This report is formatted to independently present four individual investigations related to similar web gap fatigue problems. Multiple steel girder bridges commonly exhibit fatigue cracking due to out-of-plane displacement of the web near the diaphragm connections. This fatigue-prone web gap area is typically located in negative moment regions of the girders where the diaphragm stiffener is not attached to the top flange. In the past, the Iowa Department of Transportation has attempted to stop fatigue crack propagation in these steel girder bridges by drilling holes at the crack tips. Other nondestructive retrofits have been tried; in a particular case on a two-girder bridge with floor beams, angles were bolted between the stiffener and top flange. The bolted angle retrofit has failed in the past and may not be a viable solution for diaphragm bridges. The drilled hole retrofit is often only a temporary solution, so a more permanent and effective retrofit is required. A new field retrofit has been developed that involves loosening the bolts in the connection between the diaphragm and the girders. Research on the retrofit has been initiated; however, no long-term studies of the effects of bolt loosening have been performed. The intent of this research is to study the short-term effects of the bolt loosening retrofit on I-beam and channel diaphragm bridges. The research also addressed the development of a continuous remote monitoring system to investigate the bolt loosening retrofit on an X-type diaphragm bridge over a number of months, ensuring that the measured strain and displacement reductions are not affected by time and continuous traffic loading on the bridge. The testing for the first three investigations is based on instrumentation of web gaps in a negative moment region on Iowa Department of Transportation bridges with I-beam, channel, and X-type diaphragms. One bridge of each type was instrumented with strain gages and deflection transducers. Field tests, using loaded trucks of known weight and configuration, were conducted on the bridges with the bolts in the tight condition and after implementing the bolt loosening retrofit to measure the effects of loosening the diaphragm bolts. Long-term data were also collected on the X-diaphragm bridge by a data acquisition system that collected the data continuously under ambient truck loading. The collected data were retrievable by an off-site modem connection to the remote data acquisition system. The data collection features and ruggedness of this system for remote bridge monitoring make it viable as a pilot system for future monitoring projects in Iowa. Results indicate that loosening the diaphragm bolts reduces strain and out-of-plane displacement in the web gap, and that the reduction is not affected over time by traffic or environmental loading on the bridge. Reducing the strain in the web gap allows the bridge to support more cycles of loading before experiencing fatigue, thus increase the service life of the bridge. Two-girder floor beam bridges may also exhibit fatigue cracking in girder webs.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A network of 25 sonic stage sensors were deployed in the Squaw Creek basin upstream from Ames Iowa to determine if the state-of-the-art distributed hydrological model CUENCAS can produce reliable information for all road crossings including those that cross small creeks draining basins as small as 1 sq. mile. A hydraulic model was implemented for the major tributaries of the Squaw Creek where IFC sonic instruments were deployed and it was coupled to CUENCAS to validate the predictions made at small tributaries in the basin. This study demonstrates that the predictions made by the hydrological model at internal locations in the basins are as accurate as the predictions made at the outlet of the basin. Final rating curves based on surveyed cross sections were developed for the 22 IFC-bridge sites that are currently operating, and routine forecast is provided at those locations (see IFIS). Rating curves were developed for 60 additional bridge locations in the basin, however, we do not use those rating curves for routine forecast because the lack of accuracy of LiDAR derived cross sections is not optimal. The results of our work form the basis for two papers that have been submitted for publication to the Journal of Hydrological Engineering. Peer review of our work will gives a strong footing to our ability to expand our results from the pilot Squaw Creek basin to all basins in Iowa.