3 resultados para Methane Flux Control in Ocean Margin Sediments

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this study was to develop guidelines for use of the Iowa Vanes technique for sediment control in bridge waterways. Iowa Vanes are small flow-training structures (foils) designed to modify the near-bed flow pattern and redistribute flow and sediment transport within the channel cross section. The structures are installed at an angleof attack of 15 - 25' with the flow, and their initial height is 0.2 - 0.5 times water depth at design stage. The vanes function by generating secondary circulation in the flow. The circulation alters magnitude and direction of the bed shear stress and causes a reduction in velocity and sediment transport in the vane controlled area. As a result, the river bed aggrades in the vane controlled area and degrades outside. This report summarizes the basic theory, describes results of laboratory and field tests, and presents the resulting design procedure. Design graphs have been developed based on the theory. The graphs are entered with basic flow variables and desired bed topography. The output is vane layout and design. The procedure is illustrated with two numerical examples prepared with data that are typical for many rivers in Iowa and the midwest. The report also discusses vane material. In most applications, the vane height will be between 30% and 50% of bankfull flow depth and the vane length will be two to three times vane height. The vanes will be placed in arrays along the bank of the river. Each array will contain two or more vanes. The vanes in an array will be spaced laterally a distance of two to three times vane height. The streamwise spacing between the arrays will be 15 to 30 times vane height, and the vane-to-bank distance will be three to four times vane height. The study also show that the first (most upstream) array in the vane system must be located a distance of at least three array spacings upstream from the bridge, and there must be at least three arrays in the system for it to be effective at and downstream from the third array.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The large concrete placements at the Burlington Bridge were expected to cause great temperature differentials within the individual placements. In an attempt to reduce cracking due to the large temperature differentials, the Iowa Department of Transportation required that contractors continuously monitor the temperatures and temperature differentials in the concrete placement to assure that the temperature differentials did not exceed 35 deg F. It was felt that if temperature differentials remained below 35 deg F, cracking would be minimized. The following is a summary of the background of the project, and what occurred during individual concrete placements. The following conclusions were drawn: 1) Side temperatures are cooler and more greatly affected by ambient air temperatures; 2) When the 35 deg F limit was exceeded, it was almost exclusively the center to side differential; 3) The top temperature increases substantially when a new pour is placed; 4) The use of ice and different cement types did seem to affect the overall temperature gain and the amount of time taken for any one placement to reach a peak, but did not necessarily prevent the differentials from exceeding the 35 deg F limit, nor prevent cracking in any placement; and 5) Larger placements have a greater tendency to exceed the differential limit.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pavement and shoulder edge drop-offs commonly occur in work zones as the result of overlays, pavement replacement, or shoulder construction. The depth of these elevation differentials can vary from approximately one inch when a flexible pavement overlay is applied to several feet where major reconstruction is undertaken. The potential hazards associated with pavement edge differentials depend on several factors including depth of the drop-off, shape of the pavement edge, distance from traveled way, vehicle speed, traffic mix, volume, and other factors. This research was undertaken to review current practices in other states for temporary traffic control strategies addressing lane edge differentials and to analyze crash data and resultant litigation related to edge drop-offs. An objective was to identify cost-effective practices that would minimize the potential for and impacts of edge drop crashes in work zones. Considerable variation in addressing temporary traffic control in work zones with edge drop-off exposure was found among the states surveyed. Crashes related to pavement edge drop-offs in work zones do not commonly occur in the state of Iowa, but some have resulted in significant tort claims and settlements. The use of benefit/cost analysis may provide guidance in selection of an appropriate mitigation and protection of edge drop-off conditions. Development and adoption of guidelines for design of appropriate traffic control for work zones that include edge drop-off exposure, particularly identifying effective use of temporary barrier rail, may be beneficial in Iowa.