement management system. These specifications will also support the future Iowa DOT implementation of other integrated data bases and/or the planned Geographic Information System.