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The goal of this work was to move structural health monitoring (SHM) one step closer to being ready for mainstream use by the Iowa Department of Transportation (DOT) Office of Bridges and Structures. To meet this goal, the objective of this project was to implement a pilot multi-sensor continuous monitoring system on the Iowa Falls Arch Bridge such that autonomous data analysis, storage, and retrieval can be demonstrated. The challenge with this work was to develop the open channels for communication, coordination, and cooperation of various Iowa DOT offices that could make use of the data. In a way, the end product was to be something akin to a control system that would allow for real-time evaluation of the operational condition of a monitored bridge. Development and finalization of general hardware and software components for a bridge SHM system were investigated and completed. This development and finalization was framed around the demonstration installation on the Iowa Falls Arch Bridge. The hardware system focused on using off-the-shelf sensors that could be read in either “fast” or “slow” modes depending on the desired monitoring metric. As hoped, the installed system operated with very few problems. In terms of communications—in part due to the anticipated installation on the I-74 bridge over the Mississippi River—a hardline digital subscriber line (DSL) internet connection and grid power were used. During operation, this system would transmit data to a central server location where the data would be processed and then archived for future retrieval and use. The pilot monitoring system was developed for general performance evaluation purposes (construction, structural, environmental, etc.) such that it could be easily adapted to the Iowa DOT’s bridges and other monitoring needs. The system was developed allowing easy access to near real-time data in a format usable to Iowa DOT engineers.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Iowa Department of Transportation began preparation for the acquisition of an electronic document management system in 1996. The first phase was development of a strategic plan. The plan provided guidelines for defining the acquisition and implementation of a document management system to automate document handling and distribution. Phase 2 involved developing draft standards (document, indexing and technology) for planning and implementation of a document management system. These standards were to identify existing industry standards and determine which standards would best support the specific requirements of the Iowa Department of Transportation. During development of these standards, the decision was made to enlarge the scope of this effort from a document management system to a records management system (RMS). Phase .3 identified business processes that were to be further developed as pilot projects of a much larger agency-wide records management system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

LEGISLATIVE STUDY – The 83rd General Assembly of the Iowa Legislature, in Senate File 2273, directed the Iowa Department of Transportation (DOT) to conduct a study of how to implement a uniform statewide system to allow for electronic transactions for the registration and titling of motor vehicles. PARTICIPANTS IN STUDY – As directed by Senate File 2273, the DOT formed a working group to conduct the study that included representatives from the Consumer Protection Division of the Office of the Attorney General, the Department of Public Safety, the Department of Revenue, the Iowa State County Treasurer’s Association, the Iowa Automobile Dealers Association, and the Iowa Independent Automobile Dealers Association. CONDUCT OF THE STUDY – The working group met eight times between June 17, 2010, and October 1, 2010. The group discussed the costs and benefits of electronic titling from the perspectives of new and used motor vehicle dealers, county treasurers, the DOT, lending institutions, consumers and consumer protection, and law enforcement. Security concerns, legislative implications, and implementation timelines were also considered. In the course of the meetings the group: 1. Reviewed the specific goals of S.F. 2273, and viewed a demonstration of Iowa’s current vehicle registration and titling system so participants that were not users of the system could gain an understanding of its current functionality and capabilities. 2. Reviewed the results of a survey of county treasurers conducted by the DOT to determine the extent to which county treasurers had processing backlogs and the extent to which county treasurers limited the number of dealer registration and titling transactions that they would process in a single day and while the dealer waited. Only eight reported placing a limit on the number of dealer transactions that would be processed while the dealer waited (with the number ranging from one to four), and only 11 reported a backlog in processing registration and titling transactions as of June 11, 2010, with most backlogs being reported in the range of one to three days. 3. Conducted conference calls with representatives of the American Association of Motor Vehicle Administrators (AAMVA) and representatives of three states -- Kansas, which has an electronic lien and titling (ELT) program, and Wisconsin and Florida, each of which have both an ELT program and an electronic registration and titling (ERT) program – to assess current and best practices for electronic transactions. In addition, the DOT (through AAMVA) submitted a survey to all U.S. jurisdictions to determine how, if at all, other states implemented electronic transactions for the registration and titling of motor vehicles. Twenty-eight states responded to the survey; of the 28 states that responded, only 13 allowed liens to be added or released electronically, and only five indicated allowing applications for registration and titling to be submitted electronically. DOT staff also heard a presentation from South Dakota on its ERT system at an AAMVA regional meeting. ELT information that