14 resultados para Operational Process Management

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

30.00% 30.00%

Publicador:

Resumo:

According to prevailing ecological theory one would expect the most stable vegetation on sites which are least disturbed (Odum 1971). According to theory one would also expect the most diversity of species on undisturbed sites (Odum 1971). This stable and diverse community would be produced over a period of many years through a process of plant succession where annual herbs are replaced by perennial herbs and finally woody plants would come to dominate and perpetuate the community. Another ecological theory holds that the complexity (structure and species diversity) of a plant community is dependent upon the amount of disturbance to which it is subjected (Woodwell, 1970). According to this theory the normal succession of a plant community through its various stages may be arrested at some point depending upon the nature and severity of the disturbance. In applying these theories to roadside vegetation it becomes apparent that mass herbicide spraying and extensive mowing of roadsides has produced a relatively simple and unstable vegetation. It follows that if disturbances were reduced not only would the roadside plant community increase in stability but maintenance costs and energy usage would be reduced. In this study we have investigated several aspects of reduced disturbances on roadside vegetation. Research has centered on the effectiveness of spot spraying techniques on noxious weed control, establishment of native grass cover where ditch cleaning and other disturbance has left the bare soil exposed and the response of roadside vegetation when released from annual mass spraying.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In June, 2007, the Commonwealth Fund released a report entitled, “Aiming Higher: Results from a State Scorecard on Health System Performance.” The report ranked states’ health care performance based upon four areas: access, quality, potentially avoidable use of hospitals and costs of care, and healthy lives. Iowa was ranked second overall and was the only state to rank in the top 25 percent on each of the four measures.1 Coupling the HEDIS measures and CAHPS survey results with the Commonwealth report outcomes provides additional information for determining how the state performs with regard to the health care system, in general, and the Medicaid program specifically. For the past five years the results of eight outcome measures encompassing children and adults, and preventive, chronic and acute care have been reported by the University of Iowa Public Policy Center (PPC). The PPC is the independent evaluator for the Medicaid managed care programs and assists the state in an effort to understand the process of care within the Medicaid program. Seven of the eight measures are recommended by the Centers for Medicare and Medicaid, while the eighth, annual dental visit, is used in recognition of the challenges found in providing dental care to Medicaid‐enrolled children and adults.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Environmental Assessment documents the National Environmental Policy Act (NEPA) process for developing a Comprehensive Conservation Plan (CCP) for the Iowa Wetland Management District (WMD, district). In general, scoping reveals issues that drive alternative ways of managing the district. Implementation of each of those alternative management styles (including the No Action Alternative) may have different effects on the physical, biological, and socio-economic environment. Analysis of these effects reveals the “preferred” alternative, which constitutes the CCP. The CCP includes goals, objectives, and strategies for the district to guide overall management for the next 15 years. The Iowa WMD consists of scattered tracts of habitat (both wetland and upland grassland) known as Waterfowl Production Areas (WPAs). As of 2011, there are 75 WPAs in 18 counties in north-central Iowa totaling 24,712 acres in fee title primarily managed by the Iowa Department of Natural Resources (DNR). Even though district acquisition has only occurred in 18 counties to date, a larger 35-county boundary is approved. This boundary follows the historic range of the poorly drained Prairie Pothole Region (PPR) in Iowa, an area known for its waterfowl production. The district also includes 575 WPA acres and approximately 434 Farm Service Agency acres in conservation easements on private land. This plan was prepared with the intent that the strong partnership with the Iowa DNR will continue over the next 15 years.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Expanded abstract: Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some new best practices for field staff to assist in the inventory, inspection and maintenance of assets along the roadway. The team has spent the past year working through the complexities of identifying the most appropriate tablet hardware for field data collection. A small scale deployment of tablets occurred in spring of 2013 to collect several safety related assets (culverts, signs, guardrail, and incidents). Data can be collected in disconnected or connected modes and there is an associated desktop environment where data can be viewed and queried after being synced into the master database. The development of a deployment plan and related workflow processes are underway; which will eventually feed information into IA DOTs larger asset management system and make the information available for decision making. The team is also working with the IA DOT Design Office on Computer Aided Drafting (CAD) data processing and the IA DOT Construction office with a new digital As-Built plan process to leverage the complete data life-cycle so information can be developed once and leveraged by the Maintenance staff farther along in the process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report is on state-of-the-art research efforts specific to infrastructure inventory/data collection with sign inventory as a case study. The development of an agency-wide sign inventory is based on feature inventory and location information. Specific to location, a quick and simple location acquisition tool is critical to tying assets to an accurate location-referencing system. This research effort provides a contrast between legacy referencing systems (route and milepost) and global positioning system- (GPS-) based techniques (latitude and longitude) integrated into a geographic