22 resultados para Planning Support Systems
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Winter maintenance, particularly snow removal and the stress of snow removal materials on public structures, is an enormous budgetary burden on municipalities and nongovernmental maintenance organizations in cold climates. Lately, geospatial technologies such as remote sensing, geographic information systems (GIS), and decision support tools are roviding a valuable tool for planning snow removal operations. A few researchers recently used geospatial technologies to develop winter maintenance tools. However, most of these winter maintenance tools, while having the potential to address some of these information needs, are not typically placed in the hands of planners and other interested stakeholders. Most tools are not constructed with a nontechnical user in mind and lack an easyto-use, easily understood interface. A major goal of this project was to implement a web-based Winter Maintenance Decision Support System (WMDSS) that enhances the capacity of stakeholders (city/county planners, resource managers, transportation personnel, citizens, and policy makers) to evaluate different procedures for managing snow removal assets optimally. This was accomplished by integrating geospatial analytical techniques (GIS and remote sensing), the existing snow removal asset management system, and webbased spatial decision support systems. The web-based system was implemented using the ESRI ArcIMS ActiveX Connector and related web technologies, such as Active Server Pages, JavaScript, HTML, and XML. The expert knowledge on snow removal procedures is gathered and integrated into the system in the form of encoded business rules using Visual Rule Studio. The system developed not only manages the resources but also provides expert advice to assist complex decision making, such as routing, optimal resource allocation, and monitoring live weather information. This system was developed in collaboration with Black Hawk County, IA, the city of Columbia, MO, and the Iowa Department of transportation. This product was also demonstrated for these agencies to improve the usability and applicability of the system.
Resumo:
Crashworthy, work-zone, portable sign support systems accepted under NCHRP Report No. 350 were analyzed to predict their safety peformance according to the TL-3 MASH evaluation criteria. An analysis was conducted to determine which hardware parameters of sign support systems would likely contribute to the safety performance with MASH. The acuracy of the method was evaluated through full-scale crash testing. Four full-scale crash tests were conducted with a pickup truck. Two tall-mounted, sign support systems with aluminum sign panels failed the MASH criteria due to windshield penetration. One low-mounted system with a vinyl, roll-up sign panel failed the MASH criteria due to windshield and floorboard penetration. Another low-mounted system with an aluminum sign panel successfully met the MASH criteria. Four full-scale crash tests were conducted with a small passenger car. The low-mounted tripod system with an aluminum sign panel failed the MASH criteria due to windshield penetration. One low-mounted system with aluminum sign panel failed the MASH criteria due to excessive windshield deformation, and another similar system passed the MASH criteria. The low-mounted system with a vinyl, roll-up sign panel successfully met the MASH criteria. Hardware parameters of work-zone sign support systems that were determined to be important for failure with MASH include sign panel material, the height to the top of the mast, the presence of flags, sign-locking mechanism, base layout and system orientation. Flowcharts were provided to assist manufacturers when designing new sign support systems.
Resumo:
Integral abutment bridges are constructed without an expansion joint in the superstructure of the bridge; therefore, the bridge girders, deck, abutment diaphragms, and abutments are monolithically constructed. The abutment piles in an integral abutment bridge are vertically orientated, and they are embedded into the pile cap. When this type of a bridge experiences thermal expansion or contraction, horizontal displacements are induced at the top of the abutment piles. The flexibility of the abutment piles eliminates the need to provide an expansion joint at the inside face to the abutments: Integral abutment bridge construction has been used in Iowa and other states for many years. This research is evaluating the performance of integral abutment bridges by investigating thermally induced displacements, strains, and temperatures in two Iowa bridges. Each bridge has a skewed alignment, contains five prestressed concrete girders that support a 30-ft wide roadway for three spans, and involves a water crossing. The bridges will be monitored for about two years. For each bridge, an instrumentation package includes measurement devices and hardware and software support systems. The measurement devices are displacement transducers, strain gages, and thermocouples. The hardware and software systems include a data-logger; multiplexers; directline telephone service and computer terminal modem; direct-line electrical power; lap-top computer; and an assortment of computer programs for monitoring, transmitting, and management of the data. Instrumentation has been installed on a bridge located in Guthrie County, and similar instrumentation is currently being installed on a bridge located in Story County. Preliminary test results for the bridge located in Guthrie County have revealed that temperature changes of the bridge deck and girders induce both longitudinal and transverse displacements of the abutments and significant flexural strains in the abutment piles. For an average temperature range of 73° F for the superstructure concrete in the bridge located in Guthrie County, the change in the bridge length was about 1 118 in. and the maximum, strong-axis, flexural-strain range for one of the abutment piles was about 400 micro-strains, which corresponds to a stress range of about 11,600 psi.