emerged suggests a multi-vendor approach, in which vendors that meet state specifications for participation are authorized to interface with the state’s system to serve as a portal between lenders and the state system, will facilitate electronic lien releases and additions by offering lenders more choices and the opportunity to use the same vendor in multiple states. The ERT information that emerged indicates a multi-interface approach that offers an interface with existing dealer management software (DMS) systems and through a separate internet site will facilitate ERT by offering access that meets a variety of business needs and models. In both instances, information that emerged indicates that, in the long-term, adoption rates are positively affected by making participation above a certain minimum threshold mandatory. 4. To assess and compare functions or services that might be offered by or through a vendor, the group heard presentations from vendors that offer products or services that facilitate some aspect of ELT or ERT. 5. To assess the concerns, needs and interest of Iowa motor vehicle dealers, the group surveyed dealers to assess registration and titling difficulties experienced by dealers, the types of DMS systems (if any) used by dealers, and the dealers’ interest and preference in using an electronic interface to submit applications for registration and titling. Overall, 40% of the dealers that responded indicated interest and 57% indicated no interest, but interest was pronounced among new car dealers (75% were interested) and dealers with a high number of monthly transactions (85% of dealers averaging more than 50 sales per month were interested). The majority of dealers responding to the dealer survey ranked delays in processing and problems with daily limits on transaction as ―minor difficulty or ―no difficulty. RECOMMENDATIONS -- At the conclusion of the meetings, the working group discussed possible approaches for implementation of electronic transactions in Iowa and reached a consensus that a phased implementation of electronic titling that addressed first electronic lien and title transactions (ELT) and electronic fund transfers (EFT), and then electronic applications for registration and titling (ERT) is recommended. The recommendation of a phased implementation is based upon recognition that aspects of ELT and EFT are foundational to ERT, and that ELT and EFT solutions are more readily and easily attained than the ERT solution, which will take longer and be somewhat more difficult to develop and will require federal approval of an electronic odometer statement to fully implement. ELT – A multi-vendor approach is proposed for ELT. No direct costs to the state, counties, consumers, or dealers are anticipated under this approach. The vendor charges participating lenders user or transaction fees for the service, and it appears the lenders typically absorb those costs due to the savings offered by ELT. Existing staff can complete the programming necessary to interface the state system with vendors’ systems. The estimated time to implement ELT is six to nine months. Mandatory participation is not recommended initially, but should be considered after ELT has been implemented and a suitable number of vendors have enrolled to provide a fair assessment of participation rates and opportunities. EFT – A previous attempt to implement ELT and EFT was terminated due to concern that it would negatively impact county revenues by reducing interest income earned on state funds collected by the county and held until the monthly transfer to the state. To avoid that problem in this implementation, the EFT solution should remain revenue neutral to the counties, by allowing fees submitted by EFT to be immediately directed to the proper county account. Because ARTS was designed and has the capacity to accommodate EFT, a vendor is not needed to implement EFT. The estimated time to implement EFT is six to nine months. It is expected that EFT development will overlap ELT development. ERT – ERT itself must be developed in phases. It will not be possible to quickly implement a fully functioning, paperless ERT system, because federal law requires that transfer of title be accompanied by a written odometer statement unless approval for an alternate electronic statement is granted by the National Highway Traffic Safety Administration (NHTSA). It is expected that it will take as much as a year or more to obtain NHTSA approval, and that NHTSA approval will require design of a system that requires the seller to electronically confirm the seller’s identity, make the required disclosure to the buyer, and then transfer the disclosure to the buyer, who must also electronically confirm the buyer’s identity and electronically review and accept the disclosure to complete and submit the transaction. Given the time that it will take to develop and gain approval for this solution, initial ERT implementation will focus on completing and submitting applications and issuing registration applied for cards electronically, with the understanding that this process will still require submission of paper documents until an electronic odometer solution is developed. Because continued submission of paper documents undermines the efficiencies sought, ―full‖ ERT – that is, all documents necessary for registration and titling should be capable of approval and/or acceptance by all parties, and should be capable of submission without transmittal or delivery of duplicate paper documents .