29 resultados para Open Research Data

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The objective of this research was to develop a methodology for transforming and dynamically segmenting data. Dynamic segmentation enables transportation system attributes and associated data to be stored in separate tables and merged when a specific query requires a particular set of data to be considered. A major benefit of dynamic segmentation is that individual tables can be more easily updated when attributes, performance characteristics, or usage patterns change over time. Applications of a progressive geographic database referencing system in transportation planning are vast. Summaries of system condition and performance can be made, and analyses of specific portions of a road system are facilitated.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This report evaluates the use of remotely sensed images in implementing the Iowa DOT LRS that is currently in the stages of system architecture. The Iowa Department of Transportation is investing a significant amount of time and resources into creation of a linear referencing system (LRS). A significant portion of the effort in implementing the system will be creation of a datum, which includes geographically locating anchor points and then measuring anchor section distances between those anchor points. Currently, system architecture and evaluation of different data collection methods to establish the LRS datum is being performed for the DOT by an outside consulting team.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The Data Processing Department of ISHC has developed coding forms to be used for the data to be entered into the program. The Highway Planning and Programming and the Design Departments are responsible for coding and submitting the necessary data forms to Data Processing for the noise prediction on the highway sections.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Advances in communication, navigation and imaging technologies are expected to fundamentally change methods currently used to collect data. Electronic data interchange strategies will also minimize data handling and automatically update files at the point of capture. This report summarizes the outcome of using a multi-camera platform as a method to collect roadway inventory data. It defines basic system requirements as expressed by users, who applied these techniques and examines how the application of the technology met those needs. A sign inventory case study was used to determine the advantages of creating and maintaining the database and provides the capability to monitor performance criteria for a Safety Management System. The project identified at least 75 percent of the data elements needed for a sign inventory can be gathered by viewing a high resolution image.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The object of this report is to present the data and conclusions drawn from the analysis of the origin and destination information. Comments on the advisability and correctness of the approach used by Iowa are encouraged.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This is the final Report to the Iowa DOT Offices of Construction and the Highway Division for the calendar year 1999 research project entitled - Continuation of Benchmarking Project: Phase IV. This project continues efforts started in 1995 with the development of a performance measurement system. The performance measurements were used to identify areas that required improvement and process improvement teams (PITs) were launched to make recommendations for improvement. This report provides a brief historical background, documents Benchmark Steering Team Activities, describes measurement activities including the employee survey and collection of non-survey data. Then a retrospective of past PIT activities is given, which sets the stage for the substantial increase in PIT activity that occurred during the winter of 1998/9. Finally, the report closes with suggestions for future directions in Benchmarking Activity.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The benefits of pavement management system when fully implemented are well known and the history of successful implementation is rich. Implementation occurs, for purposes of this paper, when the pavement management system is the critical component for making pavement decisions. This paper addresses the issues that act as barriers to full implementation of pavement management systems. Institutional barriers, not technical and financial barriers, are more commonly responsible for a pavement management systems falling short of full implementation. The paper groups these institutional issues into a general taxonomy. In general, more effort needs to be put forth by highway agencies to overcome institutional issues. Most agencies approach pavement management as a technical process, but more commonly, institutional issues become more problematic and thus require more attention paid to institutional issues. The paper concludes by summarizing the implementation process being taken by the Iowa Department of Transportation. The process was designed to overcome institutional barriers and facilitate the complete and full implementation of their pavement management system.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A three-step approach was used to do the study of the Mormon Trail. These involved research, field data collection and evaluation of the project corridors. Step one involved research on the location of the Trail, associated sites and the historic land use near the Trail between 1846 and 1868. The next step involved defining roads to be inventoried and the actual field survey. Step three involved evaluation of the inventoried corridors. This evaluation procedure was based on the methodology currently used by Iowa DOT to evaluate candidate scenic byway routes but involved different evaluation factors. The numeric results of the two analyses can be directly compared. The results of the field survey and evaluation are shown in detail by county. Inventory and evaluation procedures for historic and cultural byways are discussed in Appendix A.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The objective of the evaluation of the weather forecasting services used by the Iowa Department of Transportation is to ascertain the accuracy of the forecasts given to maintenance personnel and to determine whether the forecasts are useful in the decision-making process and whether the forecasts have potential for improving the level of service. The Iowa Department of Transportation has estimated the average cost of fighting a winter storm to be about $60,000 to $70,000 per hour. This final report is to provide an evaluation report describing the collection of weather data and information associated with the weather forecasting services provided to the Iowa Department of Transportation and its maintenance activities and to determine their impact in winter maintenance decision-making.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A user manual for the GeoMedia software program, along with some discussion of digital orthophotos.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This document briefly summarizes the pavement management activities under the existing Iowa Department of Transportation (DOT) Pavement Management System. The second part of the document provides projected increase in use due to the implementation of the Iowa DOT Pavement Management Optimization System. All estimates of existing time devoted to the Pavement Management System and project increases in time requirements are estimates made by the appropriate Iowa DOT office director or function manager. Included is the new Pavement Management Optimization Structure for the three main offices which will work most closely with the Pavement Management Optimization System (Materials, Design, and Program Management).

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The missions of the research are to assist the Iowa Department of Transortation (Iowa DOT) to: Define pavement management (PM) optimization; Identify the characteristics of PM optimization systems being developed or implemented; Identify specific and achievable objectives for the Iowa DOT pavement management optimization; Evaluate different PM optimization methodologies; Identify a methodology to perform PM optimization that best satisfies the Iowa DOT's objectives; Develop a plan for the implementation of the PM optimization selected. The project is divided into three (3) phases. The first phase has been completed and accomplished the first three missions (identified above). The second phase has been completed and accomplished the next two missions. Phase three will accomplish the last mission.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This report is the product of a first-year research project in the University Transportation Centers Program. This project was carried out by an interdisciplinary research team at The University of Iowa's Public Policy Center. The project developed a computerized system to support decisions on locating facilities that serve rural areas while minimizing transportation costs. The system integrates transportation databases with algorithms that specify efficient locations and allocate demand efficiently to service regions; the results of these algorithms are used interactively by decision makers. The authors developed documentation for the system so that others could apply it to estimate the transportation and route requirements of alternative locations and identify locations that meet certain criteria with the least cost. The system was developed and tested on two transportation-related problems in Iowa, and this report uses these applications to illustrate how the system can be used.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This project supported the planning and conduct of a two-day Iowa Department of Transportation–hosted peer exchange for state agencies that have implemented some or all of the suggested strategies outlined in the Second Strategic Highway Research Program–sponsored project R10, Project Management Strategies for Complex Projects. Presentations were made by participating states, and several opportunities were provided for directed discussion. General themes emerging from the presentations and discussions were identified as follows: To implement improvements in project management processes, agency leadership needs to decide that a new approach to project management is worth pursuing and then dedicate resources to developing a project management plan. The change to formalized project management and five-dimensional project management (5DPM) requires a culture shift in agencies from segmented “silo” processes to collaborative, cooperative processes that make communication and collaboration high priorities. Agencies need trained project managers who are empowered to execute the project management plan, as well as properly trained functional staff. Project management can be centralized or decentralized with equal effect. After an agency’s project management plan and structure are developed, software tools and other resources should be implemented to support the plan and structure. All projects will benefit from enhanced project management, but the project management plan should specify appropriate approaches for several project levels as defined by factors in addition to dollar value. Project management should be included in an agency’s project development manual.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Results from a 13-page BEST Measurement Survey given to Iowa Department of Transportation Employees.