Resumo:
Iowa’s Rail Environment Iowa’s rail transportation system provides both freight and passenger service. Rail serves a variety of trips, including those within Iowa and those to other states as well as to foreign markets. While rail competes with other modes, it also cooperates with those modes to provide intermodal services to Iowans. In 2009 Iowa’s rail transportation system could be described as follows: Freight Iowa’s 130,000-mile freight transportation system includes an extensive railroad network, a well-developed highway system, two bordering navigable waterways, and a pipeline network as well as air cargo facilities. While rail accounts for only 3 percent of the freight network, it carries 43 percent of Iowa’s freight tonnage. A great variety of commodities ranging from fresh fish to textiles to optical products are moved by rail. However, most of the Iowa rail shipments consist of bulk commodities, including grain, grain products, coal, ethanol, and fertilizers. The railroad network performs an important role in moving bulk commodities produced and consumed in the state to local processors, livestock feeders, river terminals and ports for foreign export. The railroad’s ability to haul large volumes, long distances at low costs will continue to be a major factor in moving freight and improving the economy of Iowa. Key 2008 Facts • 3,945 miles of track • 18 railroads • 49.5 million tons shipped • 39.7 million tons received • 2 Amtrak routes • 6 Amtrak stations • 66,286 rail passenger rides Key Rail Trends • slightly fewer miles being operated; • railroads serving Iowa has remained the same; • more rail freight traffic; • more tons hauled per car; • higher average rail rates per ton-mile since 2002; • more car and tons hauled per locomotive; and • more ton miles per gallon of fuel consumed. Iowa’s rail system and service has been evolving over time relative to its size, financial conditions, and competition from other modes.
Resumo:
This is the final report of the of IowAccess Project 8, which designed and implemented a geospatial data infrastructure for Iowa, including a formalized coordination body, a coordination staff, and enhanced data clearing house, and a statewide GIS training and education effort.
Resumo:
The objective of this research was to develop a methodology for transforming and dynamically segmenting data. Dynamic segmentation enables transportation system attributes and associated data to be stored in separate tables and merged when a specific query requires a particular set of data to be considered. A major benefit of dynamic segmentation is that individual tables can be more easily updated when attributes, performance characteristics, or usage patterns change over time. Applications of a progressive geographic database referencing system in transportation planning are vast. Summaries of system condition and performance can be made, and analyses of specific portions of a road system are facilitated.
Resumo:
Iowa Code Section 216A.135 requires the Criminal and Juvenile Justice Planning Advisory Council (CJJPAC) to submit a long-range plan for Iowa's justice system to the Governor and General Assembly every five years. The first plan developed after the creation of the Division of Criminal and Juvenile Justice Planning was issued in 1990 and annually updated through 1994. Since 1992, appropriation law has required the CJJPAC to coordinate their planning activities with those of the Iowa Juvenile Justice Advisory Council (JJAC).
Resumo:
The attached plan builds upon work done over the last decade. The first plan developed after the creation of the Division of Criminal and Juvenile Justice Planning in 1986 was issued in 1990 and annually updated through 1994. Since 1992, the CJJPAC has been required to coordinate their planning activities with those of the Iowa Juvenile Justice Advisory Council (JJAC). In 1995, these two councils developed a new plan consisting of a set of long-range justice system goals to assist policy makers and justice system practitioners as they plan and operate the justice system through the next twenty years. The statutory mandate for such long-range planning required the identification of goals specific enough to provide guidance, but broad enough to be of relevance over a long period of time. The long-range goals adopted by these councils in 1995 covered a wide variety of topics and offered a framework within which current practices could be defined and assessed. Collectively, these long-range goals were meant to provide a single source of direction to the complex assortment of practitioners and policymakers whose individual concerns and decisions collectively define the nature and effectiveness of Iowa’s justice system. The twenty-year goals established in 1995 were reviewed by the councils in 2000 to assess their current relevance. It was determined that, with a few revisions, the goals established in 1995 should be restated in 2000 with a renewed emphasis on their long-range status. This plan builds upon those issued in 1995 and 2000, continuing much of the emphasis of plans, with some new directions charted as appropriate.
Resumo:
According to 23 CFR § 450.214(a), “The State shall develop a long-range statewide transportation plan, with a minimum 20-year forecast period at the time of adoption, that provides for the development and implementation of the multimodal transportation system for the State.” The state transportation plan (Plan) is a document that will address this requirement and serve as a transportation investment guide between now and 2040. Iowa’s most recent plan was developed by the Iowa Department of Transportation and adopted in 1997 through a planning process called Iowa in Motion. Much of Iowa in Motion has been implemented and this Plan, "Iowa in Motion – Planning Ahead," will build on the success of its predecessor. The Plan projects the demand for transportation infrastructure and services to 2040 based on consideration of social and economic changes likely to occur during this time. Iowa’s economy and the need to meet the challenges of the future will continue to place pressure on the transportation system. With this in mind, the Plan will provide direction for each transportation mode, and will support a renewed emphasis on efficient investment and prudent, responsible management of our existing transportation system. In recent years, the Iowa DOT has branded this philosophy as stewardship. As Iowa changes and the transportation system evolves, one constant will be that the safe and efficient movement of Iowans and our products is essential for stable growth in Iowa’s economy. Iowa’s extensive multimodal and multijurisdictional transportation system is a critical component of economic development and job creation throughout the state.
