70 resultados para Performance Rating System

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. The research reported here was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The goal of this study is to develop a usable sufficiency rating system for secondary roads. There are several assumptions that have been made at the outset. These are: 1. County engineers currently use at least a limited set of decision criteria to make decisions regarding project priorities. 2. Some degree of consensus exists among the county engineers in terms of which are the most important criteria and that there is some agreement on their relative importance. Accordingly, a questionnaire was developed which could be used as a survey tool. The results of the survey were used to develop a final list of weighted rating elements which were used as part of the proposed sufficiency rating system. State and local jurisdictions from other states were also surveyed to determine the status of the use of sufficiency rating systems for secondary roads outside of Iowa and to gather some applicable data.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. Some elements of an existing system used for primary roads could be modified for use with secondary roads, but would require extensive changes. The research reported here, sponsored by the Iowa Department of Transportation, was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county. If a usable system were available that would yield reasonable results, county engineers would have an additional tool available to assist them in arriving at a defensible road improvement program.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The work described in this report documents the activities performed for the evaluation, development, and enhancement of the Iowa Department of Transportation (DOT) pavement condition information as part of their pavement management system operation. The study covers all of the Iowa DOT’s interstate and primary National Highway System (NHS) and non-NHS system. A new pavement condition rating system that provides a consistent, unified approach in rating pavements in Iowa is being proposed. The proposed 100-scale system is based on five individual indices derived from specific distress data and pavement properties, and an overall pavement condition index, PCI-2, that combines individual indices using weighting factors. The different indices cover cracking, ride, rutting, faulting, and friction. The Cracking Index is formed by combining cracking data (transverse, longitudinal, wheel-path, and alligator cracking indices). Ride, rutting, and faulting indices utilize the International Roughness Index (IRI), rut depth, and fault height, respectively.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The passage of the Workforce Investment Act (WIA) of 1998 [Public Law 105-220] by the 105th Congress has ushered in a new era of collaboration, coordination, cooperation and accountability. The overall goal of the Act is “to increase the employability, retention, and earnings of participants, and increase occupational skill attainment by participants, and, as a result improve the quality of the workforce, reduce welfare dependency, and enhance the productivity and competitiveness of the Nation.” The key principles inculcated in the Act are: • Streamlining services; • Empowering individuals; • Universal access; • Increased accountability; • New roles for local boards; • State and local flexibility; • Improved youth programs. The purpose of Title II, The Adult Education and Family Literacy Act (AEFLA), of the Workforce Investment Act of 1998 is to create a partnership among the federal government, states, and localities to provide, on a voluntary basis, adult education and literacy services in order to: • Assist adults become literate and obtain the knowledge and skills necessary for employment and self-sufficiency; • Assist adults who are parents obtain the educational skills necessary to become full partners in the educational development of their children; • Assist adults in the completion of a secondary school education. Adult education is an important part of the workforce investment system. Title II restructures and improves programs previously authorized by the Adult Education Act. AEFLA focuses on strengthening program quality by requiring States to give priority in awarding funds to local programs that are based on a solid foundation of research, address the diverse needs of adult learners, and utilize other effective practices and strategies. To promote continuous program involvement and to ensure optimal return on the Federal investment, AEFLA also establishes a State performance accountability system. Under this system, the Secretary and each State must reach agreement on annual levels of performance for a number of “core indicators” specified in the law: • Demonstrated improvements in literacy skill levels in reading, writing, and speaking the English language, numeracy, problem solving, English language acquisition, and other literacy skills. • Placement in, retention in, or completion of postsecondary education, training, unsubsidized employment or career advancement. • Receipt of a secondary school diploma or its recognized equivalent. Iowa’s community college based adult basic education program has implemented a series of proactive strategies in order to effectively and systematically meet the challenges posed by WIA. The Iowa TOPSpro Data Dictionary is a direct result of Iowa’s pro-active efforts in this educational arena.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A large percentage of bridges in the state of Iowa are classified as structurally or fiinctionally deficient. These bridges annually compete for a share of Iowa's limited transportation budget. To avoid an increase in the number of deficient bridges, the state of Iowa decided to implement a comprehensive Bridge Management System (BMS) and selected the Pontis BMS software as a bridge management tool. This program will be used to provide a selection of maintenance, repair, and replacement strategies for the bridge networks to achieve an efficient and possibly optimal allocation of resources. The Pontis BMS software uses a new rating system to evaluate extensive and detailed inspection data gathered for all bridge elements. To manually collect these data would be a highly time-consuming job. The objective of this work was to develop an automated-computerized methodology for an integrated data base that includes the rating