39 resultados para Program Design

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document was prepared by the Iowa Department of Transportation to inform Iowans of planned investments in the state's transportation system over the next five years.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 USC. The STIP is generated to provide the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s (Iowa DOT) authority to act concerning matters related to transportation, federal-aid expenditures and approvals of Metropolitan Planning Organizations’ (MPOs) Transportation Improvements Programs (TIPs) have been provided in past STIP’s and can be provided again upon request. The projects identified within the 2010-2013 STIP are divided into two groups. Projects proposed for funding from FHWA programs are shown first. FTA programs follow. Maps are included that identify locations of Iowa DOT District Planners, Metropolitan Planning Organizations (MPOs), Regional Planning affiliations (RPAs), and transit systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document serves as a reference guide to local planning agencies for the development of their regional Transportation Improvement Program (TIP) and the Statewide Transportation Improvement Program (STIP).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A previous study sponsored by the Smart Work Zone Deployment Initiative, “Feasibility of Visualization and Simulation Applications to Improve Work Zone Safety and Mobility,” demonstrated the feasibility of combining readily available, inexpensive software programs, such as SketchUp and Google Earth, with standard two-dimensional civil engineering design programs, such as MicroStation, to create animations of construction work zones. The animations reflect changes in work zone configurations as the project progresses, representing an opportunity to visually present complex information to drivers, construction workers, agency personnel, and the general public. The purpose of this study is to continue the work from the previous study to determine the added value and resource demands created by including more complex data, specifically traffic volume, movement, and vehicle type. This report describes the changes that were made to the simulation, including incorporating additional data and converting the simulation from a desktop application to a web application.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a multiyear federal transportation authorization bill in place. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended nine times because a new authorization has not yet been enacted. The current extension will expire June 30, 2012.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The National Concrete Pavement Technology Center, Iowa Department of Transportation, and Federal Highway Administration set out to demonstrate and document the design and construction of portland cement concrete (PCC) overlays on two-lane roadways while maintaining two-way traffic. An 18.82 mile project was selected for 2011 construction in northeast Iowa on US 18 between Fredericksburg and West Union. This report documents planning, design, and construction of the project and lessons learned. The work included the addition of subdrains, full-depth patching, bridge approach replacement, and drainage structural repair and cleaning prior to overlay construction. The paving involved surface preparation by milling to grade and the placement of a 4.5 inch PCC overlay and 4 foot of widening to the existing pavement. In addition, the report makes recommendations on ways to improve the process for future concrete overlays.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a multiyear federal transportation authorization bill in place and having a sustainable and solvent federal Highway Trust Fund. The most recent federal authorization, Moving Ahead for Progress in the 21st Century (MAP-21), will expire September 30, 2014. At the same time that MAP-21 expires and absent Congressional action, the federal Highway Trust Fund will no longer be able provide funding at current levels resulting in up to a 90 percent reduction in federal highway funding for federal fiscal year 2015. These two issues provide funding uncertainty with this program in fiscal years 2015 and beyond.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Abstract: As a part of an innovation project funded by the Federal Highway Administration (FHWA) Highways for LIFE program, a full-depth precast, ultra-high-performance concrete (UHPC) waffle deck panel and appropriate connections suitable for field implementation of waffle decks were developed. Following a successful full-scale validation test on a unit consisting of two panels with various types of connections under laboratory conditions, the waffle deck was installed successfully on a replacement bridge in Wapello County, Iowa. The subsequent load testing confirmed the desirable performance of the UHPC waffle deck bridge. Using the lessons from the completed project and outcomes from a series of simple and detailed finite element analyses of waffle decks, this report was developed to serve as a guide for broadening the design and installation of the UHPC waffle deck panel in new and existing bridges. Following an introduction to UHPC and waffle deck panels and a summary of completed work, this document presents information on waffle deck design, design of connections, redecking using waffle deck panels, and guidance on precast fabrication, construction, and installation of UHPC waffle deck panels.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this study was to investigate the effect of cement paste quality on the concrete performance, particularly fresh properties, by changing the water-to-cementitious materials ratio (w/cm), type and dosage of supplementary cementitious materials (SCM), and airvoid system in binary and ternary mixtures. In this experimental program, a total matrix of 54 mixtures with w/cm of 0.40 and 0.45; target air content of 2%, 4%, and 8%; a fixed cementitious content of 600 pounds per cubic yard (pcy), and the incorporation of three types of SCMs at different dosages was prepared. The fine aggregate-to- total aggregate ratio was fixed at 0.42. Workability, rheology, air-void system, setting time, strength, Wenner Probe surface resistivity, and shrinkage were determined. The effects of paste variables on workability are more marked at the higher w/cm. The compressive strength is strongly influenced by the paste quality, dominated by w/cm and air content. Surface resistivity is improved by inclusion of Class F fly ash and slag cement, especially at later ages. Ternary mixtures performed in accordance with their ingredients. The data collected will be used to develop models that will be part of an innovative mix proportioning procedure.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The resilient modulus (MR) input parameters in the Mechanistic-Empirical Pavement Design Guide (MEPDG) program have a significant effect on the projected pavement performance. The MEPDG program uses three different levels of inputs depending on the desired level of accuracy. The primary objective of this research was to develop a laboratory testing program utilizing the Iowa DOT servo-hydraulic machine system for evaluating typical Iowa unbound materials and to establish a database of input values for MEPDG analysis. This was achieved by carrying out a detailed laboratory testing program designed in accordance with the AASHTO T307 resilient modulus test protocol using common Iowa unbound materials. The program included laboratory tests to characterize basic physical properties of the unbound materials, specimen preparation and repeated load triaxial tests to determine the resilient modulus. The MEPDG resilient modulus input parameter library for Iowa typical unbound pavement materials was established from the repeated load triaxial MR test results. This library includes the non-linear, stress-dependent resilient modulus model coefficients values for level 1 analysis, the unbound material properties values correlated to resilient modulus for level 2 analysis, and the typical resilient modulus values for level 3 analysis. The resilient modulus input parameters library can be utilized when designing low volume roads in the absence of any basic soil testing. Based on the results of this study, the use of level 2 analysis for MEPDG resilient modulus input is recommended since the repeated load triaxial test for level 1 analysis is complicated, time consuming, expensive, and requires sophisticated equipment and skilled operators.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.