information system (GIS) database. A summary comparison of field accuracies using a variety of consumer grade devices is also provided. This research, and the data collection tools developed, are critical in supporting the Iowa Department of Transportation (DOT) Statewide Sign Management System development effort. For the last two years, a Task Force has embarked on a comprehensive effort to develop a sign management system to improve sign quality, as well as to manage all aspects of signage, from request, ordering, fabricating, installing, maintaining, and ultimately removing, and to provide the ability to budget for these key assets on a statewide basis. This effort supported the development of a sign inventory tool and is the beginning of the development of a sign management system to support the Iowa DOT efforts in the consistent, cost effective, and objective decision making process when it comes to signs and their maintenance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the United States many bridge structures have been designed without consideration for their unique construction problems. Many problems could have been avoided if construction knowledge and experience was utilized in the design process. A systematic process is needed to create and capture construction knowledge for use in the design process. This study was conducted to develop a system to capture construction considerations from field people and incorporate it into a knowledge-base for use by the bridge designers. This report presents the results of this study. As a part of this study a microcomputer-based constructability system has been developed. The system is a user-friendly microcomputer database which codifies construction knowledge, provides easy access to specifications, and provides simple design computation checks for the designer. A structure for the final database was developed and used in the prototype system. A process for collecting, developing and maintaining the database is presented and explained. The study involved a constructability survey, interviews with designers and constructors, and visits to construction sites to collect constuctability concepts. The report describes the development of the constructability system and addresses the future needs for the Iowa Department of Transportation to make the system operational. A user's manual for the system is included along with the report.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Researchers should continuously ask how to improve the models we rely on to make financial decisions in terms of the planning, design, construction, and maintenance of roadways. This project presents an alternative tool that will supplement local decision making but maintain a full appreciation of the complexity and sophistication of today’s regional model and local traffic impact study methodologies. This alternative method is tailored to the desires of local agencies, which requested a better, faster, and easier way to evaluate land uses and their impact on future traffic demands at the sub-area or project corridor levels. A particular emphasis was placed on scenario planning for currently undeveloped areas. The scenario planning tool was developed using actual land use and roadway information for the communities of Johnston and West Des Moines, Iowa. Both communities used the output from this process to make regular decisions regarding infrastructure investment, design, and land use planning. The City of Johnston case study included forecasting future traffic for the western portion of the city within a 2,600-acre area, which included 42 intersections. The City of West Des Moines case study included forecasting future traffic for the city’s western growth area covering over 30,000 acres and 331 intersections. Both studies included forecasting a.m. and p.m. peak-hour traffic volumes based upon a variety of different land use scenarios. The tool developed took goegraphic information system (GIS)-based parcel and roadway information, converted the data into a graphical spreadsheet tool, allowed the user to conduct trip generation, distribution, and assignment, and then to automatically convert the data into a Synchro roadway network which allows for capacity analysis and visualization. The operational delay outputs were converted back into a GIS thematic format for contrast and further scenario planning. This project has laid the groundwork for improving both planning and civil transportation decision making at the sub-regional, super-project level.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Quality management concrete allows the contractor to develop the mix design for the portland cement concrete. This research was initiated to gain knowledge about contractor mix designs. An experiment was done to determine the variation in cylinders, beams, and cores that could be used to test the strength of the contractor's mix. In addition, the contractor's cylinder strengths and gradations were analyzed for statistical stability and process capability. This research supports the following conclusions: (1) The mold type used to cast the concrete cylinders had an effect on the compressive strength of the concrete. The 4.5-in. by 9-in. (11.43-cm by 22.86-cm) cylinders had lower strength at a 95% confidence interval than the 4-in. by 8-in. (10.16-cm by 20.32-cm) and 6-in. by 12-in. (15.24-cm by 30.48-cm) cylinders. (2) The low vibration consolidation effort had the lowest strength of the three consolidation efforts. In particular, an interaction occurred between the low vibration effort and the 4.5-in. by 9-in. (11.43-cm by 22.86-cm) mold. This interaction produced very low compressive strengths when compared with the other consolidation efforts. (3) A correlation of 0.64 R-squared was found between the 28 day cylinder and 28 day compressive strengths. (4) The compressive strength results of the process control testing were not in statistical control. The aggregate gradations were mostly in statistical control. The gradation process was capable of meeting specification requirements. However, many of the sieves were off target. (5) The fineness modulus of the aggregate gradations did not correlate well with the strength of the concrete. However, this is not surprising considering that the gradation tests and the strength tests did not represent the same material. In addition, the concrete still has many other variables that will affect its strength that were not controlled.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