– should remain the ultimate goal. ERT is not recommended as a means to eliminate review and approval of registration and titling transactions by the county treasurers, or to place registration and titling approval in the hands of the dealers, as county treasurers perform an important role in deterring fraud and promoting accuracy by determining the genuineness and regularity of each application. Authorizing dealers to act as registration agents that approve registration and title applications, issue registration receipts, and maintain and deliver permanent metal license plates is not recommended. Although distribution of permanent plates by dealers is not recommended, it is recommended that dealers participating in ERT generate and print registration applied for cards electronically. Unlike the manually-issued cards currently in use, cards issued in this fashion may be queried by law enforcement and are less susceptible to misuse by customers and dealers. The estimated time to implement the electronic application and registration applied for cards is 12 to 18 months, to begin after ELT and EFT have been implemented. It is recommended that focus during this time be on facilitating transfers through motor vehicle dealers, with initial deployment focused on higher-volume dealers that use DMS systems. In the long term an internet option for access to ERT must also be developed and maintained to allow participation for lower-volume dealers that do not use a DMS system. This option will also lay the ground work for an ERT option for sales between private individuals. Mandatory participation in Iowa is not recommended initially. As with ELT, it is recommended that mandatory participation be considered after at least an initial phase of ERT has been implemented and a suitable number of dealers have enrolled to provide a fair assessment of participation rates and opportunities. The use of vendors to facilitate ERT is not initially proposed because 1) DOT IT support staff is capable of developing a system that will interact with DMS systems and will still have to develop a dealer and public interface regardless of whether a vendor acts as intermediary between the DMS systems, and 2) there is concern that the cost of the vendor-based system, which is funded by transaction-based payments from the dealer to the vendor, will be passed to the consumer in the form of additional documentation or conveyance fees. However, the DOT recommends flexibility on this point, as development and pilot of the system may indicate that a multi-vendor approach similar to that recommended for ELT may increase the adoption rate by larger dealers and may ultimately decrease the user management to be exercised by DOT staff. If vendors are used in the process, additional legislation or administrative rules may be needed to control the fees that may be passed to the consumer. No direct cost to the DOT or county treasurers is expected, as the DOT expects that it may complete necessary programming with existing staff. Use of vendors to facilitate ERT transactions by dealers using DMS systems would result in transaction fees that may ultimately be passed to consumers. LEGISLATION – As a result of the changes implemented in 2004 under Senate File 2070, the only changes to Iowa statutes proposed are to section 321.69 of the Iowa Code, ―Damage disclosure statement,and section 321.71, ―Odometer requirements.‖ In each instance, authority to execute these statements by electronic means would be clarified by authorizing language similar to that used in section 321.20, subsections ―2‖ and ―3,‖ which allows for electronic applications and directs the department to ―adopt rules on the method for providing signatures for applications made by electronic means.‖ In these sections, the authorizing language might read as follows: Notwithstanding contrary provisions of this section, the department may develop and implement a program to allow for any statement required by this section to be made electronically. The department shall adopt rules on the method for providing signatures for statements made by electronic means. Some changes to DOT administrative rules will be useful but only to enable changes to work processes that would be desirable in the long term. Examples of long term work processes that would be enabled by rule changes include allowing for signatures created through electronic means and electronic odometer certifications. The DOT rules, as currently written, do not hinder the ability to proceed with ELT, EFT, and ERT.