13 resultados para Ordinary polynomials

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Highway Division of the Iowa Department of Transportation engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; second, to identify and implement improved engineering and management practices. This report, entitled Highway Division Highway Research and Development in Iowa, is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund respectively. It is a report of the status of research and development projects, which were in progress on June 30, 2005; it is also a report on projects completed during the fiscal year beginning July 1, 2004, and ending June 30, 2005. Detailed information on each of the research and development projects mentioned in this report is available in the Research and Technology Bureau in the Highway Division of the Iowa Department of Transportation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Highway Division of the Iowa Department of Transportation engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; and second, to identify and implement improved engineering and management practices. This report is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects, which were in progress on June 30, 2006; it is also a report on projects completed during the fiscal year beginning July 1, 2005, and ending June 30, 2006.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Highway Division of the Iowa Department of Transportation (Iowa DOT) engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; second, to identify and implement improved engineering and management practices. This report, entitled “Iowa Highway Research Board Research and Development Activities FY2007” is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund respectively. It is a report of the status of research and development projects, which were in progress on June 30, 2007; it is also a report on projects completed during the fiscal year beginning July 1, 2006, and ending June 30, 2007. Detailed information on each of the research and development projects mentioned in this report is available in the Research and Technology Bureau in the Highway Division of the Iowa Department of Transportation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

RESEARCH AND DEVELOPMENT The Highway Division of the Iowa Department of Transportation (Iowa DOT) engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; second, to identify and implement improved engineering and management practices. This report, entitled "Iowa Highway Research Board Research and Development Activities FY2008" is submitted in compliance with Sections 310.36 and 3 I2.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund respectively. It is a report of the status of research and development projects in progress on June 30, 2008; it is also a report on projects completed during the fiscal year beginning July 1, 2007, and ending June 30, 2008. Detailed information on each of the research and development projects mentioned in this report is available in the Research and Technology Bureau in the Highway Division of the Iowa Department of Transportation. IOWA HIGHWAY RESEARCH BOARD In developing a progressive, continuing and coordinated program of research and development, the Highway Division is assisted by the Iowa Highway Research Board. This advisory group was established in 1949 by the Iowa State Highway Commission to respond to the research denoted in Section 310.36 of the Code of Iowa and now is denoted by 312.3A. The Research Board consists of 15 regular members: seven Iowa county engineers, four Iowa DOT engineers, one representative from Iowa State University, one from The University of Iowa, and two engineers employed by Iowa municipalities. Each regular member may have an alternate who will serve at the request of the regular member. The regular members and their alternates are appointed for a three-year term. The membership of the Research Board as of June 30, 2008, is listed in Table I. The Research Board held nine regular meetings during the period ofJuly 1, 2007, to June 30, 2008. Suggestions for research and development were reviewed at these meetings and recommendations were made by the Board.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