TPMS is proposed as a distributed, PC-based system for automating two processes required for road improvements in Iowa: a) the annual preparation, submission, and approval of road improvement programs. b) the ongoing process of developing plans and obtaining approval for projects to be let for bids.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for or against full deployment of the pilot solution.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for a full deployment of a field data collection.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Iowa, the Department of Natural Resources (DNR)is responsible for regulating water allocation and use through the issuance of water use permits, but improvements are necessary in this process to assure sustainable supplies into the future. In recent years, there have not been resources dedicated at the state level to properly track and assess water quantity issues. Resources for water use and water quantity monitoring (groundwater level and surface gauges) have continued to decline and have resulted in data becoming outdated and in a format that is difficult to analyze in order to make good decisions.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

According to Iowa crash records, almost 10% of all crashes in Iowa occur at commercial driveways. Most of these crashes occur on arterials within municipalities. In recent years, nearly a quarter of these crashes have occurred in the Des Moines metropolitan area. This makes the Des Moines metropolitan area a prime candidate for improved access management. Case study research in Iowa has shown that access management is an extremely effective highway safety tool—well-managed routes are, on average, 40% safer than poorly managed routes. The Des Moines metropolitan area has many miles of four-lane, undivided arterials constructed when less was known about the importance of managing access to adjacent land development. This project involved a cooperative effort of the Des Moines Area Metropolitan Planning Organization (Des Moines Area MPO) and the Center for Transportation Research and Education (CTRE) at Iowa State University to develop a comprehensive access management study and program for the Des Moines metropolitan area. The goal of the study is to use the knowledge developed to make improvements that will reduce access-related crashes. It is also anticipated that this project will help local officials make better decisions about access management so that future safety and operational problems can be avoided.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Managing existing and newly constructed highway corridors has recently become a significant concern in many states, including Iowa. As urban land and land on the urban fringe develops, there is pressure to add features such as commercial driveways, at-grade public road intersections, and traffic signals to arterial highway routes that should primarily serve high-speed traffic. This diminishes the speed and traffic capacity of such roadways and can also cause significant safety issues. if mobility and safety are diminished, the value of the highway investment is diminished. Since a major highway corridor improvement may cost tens of millions of dollars or more, corridor management is as critical to preserving that investment as is more "hard side" management practices such as pavement or bridge management. Corridor management is a process that applies access management principles to highway corridors in an attempt to balance the competing needs of traffic service, safety, and support for land development. This project helped to identify routes that should be given high priority for corridor management. The pilot study in the form of two corridor management case studies provides an analytical process that can be replicated along the other Iowa commuting corridors using commonly available transportation and land use data resources. It also offers a general set of guidelines for the Iowa Department of Transportation to use in the development of its own comprehensive corridor management program.