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Executive Summary I. Survey The Task Force conducted a wide-ranging survey of more than 9,000 licensed Iowa attorneys and judges to obtain their input on a variety of civil justice system topics. The survey results helped inform the Task Force of problem areas in Iowa’s civil justice system. II. Two-Tier Justice System The Task Force recommends a pilot program based on a two-tier civil justice system. A two-tier system would streamline litigation processes—including rules of evidence and discovery disclosures—and reduce litigation costs of certain cases falling below a threshold dollar value. III. One Judge/One Case and Date Certain for Trial Some jurisdictions in Iowa have adopted one judge/one case and date certain for trial in certain cases. The assignment of one judge to each case for the life of the matter and the establishment of dates certain for civil trials could enhance Iowans’ access to the courts, improve judicial management, promote consistency and adherence to deadlines, and reduce discovery excesses. IV. Discovery Processes Reforms addressing inefficient discovery processes will reduce delays in and costs of litigation. Such measures include adopting an aspirational purpose for discovery rules to “secure the just, speedy, and inexpensive determination of every action,” holding discovery proportional to the size and nature of the case, requiring initial disclosures, limiting the number of expert witnesses, and enforcing existing rules. V. Expert Witness Fees The Task Force acknowledges the probable need to revisit the statutory additional daily compensation limit for expert witness fees. Leaving the compensation level to the discretion of the trial court is one potential solution. VI. Jurors Additions to the standard juror questionnaire would provide a better understanding of the potential jurors’ backgrounds and suitability for jury service. The Task Force encourages adoption of more modern juror educational materials and video. Rehabilitation of prospective jurors who express an unwillingness or inability to be fair should include a presumption of dismissal. VII. Video and Teleconferencing Options When court resources are constrained both by limited numbers of personnel and budget cuts, it is logical to look to video and teleconferencing technology to streamline the court process and reduce costs. The judicial branch should embrace technological developments in ways that will not compromise the fairness, dignity, solemnity, and decorum of judicial proceedings. VIII. Court-Annexed Alternative Dispute Resolution(ADR) Litigants and practitioners in Iowa are generally satisfied with the current use of private, voluntary ADR for civil cases. There is concern, however, that maintaining the status quo may have steep future costs. Court-annexed ADR is an important aspect of any justice system reform effort, and the Task Force perceives benefits and detriments to reforming this aspect of the Iowa civil justice system. IX. Relaxed Requirement of Findings of Fact and Conclusions of Law A rule authorizing parties to waive findings of fact and conclusions of law could expedite resolution of nonjury civil cases. X. Business (Specialty) Courts Specialty business courts have achieved widespread support across the country. In addition, specialty courts provide excellent vehicles for implementing or piloting other court innovations that may be useful in a broader court system context. A business specialty court should be and could be piloted in Iowa within the existing court system framework of the Iowa Judicial Branch. Appendix included as a separate document, is 176 pages.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Department of Transportation (DOT) is responsible for approximately 4,100 bridges and structures that are a part of the state’s primary highway system, which includes the Interstate, US, and Iowa highway routes. A pilot study was conducted for six bridges in two Iowa river basins—the Cedar River Basin and the South Skunk River Basin—to develop a methodology to evaluate their vulnerability to climate change and extreme weather. The six bridges had been either closed or severely stressed by record streamflow within the past seven years. An innovative methodology was developed to generate streamflow scenarios given climate change projections. The methodology selected appropriate rainfall projection data to feed into a streamflow model that generated continuous peak annual streamflow series for 1960 through 2100, which were used as input to PeakFQ to estimate return intervals for floods. The methodology evaluated the plausibility of rainfall projections and credibility of streamflow simulation while remaining consistent with U.S. Geological Survey (USGS) protocol for estimating the return interval for floods. The results were conveyed in an innovative graph that combined historical and scenario-based design metrics for use in bridge vulnerability analysis and engineering design. The pilot results determined the annual peak streamflow response to climate change likely will be basin-size dependent, four of the six pilot study bridges would be exposed to increased frequency of extreme streamflow and would have higher frequency of overtopping, the proposed design for replacing the Interstate 35 bridges over the South Skunk River south of Ames, Iowa is resilient to climate change, and some Iowa DOT bridge design policies could be reviewed to consider incorporating climate change information.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

