6 resultados para Pavement design
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
This report is submitted pursuant to a contract dated August 30, 1967, between the Iowa State Highway Commission and Howard, Needles, Tammen & Bergendoff, Consulting Engineers, in connection with studies determining (11,A) alternate pavement designs, and (11,B) criteria for geometric design studies. Included herein is that portion of the report covering Paragraph 11,A, comprising preparation of alternate type pavement designs (Portland Cement and Asphaltic Concrete) for the Cedar Valley Freeway and proposed US-518 from 1-80 to US-30. These alternate pavement designs consider quality and availability of aggregates, soil conditions and traffic information, to determine details and dimensions of pavement design. Comparative cost studies were prepared from alternate design data and recommendations as to pavement type are presented for Commission review.
Resumo:
The design number of gyrations (Ndesign) introduced by the Strategic Highway Research Program (SHRP) and used in the Superior Performing Asphalt Pavement (Superpave) mix design method has been commonly used in flexible pavement design throughout the US since 1996. Ndesign, also known as the compaction effort, is used to simulate field compaction during construction and has been reported to produce air voids that are unable to reach ultimate pavement density within the initial 2 to 3 years post-construction, potentially having an adverse impact on long-term performance. Other state transportation agencies have conducted studies validating the Ndesign for their specific regions, which resulted in modifications of the gyration effort for the various traffic levels. Validating this relationship for Iowa asphalt mix designs will lead to better correlations between mix design target voids, field voids, and performance. A comprehensive analysis of current Ndesign levels investigated the current levels with existing mixes and pavements and developed initial asphalt mix design recommendations that identify an optimum Ndesign through the use of performance data tests.
Resumo:
Portland cement concrete (PCC) pavement undergoes repeated environmental load-related deflection resulting from temperature and moisture variations across the pavement depth. This phenomenon, referred to as PCC pavement curling and warping, has been known and studied since the mid-1920s. Slab curvature can be further magnified under repeated traffic loads and may ultimately lead to fatigue failures, including top-down and bottom-up transverse, longitudinal, and corner cracking. It is therefore important to measure the “true” degree of curling and warping in PCC pavements, not only for quality control (QC) and quality assurance (QA) purposes, but also to achieve a better understanding of its relationship to long-term pavement performance. In order to better understand the curling and warping behavior of PCC pavements in Iowa and provide recommendations to mitigate curling and warping deflections, field investigations were performed at six existing sites during the late fall of 2015. These sites included PCC pavements with various ages, slab shapes, mix design aspects, and environmental conditions during construction. A stationary light detection and ranging (LiDAR) device was used to scan the slab surfaces. The degree of curling and warping along the longitudinal, transverse, and diagonal directions was calculated for the selected slabs based on the point clouds acquired using LiDAR. The results and findings are correlated to variations in pavement performance, mix design, pavement design, and construction details at each site. Recommendations regarding how to minimize curling and warping are provided based on a literature review and this field study. Some examples of using point cloud data to build three-dimensional (3D) models of the overall curvature of the slab shape are presented to show the feasibility of using this 3D analysis method for curling and warping analysis.
Resumo:
One significant benefit of asphalt concrete pavement construction is that it may be opened to traffic within one hour after being laid. Therefore, road closure and detour are not necessary, but only temporary lane closure and control of traffic. This one lane construction, even though desirable in regard to maintaining traffic flow, does pose an additional problem. The longitudinal joint at centerline often becomes a maintenance problem. The objective of this research project is to identify construction procedures that will provide an improved centerline joint.
Resumo:
This document briefly summarizes the pavement management activities under the existing Iowa Department of Transportation (DOT) Pavement Management System. The second part of the document provides projected increase in use due to the implementation of the Iowa DOT Pavement Management Optimization System. All estimates of existing time devoted to the Pavement Management System and project increases in time requirements are estimates made by the appropriate Iowa DOT office director or function manager. Included is the new Pavement Management Optimization Structure for the three main offices which will work most closely with the Pavement Management Optimization System (Materials, Design, and Program Management).
Resumo:
This study had three objectives: (1) to develop a comprehensive truck simulation that executes rapidly, has a modular program construction to allow variation of vehicle characteristics, and is able to realistically predict vehicle motion and the tire-road surface interaction forces; (2) to develop a model of doweled portland cement concrete pavement that can be used to determine slab deflection and stress at predetermined nodes, and that allows for the variation of traditional thickness design factors; and (3) to implement these two models on a work station with suitable menu driven modules so that both existing and proposed pavements can be evaluated with respect to design life, given specific characteristics of the heavy vehicles that will be using the facility. This report summarizes the work that has been performed during the first year of the study. Briefly, the following has been accomplished: A two dimensional model of a typical 3-S2 tractor-trailer combination was created. A finite element structural analysis program, ANSYS, was used to model the pavement. Computer runs have been performed varying the parameters defining both vehicle and road elements. The resulting time specific displacements for each node are plotted, and the displacement basin is generated for defined vehicles. Relative damage to the pavement can then be estimated. A damage function resulting from load replications must be assumed that will be reflected by further pavement deterioration. Comparison with actual damage on Interstate 80 will eventually allow verification of these procedures.