Resumo:
Iowa Code Section 216A.135 requires the Criminal and Juvenile Justice Planning Advisory Council (CJJPAC) to submit a long-range plan for Iowa's justice system to the Governor and General Assembly every five years. The Criminal and Juvenile Justice Advisory Council directed that the 2005 plan be developed with input from the public. A public hearing was held in September 2004, utilizing the Iowa Communications Network at five sites across Iowa. Using the information gained, the Council developed new goals and strategies and modified others from the 2000 plan. The 2005 Long Range Goals for Iowa’s Criminal and Juvenile Justice Systems, organized as follows, are meant to facilitate analyses and directions for justice system issues and concerns in Iowa.
Resumo:
As technology evolves, vital resources shift, and the state’s population diversifies, Public Safety will have a unique opportunity to show our integrity, values, and worth to the citizens of Iowa. To take advantage of this unique moment in history, and will remain committed to, proactive and on-going strategic mapping. This strategic work will always be guided by Public Safety’s mission and core values, as well as by our responsibility to support local Police Departments and Sheriff’s Offices.
Resumo:
Iowa Code Section 216A.135 requires the Criminal and Juvenile Justice Planning Advisory Council (CJJPAC) to submit a long-range plan for Iowa's justice system to the Governor and General Assembly every five years. The Criminal and Juvenile Justice Advisory Council directed that the 2005 plan be developed with input from the public. A public hearing was held in September 2004, utilizing the Iowa Communications Network at 5 sites across Iowa. Using the information gained, the Council developed new goals and strategies and modified others from the 2000 plan. The 2005 Long Range Goals for Iowa’s Criminal and Juvenile Justice Systems, organized as follows, are meant to facilitate analyses and directions for justice system issues and concerns in Iowa.
Resumo:
The Benkelman Beam structural test of flexible pavements was replaced in 1976 by dynamic deflection testing with a model 400 Road Rater. The Road Rater is used to determine structural ratings of flexible pavements. New pavement construction in Iowa has decreased with a corresponding increase of restoration and rehabilitation. A method to determine structural ratings of layered systems and rigid pavements is needed to properly design overlay thickness. The objective of this research was to evaluate the feasibility of using the Road Rater to determine support values of layered systems and rigid pavements. This evaluation was accomplished by correlating the Road Rater with the Federal Highway Administration (FHWA) Thumper, a dynamic deflection testing device. Data were obtained with the Road Rater and Thumper at 411 individual test locations on 39 different structural sections ranging from 10" of PCC pavement and 25" of asphalt pavement to a newly graveled unpaved roadway. A high correlation between a 9000 pound Thumper deflection and the 1185 pound Road Rater deflection was obtained. A Road Rater modification has been completed to provide 2000 pound load inputs. The basin, defined by four sensors spaced at 1 foot intervals, resulting from the 2000 pound loading is being used to develop a graph for determining relative subgrade strengths. Road Rater deflections on rigid pavements are sufficient to support the potential for this technique.
Resumo:
HR-394 was a software and database development project. Via funding provided by the Iowa Highway Research Board, the Iowa County Engineer's Association Service Bureau oversaw the planning and implementation of an Internet based application that supports two major local-government transportation project activities: Project programming and Development tracking. The goals were to reduce errors and inconsistencies, speed up the processes, link people to both project data and each other, and build a framework that could eventually support a 'paperless' work flow. The work started in 1999 and initial development was completed by the fall of 2002. Since going live, several 'piggy back' applications have been required to make the Programming side better fit actual work procedures. This part of the system has proven adequate but will be rewritten in 2004 to make it easier to use. The original development side module was rejected by the users and so had to be rewritten in 2003. The second version has proven much better, is heavily used, and is interconnected with Iowa DOT project data systems. Now that the system is in operation, it will be maintained and operated by the ICEA Service Bureau as an ongoing service function.
Resumo:
The report describes the state of the art video equipment used and experiences gained from the 6,800 mile field test. The first objective of this project was to determine if laser disc equipment could capture and store usable roadway images while operating in a mobile environment. The second objective was to evaluate methods of using optical disc storage and retrieval features to enhance highway planning and design function. Several highway departments have attempted to use video technology to replace the traditional 16 and 35 mm film format used in photologging. These attempts have met with limited success because of the distortion caused by video technology not being capable of dealing with highway speeds. The distortion has caused many highway signs to be unreadable and, therefore, clients have labeled the technology unusable. Two methods of using optical laser disc storage and retrieval have been successfully demonstrated by Wisconsin and Connecticut Departments of Transportation. Each method provides instantaneous retrieval and linking of images with other information. However, both methods gather the images using 35 mm film techniques. The 35 mm film image is then transferred to laser disc. Eliminating the film conversion to laser disc has potential for saving $4 to $5 per logging mile. In addition to a cost savings, the image would be available immediately as opposed to delays caused by film developing and transferring to laser disc. In June and November of 1986 Iowa DOT staff and cooperating equipment suppliers demonstrated the concept of direct image capture. The results from these tests were promising and an FHWA Demonstration program established. Since 1986 technology advancements have been incorporated into the design that further improve the image quality originally demonstrated.