9 resultados para PRINCIPLES AND ARISTOTELIAN CAUSES
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Task Force members formulated these principles and practices as a way to promote good management practices, ethical conduct, and public accountability. By compiling the information in this guide, we hope to provide a valuable tool for organizations and individuals as they go about the work of building better Iowa communities.
Resumo:
CMS has established the medicaid Quality Improvement which serves to fulfill the objectives of they Medicaid Quality goal established through the Federal Government Performance and Results At. One of the objectives of the goal calls for the Centers foe Medicare and Medicaid Services to work in partnership with State Medicaid Directors to develop a Nation Medicaid Quality Framework that will articulate broad principles and a common vision of quality for the program.
Resumo:
Early Childhood Iowa (ECI) is an alliance of stakeholders in early care, health, and education that affect children age zero to five in the State of Iowa. Its purpose is to support a comprehensive, integrated early care, health and education system for Iowa. All activities of the system are aligned around a common vision for Iowa: Every child, beginning at birth, will be healthy and successful.Membership is voluntary and open to anyone self-identifying as a “stakeholder” in Iowa’s early care, health, and education system. The process for membership will be with as few barriers or constraints as possible. Individuals seeking membership should agree to the vision for an early care, health, and education system in Iowa and to the principles and core beliefs of the ECI Stakeholders. The structure of ECI includes six system component groups that describe the necessary elements of an effective and comprehensive early care, health, and education system, as well as a State Agency Liaison group and a Co-chairs group. Membership in each component group is open to anyone with an interest in the unique responsibilities of a implementing an early care, health and education system.
Resumo:
This report presents the results of surveys to determine studded tire usage in Iowa. Also reported are the results of measurements of transverse pavement profiles at selected locations where the pavement is subjected to a high volume of traffic. The surveys were made in January of each of the years 1969 through 1978 and in each of 27 areas into which the state was divided. Estimates of studded tire usage were also made at various locations on Interstate highways in Iowa. The lowest percentage of studded tires was observed in the initial count during the winter of 1968-69. Two years later the percentage had increased to the maximum (22.6%) and then began a gradual decline. The latest count in January of 1978 indicated 8.5% of the cars had studded tires. The decline in the use of studded tires is attributed to the efforts of the Iowa DOT and others to obtain a ban on studded tires and a continual increase in the use of radial tires with claims of improved traction. The wear measurements were recorded by camera. It was found that studded tires have worn ruts in Iowa pavements as deep as 5/16 inch. The ruts lead to water on the pavement and this causes hydroplaning, as well as splash and spray. The conclusion of the study was that studded tires should be banned in Iowa.
Resumo:
Principles and techniques that should be followed to either promote or retard coppice regeneration.
Resumo:
It is a pleasure to submit this report of our investigation of the experience of the Iowa Public Employees’ Retirement System for the period of July 1, 2005 through June 30, 2009. The set of assumptions recommended as a result of this study will be used in the June 30, 2010 actuarial valuation of IPERS which will be used to analyze the funding status of the system, calculate the actuarial and statutory employer contribution rates, and disclose employer liabilities for financial statements. The purpose of this report is to communicate the results of our review of the actuarial methods and assumptions to be used in the completion of the upcoming valuation. Our recommendations represent changes from the prior methods or assumptions, which are intended to better anticipate the emerging experience of the System. Actual future experience, however, may differ from these assumptions. In preparing this report, we relied without audit on information supplied by IPERS staff. In our examination, we have found the data to be reasonably consistent and comparable with data used for other purposes. It should be noted that if any data or other information is inaccurate or incomplete, our calculations might need to be revised. We would like to acknowledge the help given by IPERS staff in the preparation of this report. We hereby certify that, to the best of our knowledge and belief, this report is complete and accurate and has been prepared in accordance with generally recognized and accepted actuarial principles and practices which are consistent with the principles prescribed by the Actuarial Standards Board (ASB) and the Code of Professional Conduct and qualification Standards for Public Statements of Actuarial Opinion of the American Academy of Actuaries.
Resumo:
The I-74 Aesthetic Design Guideline (ADG) document has two primary goals: To establish and identify an overall design theme To prioritize enhancement opportunities within the framework of corridor elements The recommendations of this report have been developed based on an “unconstrained” framework for future corridor–wide enhancements. Future funding availability, along with the recommendations of this report, will guide the final design process. ADG Future Uses: This document is intended to be used as a reference to future processes in the following ways: Guidance for I-74 final design teams Reference document for future local community redevelopment initiatives Inspiration for identification and development of other I-74 corridor aesthetic enhancement opportunities Process: As illustrated in Figure 1.3, the overall process for corridor aesthetics began traditionally with inventory and identification of potential aesthetic applications. The ADG does not document all the reports and presentations related to these early design stages, but has incorporated these efforts into the design theme, guiding principles and prioritized enhancements shown on the following pages of this report. The I-74 final design phase will incorporate these recommendations into the project. The consultant design team and representatives of the DOTs have worked with the CAAT members to facilitate community input and have helped develop recommendations for improving I-74 corridor aesthetics. CAAT recommendations have been advanced to the I-74 Advisory Committee for review and endorsement. Both DOTs have reviewed the CAAT recommendations and have endorsed the contents of this report. Figure 1.4 illustrates the status of corridor aesthetic design development. As of the date of this report, aesthetic design is approximately 50% complete. Future detailed design, cost evaluation, feasibility and prioritizations all need to occur for this process to be successfully completed.
Resumo:
Red light running (RLR) is a problem in the US that has resulted in 165,000 injuries and 907 fatalities annually. In Iowa, RLR-related crashes make up 24.5 percent of all crashes and account for 31.7 percent of fatal and major injury crashes at signalized intersections. RLR crashes are a safety concern due to the increased likelihood of injury compared to other types of crashes. The research team developed this toolbox for practitioners to address RLR crashes. The Four Es—Engineering, Enforcement, Education, and Emergency Response—should be used together to address RLR problems. However, this toolbox focuses on engineering, enforcement, and education solutions. The toolbox has two major parts: Guidelines to identify problem intersections and the causes of RLR at intersections Roadway-based and enforcement countermeasures for RLR
Resumo:
The textured concrete surface on all PCC primary paving projects (and when specified on secondary projects) is required to be grooved in a specified manner. The laboratory test for determining the efficiency index of concrete curing compounds is made on slabs that are not grooved. This short investigation was undertaken to determine any changes in the curing efficiency index when using various rates of application of curing compound on grooved concrete. Currently a 95 percent curing efficiency index is specified at an application rate of 15 square yards per gallon. Can this efficiency be achieved, and if so at what application rate, on grooved concrete? Grooving the concrete greatly increases the surface area and also causes the liquid curing compound to run off the high spots and collect in the grooves.