Summary of contracts let by Iowa DOT Office of Contracts in 12 regular and three emergency/special lettings during FY 2003 for construction and maintenance work. It also contains a comparison of quantities and unit contract prices for various items of highway construction work for projects let in fiscal years 2000, 2001, 2002 and 2003.
Resumo:
A summary of the 12 regularly scheduled lettings and three emergency/special lettings held by the Iowa Department of Transportation for construction and maintenance work during the period July 1, 2003, through June 30, 2004.
Resumo:
A summary of the regularly scheduled lettings and emergency/special lettings held by the Iowa Department of Transportation for construction and maintenance work during the period July 1, 2004, through June 30, 2005.
Resumo:
Pursuant to the Code section 307.12(14)the DOT is providing the summary of contracts let from July 1, 2005 to June 20, 2006.
Resumo:
Twelve regularly scheduled lettings and seven emergency/special lettings were held by the Iowa Department of Transportation for construction and maintenance work during the period covered by this report. At these lettings, projects totaling $492,299,871 were approved.
Resumo:
Report of the letting activity of the Iowa Department of Transportation's Office of Contracts required by Iowa Code Section 307.12(15).
Iowa Department of Transportation, Office of Contracts Letting Summary, July 1, 2008 - June 30, 2009
Resumo:
Twelve regularly scheduled lettings and nine emergency/special lettings were held by the Iowa Department of Transportation for construction and maintenance work during the period covered by this report. At these lettings, projects totaling $1,030,584,566 were approved.
Resumo:
Newsletter produced by the Iowa Department of Contract for Iowa Department of Transportation, on civil rights.
Resumo:
Twelve regularly scheduled lettings and three emergency/special lettings were held by the Iowa Department of Transportation for construction and maintenance work during the period covered by this report. At these lettings, projects totally $741,289,234 were approved.
Resumo:
The Iowa DOT takes affirmative action to ensure that Disadvantaged Business Enterprises have the maximum practical opportunity to get Iowa DOT contracts for construction, professional, and technical service. The Iowa DOT also has taken specific steps to ensure there is no discrimination in the awarding and administering of contracts. The department's DBE Program, which has been developed under this policy, is administered by the Office of Contracts.
Resumo:
A review of the Iowa Department of Transportation's field data collection and reporting system has been performed. Included were several systems used by the Office of Construction and Local Jurisdictions. The entire field data collection and reporting systems for asphalt cement concrete (ACC) paving, portland cement concrete (PCC) paving, and PCC structures were streamlined and computerized. The field procedures for materials acceptance were also reviewed. Best practices were identified and a method was developed to prioritize materials so transportation agencies could focus their efforts on high priority materials. Iowa State University researchers facilitated a discussion about Equal Employment Opportunity (EEO) and Affirmative Action (AA) procedures between the Office of Construction field staff and the Office of Contracts. A set of alternative procedures was developed. Later the Office of Contracts considered these alternatives as they developed new procedures that are currently being implemented. The job close-out package was reviewed and two unnecessary procedures were eliminated. Numerous other procedures were reviewed and flowcharted. Several changes have been recommended that will increase efficiency and allow staff time to be devoted to higher priority activities. It is estimated the improvements in ACC paving, PCC paving and structural concrete will by similar to three full time equivalent (FTE) positions to field construction, field materials and Office of Materials. Elimination of EEO interviews will be equivalent to one FTE position. It is estimated that other miscellaneous changes will be equivalent to at least one other FTE person. This is a total five FTEs. These are conservative estimates based on savings that are easily quantified. It is likely that total positive effect is greater when items that are difficult to quantify are considered.
Resumo:
State Agency Audit Report
Resumo:
Other Audit Reports - Special Report
Resumo:
Other Audit Reports
Resumo:
Contracts Accepted by Iowa Department of Transportation