In this paper we examine some of the economic forces that underlie economic growth at the county level. In an effort to describe a much more comprehensive regional economic growth model, we address a variety of different growth hypotheses by introducing a large number of growth related variables. When formulating our hypotheses and specifying our growth model we make liberal use of GIS (geographical information systems) mapping software to “paint” a picture of where growth spots exist. Our empirical estimation indicates that amenities, state and local tax burdens, population, amount of primary agriculture activity, and demographics have important impacts on economic growth.
Resumo:
A linear programming model is used to optimally assign highway segments to highway maintenance garages using existing facilities. The model is also used to determine possible operational savings or losses associated with four alternatives for expanding, closing and/or relocating some of the garages in a study area. The study area contains 16 highway maintenance garages and 139 highway segments. The study recommends alternative No. 3 (close Tama and Blairstown garages and relocate new garage at Jct. U.S. 30 and Iowa 21) at an annual operational savings of approximately $16,250. These operational savings, however, are only the guidelines for decisionmakers and are subject to the required assumptions of the model used and limitations of the study.
Resumo:
Construction of the interstate highway system began in 1956. This U.S. network of highway consists of more than 41,000 miles with 790 miles in Iowa. There have been many benefits of the controlled access roadway, but probably the most significant is the improved safety for the motorist. In Iowa, we have always endeavored to utilize quality locally available materials in our construction using the most economical or cost effective methods. Obviously when the effort is to build a cost effective system, there will be some portions of the network that will not perform as well as expected. In the design of our interstate, the main consideration for base construction under the pavement was structural capacity. The material was dense graded with the aim of supporting the pavement and distributing the load as it is transferred to the underlying grade. The drainage characteristic of the base was apparently not given adequate consideration. On jointed portland cement concrete (pcc) pavement, the water that is trapped immediately beneath the pavement causes severe problems. The traffic causes rapid movement of the water resulting in the hydraulic pressures or "pumping" (movement and redeposit of base fine material) resulting in faulting between individual slabs. Recognizing the need for maintaining this large national highway network, the Federal Highway Administration has initiated a funding program for resurfacing, restoration and rehabilitation (3R). Many miles of the system are more than 20 years old and in need of major maintenance. This new 3R Program necessitated a complete inventory of the Iowa interstate system to establish priorities and to identify those sections in need of immediate remedial treatments.
Resumo:
The Center for Transportation Research and Education (CTRE) used the traffic simulation model CORSIM to access proposed capacity and safety improvement strategies for the U.S. 61 corridor through Burlington, Iowa. The comparison between the base and alternative models allow for evaluation of the traffic flow performance under the existing conditions as well as other design scenarios. The models also provide visualization of performance for interpretation by technical staff, public policy makers, and the public. The objectives of this project are to evaluate the use of traffic simulation models for future use by the Iowa Department of Transportation (DOT) and to develop procedures for employing simulation modeling to conduct the analysis of alternative designs. This report presents both the findings of the U.S. 61 evaluation and an overview of model development procedures. The first part of the report includes the simulation modeling development procedures. The simulation analysis is illustrated through the Burlington U.S. 61 corridor case study application. Part I is not intended to be a user manual but simply introductory guidelines for traffic simulation modeling. Part II of the report evaluates the proposed improvement concepts in a side by side comparison of the base and alternative models.