8 resultados para Process Control

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

70.00% 70.00%

Publicador:

Resumo:

A specification for contractor moisture quality control (QC) in roadway embankment construction has been in use for approximately 10 years in Iowa on about 190 projects. The use of this QC specification and the development of the soils certification program for the Iowa Department of Transportation (DOT) originated from Iowa Highway Research Board (IHRB) embankment quality research projects. Since this research, the Iowa DOT has applied compaction with moisture control on most embankment work under pavements. This study set out to independently evaluate the actual quality of compaction using the current specifications. Results show that Proctor tests conducted by Iowa State University (ISU) using representative material obtained from each test section where field testing was conducted had optimum moisture contents and maximum dry densities that are different from what was selected by the Iowa DOT for QC/quality assurance (QA) testing. Comparisons between the measured and selected values showed a standard error of 2.9 lb/ft3 for maximum dry density and 2.1% for optimum moisture content. The difference in optimum moisture content was as high as 4% and the difference in maximum dry density was as high as 6.5 lb/ft3 . The difference at most test locations, however, were within the allowable variation suggested in AASHTO T 99 for test results between different laboratories. The ISU testing results showed higher rates of data outside of the target limits specified based on the available contractor QC data for cohesive materials. Also, during construction observations, wet fill materials were often observed. Several test points indicated that materials were placed and accepted at wet of the target moisture contents. The statistical analysis results indicate that the results obtained from this study showed improvements over results from previous embankment quality research projects (TR-401 Phases I through III and TR-492) in terms of the percentage of data that fell within the specification limits. Although there was evidence of improvement, QC/QA results are not consistently meeting the target limits/values. Recommendations are provided in this report for Iowa DOT consideration with three proposed options for improvements to the current specifications. Option 1 provides enhancements to current specifications in terms of material-dependent control limits, training, sampling, and process control. Option 2 addresses development of alternative specifications that incorporate dynamic cone penetrometer or light weight deflectometer testing into QC/QA. Option 3 addresses incorporating calibrated intelligent compaction measurements into QC/QA.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Quality management concrete allows the contractor to develop the mix design for the portland cement concrete. This research was initiated to gain knowledge about contractor mix designs. An experiment was done to determine the variation in cylinders, beams, and cores that could be used to test the strength of the contractor's mix. In addition, the contractor's cylinder strengths and gradations were analyzed for statistical stability and process capability. This research supports the following conclusions: (1) The mold type used to cast the concrete cylinders had an effect on the compressive strength of the concrete. The 4.5-in. by 9-in. (11.43-cm by 22.86-cm) cylinders had lower strength at a 95% confidence interval than the 4-in. by 8-in. (10.16-cm by 20.32-cm) and 6-in. by 12-in. (15.24-cm by 30.48-cm) cylinders. (2) The low vibration consolidation effort had the lowest strength of the three consolidation efforts. In particular, an interaction occurred between the low vibration effort and the 4.5-in. by 9-in. (11.43-cm by 22.86-cm) mold. This interaction produced very low compressive strengths when compared with the other consolidation efforts. (3) A correlation of 0.64 R-squared was found between the 28 day cylinder and 28 day compressive strengths. (4) The compressive strength results of the process control testing were not in statistical control. The aggregate gradations were mostly in statistical control. The gradation process was capable of meeting specification requirements. However, many of the sieves were off target. (5) The fineness modulus of the aggregate gradations did not correlate well with the strength of the concrete. However, this is not surprising considering that the gradation tests and the strength tests did not represent the same material. In addition, the concrete still has many other variables that will affect its strength that were not controlled.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Stylized facts regarding the industrial process include emphases on obtaining information about and control over the quality of raw materials. We provide a model that establishes conditions under which informed control involves ensuring uniformity in inputs and increased uniformity encourages more extensive processing. We show when the Boltzmann-Shannon entropy statistic is an appropriate measure of uniformity.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Iowa's Drug Control Strategy serves as a comprehensive blueprint for coordinated prevention, treatment, and enforcement actions to protect citizens from the dangers posed by substance abuse. This holistic plan, developed by Iowa's Drug Policy Advisory Council, embraces a performance-oriented process to align resources with long-term goals, and supports three desired results: All Iowans are healthy and drug-free, Iowa communities are free from illegal drugs, all Iowans are safe from drug abusing offenders. This report also contains a mix of recent accomplishments and pending challenges.