For well over 100 years, the Working Stress Design (WSD) approach has been the traditional basis for geotechnical design with regard to settlements or failure conditions. However, considerable effort has been put forth over the past couple of decades in relation to the adoption of the Load and Resistance Factor Design (LRFD) approach into geotechnical design. With the goal of producing engineered designs with consistent levels of reliability, the Federal Highway Administration (FHWA) issued a policy memorandum on June 28, 2000, requiring all new bridges initiated after October 1, 2007, to be designed according to the LRFD approach. Likewise, regionally calibrated LRFD resistance factors were permitted by the American Association of State Highway and Transportation Officials (AASHTO) to improve the economy of bridge foundation elements. Thus, projects TR-573, TR-583 and TR-584 were undertaken by a research team at Iowa State University’s Bridge Engineering Center with the goal of developing resistance factors for pile design using available pile static load test data. To accomplish this goal, the available data were first analyzed for reliability and then placed in a newly designed relational database management system termed PIle LOad Tests (PILOT), to which this first volume of the final report for project TR-573 is dedicated. PILOT is an amalgamated, electronic source of information consisting of both static and dynamic data for pile load tests conducted in the State of Iowa. The database, which includes historical data on pile load tests dating back to 1966, is intended for use in the establishment of LRFD resistance factors for design and construction control of driven pile foundations in Iowa. Although a considerable amount of geotechnical and pile load test data is available in literature as well as in various State Department of Transportation files, PILOT is one of the first regional databases to be exclusively used in the development of LRFD resistance factors for the design and construction control of driven pile foundations. Currently providing an electronically organized assimilation of geotechnical and pile load test data for 274 piles of various types (e.g., steel H-shaped, timber, pipe, Monotube, and concrete), PILOT (http://srg.cce.iastate.edu/lrfd/) is on par with such familiar national databases used in the calibration of LRFD resistance factors for pile foundations as the FHWA’s Deep Foundation Load Test Database. By narrowing geographical boundaries while maintaining a high number of pile load tests, PILOT exemplifies a model for effective regional LRFD calibration procedures.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Laser scanning is a terrestrial laser-imaging system that creates highly accurate three-dimensional images of objects for use in standard computer-aided design software packages. This report describes results of a pilot study to investigate the use of laser scanning for transportation applications in Iowa. After an initial training period on the use of the scanner and Cyclone software, pilot tests were performed on the following projects: intersection and railroad bridge for training purposes; section of highway to determine elevation accuracy and pair of bridges to determine level of detail that can be captured; new concrete pavement to determine smoothness; bridge beams to determine camber for deck-loading calculations; stockpile to determine volume; and borrow pit to determine volume. Results show that it is possible to obtain 2-6 mm precision with the laser scanner as claimed by the manufacturer compared to approximately one-inch precision with aerial photogrammetry using a helicopter. A cost comparison between helicopter photogrammetry and laser scanning showed that laser scanning was approximately 30 percent higher in cost depending on assumptions. Laser scanning can become more competitive to helicopter photogrammetry by elevating the scanner on a boom truck and capturing both sides of a divided roadway at the same time. Two- and three-dimensional drawings were created in MicroStation for one of the scanned highway bridges. It was demonstrated that it is possible to create such drawings within the accuracy of this technology. It was discovered that a significant amount of time is necessary to convert point cloud images into drawings. As this technology matures, this task should become less time consuming. It appears that laser scanning technology does indeed have a place in the Iowa Department of Transportation design and construction toolbox. Based on results from this study, laser scanning can be used cost effectively for preliminary surveys to develop TIN meshes of roadway surfaces. It also appears that this technique can be used quite effectively to measure bridge beam camber in a safer and quicker fashion compared to conventional approaches. Volume calculations are also possible using laser scanning. It seems that measuring quantities of rock could be an area where this technology would be quite beneficial since accuracy is more important with this material compared to soil. Other applications for laser scanning could include developing as-built drawings of historical structures such as the bridges of Madison County. This technology could also be useful where safety is a concern such as accurately measuring the surface of a highway active with traffic or scanning the underside of a bridge damaged by a truck. It is recommended that the Iowa Department of Transportation initially rent the scanner when it is needed and purchase the software. With time, it may be cost justifiable to purchase the scanner as well. Laser scanning consultants can be hired as well but at a higher cost.