conditions as defined in the Pontis program. Several of the available techniques that can be used to capture inspection data were reviewed, and the most suitable method was selected. To accomplish the objectives of this work, two userfriendly programs were developed. One program is used in the field to collect inspection data following a step-by-step procedure without the need to refer to the Pontis user's manuals. The other program is used in the office to read the inspection data and prepare input files for the Pontis BMS software. These two programs require users to have very limited knowledge of computers. On-line help screens as well as options for preparing, viewing, and printing inspection reports are also available. The developed data collection software will improve and expedite the process of conducting bridge inspections and preparing the required input files for the Pontis program. In addition, it will eliminate the need for large storage areas and will simplify retrieval of inspection data. Furthermore, the approach developed herein will facilitate transferring these captured data electronically between offices within the Iowa DOT and across the state.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Federal Highway Administration mandates that states collect traffic count information at specified intervals to meet the needs of the Highway Performance Monitoring System (HPMS). A manual land use change detection method was employed to determine the effects of land use change on traffic for Black Hawk County, Iowa, from 1994 to 2002. Results from land use change detection could enable redirecting traffic count activities and related data management resources to areas that are experiencing the greatest changes in land use and related traffic volume. Including a manual land use change detection process in the Iowa Department of Transportation’s traffic count program has the potential to improve efficiency by focusing monitoring activities in areas more likely to experience significant increase in traffic.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This is the final Report to the Iowa DOT Offices of Construction and the Highway Division for the calendar year 1999 research project entitled - Continuation of Benchmarking Project: Phase IV. This project continues efforts started in 1995 with the development of a performance measurement system. The performance measurements were used to identify areas that required improvement and process improvement teams (PITs) were launched to make recommendations for improvement. This report provides a brief historical background, documents Benchmark Steering Team Activities, describes measurement activities including the employee survey and collection of non-survey data. Then a retrospective of past PIT activities is given, which sets the stage for the substantial increase in PIT activity that occurred during the winter of 1998/9. Finally, the report closes with suggestions for future directions in Benchmarking Activity.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This report documents the results of the field inventory and evaluation of the nominated routes. Data is provided describing the visual and heritage character of the nominated routes and locations important to this character. Graphs, displays and maps were produced using the rating system described in the Iowa Scenic Byway Designation Guide. Discussions of specific inventory procedures and evaluation techniques can be found in two reports, Iowa Scenic Byway Evaluation, December 1992, and Iowa Scenic Byway Evaluation, November 1995.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This report documents the results of the field inventory and evaluation of the nominated routes. Data is provided describing the visual and heritage character of the nominated routes and locations important to this character. Graphs, displays and maps were produced using the rating system described in the Iowa Scenic Byway Designation Guide. Discussions of specific inventory procedures and evaluation techniques can be found in two reports, Iowa Scenic Byway Evaluation, December 1992, and Iowa Scenic Byway Evaluation, November 1995.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Building on previous research, the goal of this project was to identify significant influencing factors for the Iowa Department of Transportation (DOT) to consider in future updates of its Instructional Memorandum (I.M.) 3.213, which provides guidelines for determining the need for traffic barriers (guardrail and bridge rail) at secondary roadway bridges—specifically, factors that might be significant for the bridge rail rating system component of I.M. 3.213. A literature review was conducted of policies and guidelines in other states and, specifically, of studies related to traffic barrier safety countermeasures at bridges in several states. In addition, a safety impact study was conducted to evaluate possible non-driver-related behavior characteristics of crashes on secondary road structures in Iowa using road data, structure data, and crash data from 2004 to 2013. Statistical models (negative binomial regression) were used to determine which factors were significant in terms of crash volume and crash severity. The study found that crashes are somewhat more frequent on or at bridges possessing certain characteristics—traffic volume greater than 400 vehicles per day (vpd) (paved) or greater than 50 vpd (unpaved), bridge length greater than 150 ft (paved) or greater than 35 ft (unpaved), bridge width narrower than its approach (paved) or narrower than 20 ft (unpaved), and bridges older than 25 years (both paved and unpaved). No specific roadway or bridge characteristic was found to contribute to more serious crashes. The study also confirmed previous research findings that crashes with bridges on secondary roads are rare, low-severity events. Although the findings of the study support the need for appropriate use of bridge rails, it concludes that prescriptive guidelines for bridge rail use on secondary roads may not be necessary, given the limited crash expectancy and lack of differences in crash expectancy among the various combinations of explanatory characteristics.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Agency Performance Plan

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Agency Performance Report

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Agency Performance Report

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Agency Performance Report