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction of portland cement concrete pavements is a complex process. A small fraction of the concrete pavements constructed in the United States over the last few decades have either failed prematurely or exhibited moderate to severe distress. In an effort to prevent future premature failures, 17 state transportation agencies pooled their resources, and a pooled fund research project, Material and Construction Optimization for Prevention of Premature Pavement Distress in PCC Pavements, was undertaken in 2003. Its purpose was to evaluate existing quality control tests, and then select and advance the state-of-the-practice of those tests most useful for optimizing concrete pavements during mix design, mix verification, and construction. This testing guide is one product of that project. The guide provides three recommended testing schemes (Levels A, B, and C, depending on a pavement’s design life and traffic volumes, etc.) that balance the costs of testing with the risk of failure for various project types. The recommended tests are all part of a comprehensive suite of tests described in detail in this guide.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In July of 2009, the Division of Criminal and Juvenile Justice Planning (CJJP) received Byrne Justice Assistance Grant/American Recovery and Reinvestment Act funding from the Governor’s Office of Drug Control Policy to conduct a process and outcome evaluation of the STAR (Sisters Together Achieving Recovery) program housed at the Iowa Correctional Institution for Women (ICIW) in Mitchellville, Iowa. The STAR Program is a licensed inpatient substance abuse treatment program that utilizes a Therapeutic Community model (TC). All offenders exiting the STAR program between October 1, 2004 and June 30, 2008 were included in the study (n=173). A comparison sample was drawn of offenders exiting the ICIW during the same release time frame with identified but untreated substance abuse needs (n= 173). March 31, 2010 was designated as the cut-off date for the study. This yielded an average post-program follow-up time of 3.1 years. The STAR group was further divided into two groups by time of program exit. Participants exiting the program between October 1, 2004 and June 30, 2006 were designated as STAR 1 (n=78) and those exiting the program between July 1, 2006 and June 30, 2008 were designated as STAR 2 (n=95). In order to have comparable tracking time between STAR groups, tracking time for STAR 1 concluded July 31, 2008. This yielded an average post release follow-up time of 2.4 years for both groups. Demographic, Program, Intervention, and Outcome data were examined. Comparisons were made between groups as well as categories of participation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report discusses the asphalt pavement recycling project designated Project HR-188 in Kossuth County, Iowa. Specific objectives were: (a) to determine the effectiveness of drum mixing plant modifications designed to control air pollution within limits specified by the Iowa Department of Environmental Quality; (b) to assess the impact of varying the proportions of recycled and virgin aggregates, (c) to assess the impact of varying the production rate of the plant, and (d) to assess the impact of varying the mixing temperature. The discussion includes information on the proposed use of research funds, project location and description, the project planning conference, plan development, bid letting, asphalt plant configuration, actual plant operation, why this method is successful, probable process limitations, pollution results, recycled pavement test results, and the cost of virgin vs. recycled asphalt pavements.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) mandated utilizing the Load and Resistance Factor Design (LRFD) approach for all new bridges initiated in the United States after October 1, 2007. As a result, there has been a progressive move among state Departments of Transportation (DOTs) toward an increased use of the LRFD in geotechnical design practices. For the above reasons, the Iowa Highway Research Board (IHRB) sponsored three research projects: TR-573, TR-583 and TR-584. The research information is summarized in the project web site (http://srg.cce.iastate.edu/lrfd/). Two reports of total four volumes have been published. Report volume I by Roling et al. (2010) described the development of a user-friendly and electronic database (PILOT). Report volume II by Ng et al. (2011) summarized the 10 full-scale field tests conducted throughout Iowa and data analyses. This report presents the development of regionally calibrated LRFD resistance factors for bridge pile foundations in Iowa based on reliability theory, focusing on the strength limit states and incorporating the construction control aspects and soil setup into the design process. The calibration framework was selected to follow the guidelines provided by the American Association of State Highway and Transportation Officials (AASHTO), taking into consideration the current local practices. The resistance factors were developed for general and in-house static analysis methods used for the design of pile foundations as well as for dynamic analysis methods and dynamic formulas used for construction control. The following notable benefits to the bridge foundation design were attained in this project: 1) comprehensive design tables and charts were developed to facilitate the implementation of the LRFD approach, ensuring uniform reliability and consistency in the design and construction processes of bridge pile foundations; 2) the results showed a substantial gain in the factored capacity compared to the 2008 AASHTO-LRFD recommendations; and 3) contribution to the existing knowledge, thereby advancing the foundation design and construction practices in Iowa and the nation.