388 resultados para Microsoft, SharePoint 2013, SharePoint Server, SharePoint Designer

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Department of Transportation spent $344,521 of the Fiscal Year 2013 RUTF/PRF budget reversion in FY 2013 for desktop and server software, information technology professional services and computer equipment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is an ongoing discussion about moving toward performance-based specifications for concrete pavements. This document seeks to move the discussion forward by outlining the needs and the challenges, and proposing some immediate actions. However, this approach may increase risk for all parties until performance requirements are agreed upon and, more importantly, how the requirements can be measured. A fundamental issue behind pavement construction activities is that the owner/designer needs to be assured that the concrete in place will survive for the intended period (assuming there are no changes in the environment or loading) and, therefore, that full payment should be made. At the same time, each party along the supply chain needs to be assured that the material being supplied to them is able to meet the required performance, as is the product/system they are delivering. The focus of this document is a discussion of the issues behind this need, and the technologies that are available, or still needed, to meet this need, particularly from the point of view of potential durability

Relevância:

20.00% 20.00%

Publicador:

Resumo:

CJJP takes a look at the forecast of inmates population in the state of Iowa in a ten year period. Information was produced by Division of Criminal and Juvenile Justice Planning. This report was made possible partially through funding from the U.S. Department of Justice, Bureau of Justice Statistics and its program for State Statistical Analysis Centers. Points of view or opinions expressed in this report are those of the Division of Criminal and Juvenile Justice Planning (CJJP), and do not necessarily reflect official positions of the U.S. Department of Justice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa’s Statewide Transportation Improvement Program (STIP) has been developed in conformance with the guidelines prescribed by 23 USC. The STIP is generated to provide the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) a listing of all projects that are candidates for federal aid from the FHWA and FTA for four federal fiscal years (FFY). Preceding the listings of federal-aid candidates are general comments concerning Iowa’s public participation process for selection of federal-aid projects and the basis for funding the proposed projects. Documents evidencing the Iowa Department of Transportation’s (Iowa DOT) authority to act concerning matters related to transportation, federal-aid expenditures and approvals of Metropolitan Planning Organizations’ (MPOs) Transportation Improvements Programs (TIPs) have been provided in past STIP’s and can be provided again upon request. The projects identified within the 2010-2013 STIP are divided into two groups. Projects proposed for funding from FHWA programs are shown first. FTA programs follow. Maps are included that identify locations of Iowa DOT District Planners, Metropolitan Planning Organizations (MPOs), Regional Planning affiliations (RPAs), and transit systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A lot of things came together to make fiscal year 2013 truly exceptional for the Iowa Lottery, and allowing us to fulfill winners’ dreams and raise record proceeds to make a difference in Iowans’ lives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Program and Summary of Budget by Governor Terry Branstad

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Governor Branstad's budget reccommendations for the fiscal years 2012 and 2013. NOTE: this is a very large file and may take a while for it to download.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Governor Terry E. Branstad's FY2013 budget recommendations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document summarizes Governor Terry E. Branstad's Program and Budget Recommendations for the Second Session of the Iowa 84th General Assembly

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a multiyear federal transportation authorization bill in place. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended nine times because a new authorization has not yet been enacted. The current extension will expire June 30, 2012.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Transportation Commission (Commission) and the Iowa Department of Transportation (DOT) develop Iowa’s Five Year Highway Program (Program) to inform you of planned investments in our state’s primary and interstate highway system. This brochure summarizes the FY 2013-2017 Program. $2.6 billion is forecast for highway right of way and construction. The Program is updated and approved in June of each year. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a multiyear federal transportation authorization bill in place. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended nine times because a new authorization has not yet been enacted. The current extension will expire June 30, 2012.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa Utilities Board Fiscal Year 2008 Regulatory Plan Pursuant to Executive Order Nine.