9 resultados para National Transition Council
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Currently, many drivers experience some difficulty in viewing the road ahead of them during times of reduced visibility, such as rain, snow, fog, or the darkness of night- Recent studies done by the National Safety Council provide a detailed contrast between fatal accidents occurring during the day and night. Revealed was that the motor vehicle night death rate (4.41 deaths per 100 million miles driven) was sharply higher than the corresponding death rate during daylight hours (1.21). By providing a delineating system powered by the natural resource of solar power, a constant source of visibility may be maintained throughout the evening. Along with providing enough light to trace the outline of the road, other major goals defined in producing this delineator system are as follows: 1. A strong and durable design that would protect the internal components and survive extreme weather conditions. 2. A low maintenance system where components need few repairs or replacements. 3. A design which makes all components accessible in the event that maintenance is needed, but also prevents vandalism. 4. A design that provides greater visibility to drivers and will not harm a vehicle or its passengers in the event of a collision. This solar powered highway delineator consists of an adjustable solar array, a light fixture, and a standard delineator pole. The solar array houses and protects the solar panels, and can be easily adjusted to obtain a maximum amount of sunlight. The light fixture primarily houses the battery, the circuit and the light assembly. Both components allow for easy accessibility and reduce vandalism using internal connections for bolts and wires. The delineator mounting pole is designed to extensively deform in the event of a collision, therefore reducing any harm caused to the vehicle and/or the passengers. The cost of a single prototype to be produced is approximately $70.00 excluding labor costs. However, these material and labor costs will be greatly reduced if a large number of delineators are produced. It is recommended that the Iowa Department of Transportation take full advantage of the research and development put into this delineator design. The principles used in creating this delineator can be used to provide an outline for drivers to follow, or on a larger scale, provide actual roadway lighting in areas where it was never before possible or economically feasible. In either event, the number of fatal accidents will be decreased due to the improved driver visibility in the evening.
Resumo:
Replication Template for Improving Transition Outcomes Council Bluffs Youth Connections E-Mentoring Prototype. This concise document will help your community team implement and plan for sustaining e-mentoring.
Resumo:
Promotional article on a presentation at the Parent Educator Connector conference.
Resumo:
General information on the Council Bluffs Youth Connections prototype under Improving Transition Outcomes with Iowa Vocational Rehabilitation Services.
Resumo:
Information gleaned from the focus groups and individual interviews with educators, youth and parents.
Resumo:
Information on the Council Bluffs Youth Connections, Henry County Transition Partners, and CASE (Career And Self Awareness) community demonstration prototypes.
Resumo:
The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.
Resumo:
This Tier 2 Environmental Assessment (EA) presents the results of studies and analyses conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility1 This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480). More information about the tiering process is found below under Project Background. • Section 1 provides background information on the Project and discusses the relationship between the earlier Tier 1 EIS and this Tier 2 EA. It also discusses the proposed action and the area studied, the purpose of the Project, and the need for the Project based on transportation problems that currently exist or are expected in the future. • Section 2, Alternatives, identifies the range of alternatives considered for Segment 3 to address the transportation problems identified in Section 1. It also identifies the alternatives retained for further study in this EA and the preferred Segment 3 alternative. • Section 3, Affected Environment and Environmental Consequences, describes the general environment for each resource affected by the proposed improvements. It also describes the potential environmental impacts of the Segment 3 Project and methods to avoid, minimize, and mitigate impacts. • Section 4, Disposition, lists the agencies and organizations that will receive copies of this EA and the locations at which this EA will be available for public review. • Section 5, Comments and Coordination, summarizes the agency coordination and public involvement efforts in conjunction with the Segment 3 Project. • Section 6, Conclusion and Recommendation, summarizes resource impacts. • Section 7, References, lists the sources cited in this EA. For Segment 3, the Federal Highway Administration (FHWA) and Iowa Department of Transportation (Iowa DOT) determined that an EA is the appropriate level of Tier 2 study to comply with the National Environmental Policy Act (NEPA) requirements. The primary purpose of an EA is to clearly establish the significance of a project’s environmental impacts. That analysis is included in this document.
Resumo:
Plagued for nearly a century by the perennial flooding of Indian Creek, the City begins construction on a massive channelization project designed to confine the creek to its banks. Funded largely through a grant from the recently established Public Works Administration (PWA), the Indian Creek Channel, upon its completion two years later, would become the largest PWA undertaking in the State of Iowa. Though it did not completely end flooding in Council Bluffs, construction of the Indian Creek Channel did substantially reduce both the number and severity of the city's subsequent floods. It also profoundly impacted the residential and commercial development of Council Bluffs, as well as the city's sanitary conditions. The effects of the Indian Creek channelization, both practical and historical, are still realized today. In 2009, plans for a City road and bridge construction project at the intersection of North Broadway Street and Kanesville Boulevard proposed to replace a 221-foot-long segment of the Indian Creek Channel with a concrete box culvert. In compliance with the National Historic Preservation Act, a cultural resources study was conducted at the proposed construction site, the findings of which concluded that the historic character of the Indian Creek Channel would be compromised by the impending construction. As a means of mitigating these damages, an agreement was reached among the City, the Iowa State Historic Preservation Office, and the Federal Highway Administration that resulted in detailed research and documentation of the historical significance of the Indian Creek Channel. The findings of that study are summarized in this publication.