RESEARCH AND DEVELOPMENT The Highway Division of the Iowa Department of Transportation (Iowa DOT) engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; second, to identify and implement improved engineering and management practices. This report, entitled "Iowa Highway Research Board Research and Development Activities FY2008" is submitted in compliance with Sections 310.36 and 3 I2.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund respectively. It is a report of the status of research and development projects in progress on June 30, 2008; it is also a report on projects completed during the fiscal year beginning July 1, 2007, and ending June 30, 2008. Detailed information on each of the research and development projects mentioned in this report is available in the Research and Technology Bureau in the Highway Division of the Iowa Department of Transportation. IOWA HIGHWAY RESEARCH BOARD In developing a progressive, continuing and coordinated program of research and development, the Highway Division is assisted by the Iowa Highway Research Board. This advisory group was established in 1949 by the Iowa State Highway Commission to respond to the research denoted in Section 310.36 of the Code of Iowa and now is denoted by 312.3A. The Research Board consists of 15 regular members: seven Iowa county engineers, four Iowa DOT engineers, one representative from Iowa State University, one from The University of Iowa, and two engineers employed by Iowa municipalities. Each regular member may have an alternate who will serve at the request of the regular member. The regular members and their alternates are appointed for a three-year term. The membership of the Research Board as of June 30, 2008, is listed in Table I. The Research Board held nine regular meetings during the period ofJuly 1, 2007, to June 30, 2008. Suggestions for research and development were reviewed at these meetings and recommendations were made by the Board.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Highway Division of the Iowa Department of Transportation (Iowa DOT) engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; and second, to identify and implement improved engineering and management practices. This report, entitled ―Iowa Highway Research Board Research and Development Activities FY2009‖ is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in progress on June 30, 2009. It is also a report on projects completed during the fiscal year beginning July 1, 2008 and ending June 30, 2009. Detailed information on each of the research and development projects mentioned in this report is available from the Research and Technology Bureau, Highway Division, Iowa Department of Transportation. All approved reports are also online for viewing at: www.iowadot.gov/operationsresearch/reports.aspx.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Highway Division of the Iowa Department of Transportation (Iowa DOT) engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; and second, to identify and implement improved engineering and management practices. This report, entitled ―Iowa Highway Research Board Research and Development Activities FY2009‖ is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report is presented in two parts . P a r t I takes a new look at the design of rest area stabilization ponds after nearly 10 years' experience with some of the existing ponds and in the light of new design standards issued by Iowa DEQ. The Iowa DOT is embarking on improvements t o the ponds a t some of the r e s t areas. These improvements may include installation of drainage tile around the ponds to lower the water table below the pond bottom, sealing of the ponds with bentonite clay to reduce the infiltration to limits recently established by Iowa DEQ, and the enlargement of the ponds installation of aeration equipment t o increase the pond capacity. As the Iowa DOT embarks on this improvement program, it behooves them t o make only the improvements that are absolutely necessary to achieve waste water treatment goals. These ponds are subject to an extremely seasonal load and thus the ordinary standards used for pond design are not appropriate. Thus, Part I of the report presents a rationale for design and operation of the ponds which is deemed appropriate for t h e i r unique seasonally loaded character. Part I1 of the report looks a t the feasibility of using wind power for the aeration of the ponds, if and when aeration is deemed necessary.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Highway Division of the Iowa DOT engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; and second, to identify and implement improved engineering and management practices. This report, entitled ―Iowa Highway Research Board Research and Development Activities FY2011‖ is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in progress on June 30, 2011. It is also a report on projects completed during the fiscal year beginning July 1, 2010 and ending June 30, 2011. Detailed information on each of the research and development projects mentioned in this report is available from the Research and Technology Bureau, Highway Division, Iowa Department of Transportation. All approved reports are also online for viewing at: www.iowadot.gov/operationsresearch/reports.aspx.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Drainage-basin and channel-geometry multiple-regression equations are presented for estimating design-flood discharges having recurrence intervals of 2, 5, 10, 25, 50, and 100 years at stream sites on rural, unregulated streams in Iowa. Design-flood discharge estimates determined by Pearson Type-III analyses using data collected through the 1990 water year are reported for the 188 streamflow-gaging stations used in either the drainage-basin or channel-geometry regression analyses. Ordinary least-squares multiple-regression techniques were used to identify selected drainage-basin and channel-geometry regions. Weighted least-squares multiple-regression techniques, which account for differences in the variance of flows at different gaging stations and for variable lengths in station records, were used to estimate the regression parameters. Statewide drainage-basin equations were developed from analyses of 164 streamflow-gaging stations. Drainage-basin characteristics were quantified using a geographic-information-system (GIS) procedure to process topographic maps and digital cartographic data. The significant characteristics identified for the drainage-basin equations included contributing drainage area, relative relief, drainage frequency, and 2-year, 24-hour precipitation intensity. The average standard errors of prediction for the drainage-basin equations ranged from 38.6% to 50.2%. The GIS procedure expanded the capability to quantitatively relate drainage-basin characteristics to the magnitude and frequency of floods for stream sites in Iowa and provides a flood-estimation method that is independent of hydrologic regionalization. Statewide and regional channel-geometry regression equations were developed from analyses of 157 streamflow-gaging stations. Channel-geometry characteristics were measured on site and on topographic maps. Statewide and regional channel-geometry regression equations that are dependent on whether a stream has been channelized were developed on the basis of bankfull and active-channel characteristics. The significant channel-geometry characteristics identified for the statewide and regional regression equations included bankfull width and bankfull depth for natural channels unaffected by channelization, and active-channel width for stabilized channels affected by channelization. The average standard errors of prediction ranged from 41.0% to 68.4% for the statewide channel-geometry equations and from 30.3% to 70.0% for the regional channel-geometry equations. Procedures provided for applying the drainage-basin and channel-geometry regression equations depend on whether the design-flood discharge estimate is for a site on an ungaged stream, an ungaged site on a gaged stream, or a gaged site. When both a drainage-basin and a channel-geometry regression-equation estimate are available for a stream site, a procedure is presented for determining a weighted average of the two flood estimates.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A lime by-product from the manufacture of acetylene from calcium carbide will be commercially available in Iowa. Since the cost of carbide waste lime f.o.b. source is only about half that of ordinary commercial lime, this material was investigated for potential uses in soil stabilization. The by-product lime is calcium hydroxide in a water slurry with approximately 40% solid concentration. Its effectiveness at stabilizing soils was checked by comparing with commercial high-calcium and dolomitic monohydrate varieties of lime. This was done by soil strength and plasticity tests in addition to studies of the reaction products by X-ray diffraction and chemical methods.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Six subject areas prompted the broad field of inquiry of this mission-oriented dust control and surface improvement project for unpaved roads: • DUST--Hundreds of thousands of tons of dust are created annually by vehicles on Iowa's 70,000 miles of unpaved roads and streets. Such dust is often regarded as a nuisance by Iowa's highway engineers. • REGULATIONS--Establishment of "fugitive dust" regulations by the Iowa DEQ in 1971 has created debates, conferences, legal opinions, financial responsibilities, and limited compromises regarding "reasonable precaution" and "ordinary travel," both terms being undefined judgment factors. • THE PUBLIC--Increased awareness by the public that regulations regarding dust do in fact exist creates a discord of telephone calls, petitions, and increasing numbers of legal citations. Both engineers and politicians are frustrated into allowing either the courts or regulatory agencies to resolve what is basically a professional engineering responsibility. • COST--Economics seldom appear as a tenet of regulatory strategies, and in the case of "fugitive dust," four-way struggles often occur between the highway professions, political bodies, regulatory agencies, and the general public as to who is responsible, what can be done, how much it will cost, or why it wasn't done yesterday. • CONFUSION--The engineer lacks authority, and guidelines and specifications to design and construct a low-cost surf acing system are nebulous, i.e., construct something between the present crushed stone/gravel surface and a high-type pavement. • SOLUTION--The engineer must demonstrate that dust control and surface improvement may be engineered at a reasonable cost to the public, so that a higher degree of regulatory responsibility can be vested in engineering solutions.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

With the recent introduction of blended cements, many ready mix producers are using them as their sole source of cement. Iowa DOT specifications currently do not allow blended cements in patching due to their assumed slower strength gain. Patching specifications require opening at 5 hours on 2-lane or 10 hours on 4-lane pavement. This research will investigate early strength of concrete cast with ordinary Type I/II Portland cements and Type I(SM) blended Portland cements.