5 resultados para Passive heating and cooling
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Every year, a typical family in the United States spends around half of its home energy budget on heating and cooling. In Iowa, that percentage can be higher, due to temperature extremes reached during the winter and summer months. Unfortunately, many of those dollars often are wasted, because conditioned air escapes through leaky ceilings, walls and foundations—or flows through inadequately insulated attics, exterior walls and basements. In addition, many heating systems and air conditioners aren’t properly maintained or are more than 10 years old and very inefficient, compared to models being sold today. As a result, it makes sense to analyze your home as a collection of systems that must work together in order to achieve peak energy savings. For example, you won’t get anywhere near the savings you’re expecting from a new furnace if your airhandling ducts are uninsulated and leak at every joint. The most energy-efficient central air-conditioning setup won’t perform to your expectations if your attic insulation is inadequate and can’t reduce solar heat gain to help keep your home cool. And planting the wrong types of trees or shrubs close to your home adversely can affect potential energy savings all year long.
Resumo:
The average Iowa family spends more than half of its annual household energy bill on heating and cooling. That’s a significant number, but you can dramatically reduce these costs—up to 20 percent, according to ENERGY STAR®—by making some simple energy-saving weatherization and insulation improvements to your home. In addition—with a little attention to proper ventilation—you can protect your home from moisture damage year-round, reduce problems caused by ice dams on the roof during the winter and significantly cut summer cooling costs. As a bonus, these projects can extend the life of your home and may increase the resale value of your property. If you like to fix things around the house, you can handle many of the projects suggested in this book and make the most of your energy-improvement budget. However, don’t hesitate to call a professional for help if you’d rather not do the work yourself; the dollars gained through energy savings in upcoming years will be worth the expense.
Resumo:
This guide describes things you can do around your home to reduce your utility bills and save you money. It offers some easy, practical steps that you can take to save energy and reduce the cost of heating and cooling your home. There are also tips on ways to reduce your electric and water usage. In addition, energy related health and safety information is also included. So, take a few minutes to read this guide and save it so you can refer to it in the future.
Resumo:
After some success with a small asphalt pavement recycling project in 1975, Kossuth County, Iowa programmed a much larger undertaking during the 1976 construction season. The work performed in 1975 indicated that a quality product could be produced with some modifications to conventional equipment. As anticipated , the major problem encountered was the excessive air pollution created during the heating and mixing process. As part of its 1976 road program, Kossuth County developed plans for recycling sixteen miles of existing asphalt pavements using the "hot mix" recycling process. One project, ten miles in length, was selected by the Federal Highway Authority as part of "Demonstration Project No. 39, Recycling Asphalt Pavements." The FHWA provided a $29,500 grant t o the project to be used for project testing and evaluation. Cooperation and input into the work proposed for 1976 was received from many sources. The people and organizations contributing were the Federal Highway Authority, the Iowa Department of Environmental Quality, the Federal Environmental Protection Agency, several contractors, and personnel from the Kossuth County Engineer's Office.
Resumo:
The highway departments of the states which use integral abutments in bridge design were contacted in order to study the extent of integral abutment use in skewed bridges and to survey the different guidelines used for analysis and design of integral abutments in skewed bridges. The variation in design assumptions and pile orientations among the various states in their approach to the use of integral abutments on skewed bridges is discussed. The problems associated with the treatment of the approach slab, backfill, and pile cap, and the reason for using different pile orientations are summarized in the report. An algorithm based on a state-of-the-art nonlinear finite element procedure previously developed by the authors was modified and used to study the influence of different factors on behavior of piles in integral abutment bridges. An idealized integral abutment was introduced by assuming that the pile is rigidly cast into the pile cap and that the approach slab offers no resistance to lateral thermal expansion. Passive soil and shear resistance of the cap are neglected in design. A 40-foot H pile (HP 10 X 42) in six typical Iowa soils was analyzed for fully restrained pile head and pinned pile head. According to numerical results, the maximum safe length for fully restrained pile head is one-half the maximum safe length for pinned pile head. If the pile head is partially restrained, the maximum safe length will lie between the two limits. The numerical results from an investigation of the effect of predrilled oversized holes indicate that if the length of the predrilled oversized hole is at least 4 feet below the ground, the vertical load-carrying capacity of the H pile is only reduced by 10 percent for 4 inches of lateral displacement in very stiff clay. With no predrilled oversized hole, the pile failed before the 4-inch lateral displacement was reached. Thus, the maximum safe lengths for integral abutment bridges may be increased by predrilling. Four different typical Iowa layered soils were selected and used in this investigation. In certain situations, compacted soil (> 50 blow count in standard penetration tests) is used as fill on top of natural soil. The numerical results showed that the critical conditions will depend on the length of the compacted soil. If the length of the compacted soil exceeds 4 feet, the failure mechanism for the pile is similar to one in a layer of very stiff clay. That is, the vertical load-carrying capacity of the H pile will be greatly reduced as the specified lateral displacement increases.