The routine maintenance along Iowa's highways and roadways during the summer growing season is a time consuming and costly endeavor. Trimming around guardrail posts and delineator posts is especially costly due to the handwork required. Trimming costs account for approximately 50% of the shoulder mowing costs according to expense figures obtained from the Iowa Department of Transportation (DOT), Office of Maintenance. The FY 2001 statewide trimming costs for the Iowa DOT was approximately $430,000 ($305,000 labor, $125,000 equipment and materials). This product would be required to perform well for 9-21 years, on average, in order to recoup the cost of installation. This includes the durability of the product, but not the cost of repair due to traffic damage, snowplow and wing damage, or damage caused by mowing operations. Maintenance costs associated with vegetation creep over the mats and repair costs would extend the required service life. As a result of resource realignment, the Iowa DOT roadside maintenance policy, for FY 2003 and the future, will be to eliminate trimming around delineator posts unless the reflector is obstructed. This policy change will effectively eliminate the need for weed control mats due to the significant reduction in trimming. The use of the weed control mats could be justified in areas that are dangerous to maintenance workers such as guardrail installations in high traffic areas. Because the delineator posts are further from the edge of the traveled roadway, there is a reduced risk to the maintenance workforce while hand trimming. Because the DuroTrim Vegetation Control Mats appear to have performed adequately in the field trial, they could be considered for use, where safety conditions warrant. That use should be limited, however, due to the considerable initial cost and changes in Iowa DOT roadside maintenance policy. Application should be limited to instances where the use of the DuroTrim Vegetation Control Mats would have a significant impact on the safety of the roadside maintenance workers. The cost savings, due to the elimination of the trimming and mowing alone, is not enough to justify their use in most situations at their current cost. The test sections will continue to be monitored periodically so that approximate service life can be determined.
Resumo:
Fast track concrete has proven to be successful in obtaining high early strengths. This benefit does not come without cost. Type III cement and insulation blankets to accelerate the cure add to its expense when compared to conventional paving. This research was intended to determine the increase in time required to obtain opening strength when a fast track mix utilized conventional Type I cement and also used a conventional cure. Standard concrete mixes also were tested to determine the acceleration of strength gain when cured with insulation blankets. The goal was to determine mixes and procedures which would result in a range of opening times. This would allow the most economical design for a particular project and tailor it to that projects time restraint. Three mixes were tested: Class F, Class C, and Class B. Each mix was tested with one section being cured with insulation blankets and another section without. All used Type I cement. Iowa Department of Transportation specifications required 500 psi of flexural strength before a pavement can be opened to traffic. The Class F mix with Type I cement and using insulation blankets reached that strength in approximately 36 hours, the Class C mix using the blankets in approximately 48 hours, and the Class F mix without covers in about 60 hours. (Note: Class F concrete pavement is opened at 400 psi minimum and Class F bonded overlay pavement at 350 psi.) The results showed a significant improvement in early strength gain by the use of insulation blankets. The Type I cement could be used in mixes intended for early opening with sacrifices in time when compared to fast track but are still much sooner than conventional pavement. It appears a range of design alternatives is possible using Type I cement both with and without insulating blankets.
Resumo:
(In Vietnamese)Familial status, or presence of children in the home, protects families with children under 18 years of age. Also protected are families seeking custody of a child or expecting the birth of a child. There is only a narrow exception to this part of the law: units designated as “housing for older persons.” Property owners are required by the law to allow reasonable modifications to a property (at the tenant’s expense) and to make reasonable accommodations in policies in order to accommodate the needs of persons with disabilities.