5 resultados para Port of entry

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pursuant to House File 451 the Single Point of Entry Long-Term Living Resources System Team, involving several state agencies as well as interested associations, submitted a report to the legislature on recommendations to establish a single point of entry system.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

We analyze the entry of a new product into a vertically differentiated market in which an entrant and an incumbent compete in prices. Here the entry-deterrence strategies of the incumbent firm rely on “limit qualities.” With a sequential choice of quality, a quality-dependent marginal production cost, and a fixed entry cost, we relate the entry-quality decision and the entry-deterrence strategies to the level of entry cost and the degree of consumer heterogeneity. Quality-dependent marginal production costs in the model entail the possibility of inferior-quality entry as well as an incumbent’s aggressive entry-deterrence strategies of increasing its quality level toward potential entry. Welfare evaluation confirms that social welfare is not necessarily improved when entry is encouraged rather than deterred.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Epoxy coatings have been used on the embedded reinforcing bars of bridge decks since the mid-1970s to mitigate deterioration caused by chloride-induced corrosion. The use of chloride-based deicers became common in the early 1960s and caused corrosion of conventional uncoated bars in bridge decks within 5 to 10 years of commencement of deicer applications. In response to this rapid deterioration, the National Bureau of Standards researched coatings to protect the reinforcement (National Bureau of Standards, 1975), resulting in the development of epoxy-coated reinforcing bars, which were used in bridge decks beginning in 1973. While corrosion-related deterioration has been prevalent on bridge decks with uncoated reinforcing bars in northern climates where the use of deicing salts is common, bridge decks constructed after 1973 with epoxy-coated reinforcing have shown good corrosion resistance with only limited exceptions. On the whole, previous laboratory and field studies regarding the performance of epoxy-coated reinforcing bars are very promising; however, some laboratory and field studies have yielded differing results. In recent years, maintenance personnel for the Iowa Department of Transportation (Iowa DOT) have reportedly performed patch repairs to some bridge decks reinforced with epoxy-coated bars. At one such bridge, the southbound US 65 bridge (Bridge No. 7788.5L065) over the Union Pacific Railroad near Bondurant in Polk County, Iowa, deck repairs were performed by Iowa DOT maintenance personnel in the Spring of 2010, based on our communications regarding this topic with Mr. Gordon Port of the Iowa DOT. These repairs were observed by engineers from the Iowa DOT Office of Bridges and Structures, who reported that significant corrosion was found at a number of epoxy-coated reinforcing bars uncovered during this patch work. These repairs were reportedly performed at spalls and delaminated areas corresponding to cracks over transverse reinforcing bars, and involved careful removal of the concrete from over the bars. Figures 1 through 4 contain photographs provided by Iowa DOT personnel showing the removal process (Figure 1), the conditions encountered (Figures 2 and 3), and close-up views of the corroded reinforcing (Figure 4). As a result of these observations, the Iowa Department of Transportation has requested this study to gain further understanding of the long-term performance of bridge decks reinforced with epoxy-coated bars. The two main objectives of this study are to determine the long-term effectiveness of the epoxy coatings and to determine the potential causes for the deterioration at locations where corrosion has occurred. Wiss, Janney, Elstner Associates, Inc. (WJE) and the Iowa DOT identified eight different bridge decks across Iowa for this study that were constructed using epoxy-coated reinforcing bars. A field investigation consisting of visual inspections, a delamination survey, a concrete cover survey, electrical testing for susceptibility to corrosion, and concrete sampling was conducted within a survey area deemed to be representative of the condition of each bridge deck. Laboratory testing, including chloride ion content testing, characterization of the extracted bars, petrographic examination of the concrete, and carbonation testing, was conducted on the core samples taken from each bridge deck.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Iowa Department of Corrections (DOC) and the Department of Human Rights, Division of Criminal and Juvenile Justice Planning (CJJP) entered into a contract for services from January 2, 2007 to June 30, 2008 for the purposes of assisting in the evaluation component for the two-year Prison Re-Entry Initiative (PRI) grand awarded to the DOC by the U.S. Office of Justice Programs. The PRI grant period ran from July 2006 through June 2008 and included two primary components. First, all PRI participants returning to Polk County would participate in a Lifeskills curriculum offered through the Des Moines Area Community College (DMACC) at four Iowa prison institutions located at Mitchellville, Newton, Fort Dodge and Rockwell City. Second, all PRI participants returning to Polk County would be referred to The Directors Council (TDC) for cmmunity-based wrap-around services.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Iowa Department of Corrections (DOC) and the Department of Human Rights, Division of Criminal and Juvenile Justice Planning (CJJP) entered into a contract for services from September 12, 2007 to June 30, 2009 for the purposes of assisting in the evaluation component for the two-year Iowa Prisoner Re-Entry Initiative (PRI) Rural Service Delivery Model. This contract was extended to November 2009. The Rural PRI grant period ran from July 1, 2007 to June 30, 2009 and was extended to November 30, 2009. The purpose of the program was to improve community safety by providing pre-release services and successful transition planning and aftercare services to offenders released from state institutions to the Second Judicial District Department of Correctional Services. Participants included all offenders released to the Second Judicial District during the grant period.