3 resultados para Manchester (N.H.)

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

10.00% 10.00%

Publicador:

Resumo:

In recent years, thin whitetopping has evolved as a viable rehabilitation technique for deteriorated asphalt cement concrete (ACC) pavements. Numerous projects have been constructed and tested; these projects allow researchers to identify the important elements contributing to the projects’ successes. These elements include surface preparation, overlay thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. Although the main factors affecting thin whitetopping performance have been identified by previous research, questions still existed as to the optimum design incorporating these variables. The objective of this research is to investigate the interaction between these variables over time. Laboratory testing and field-testing were planned in order to accomplish the research objective. Laboratory testing involved shear testing of the bond between the portland cement concrete (PCC) overlay and the ACC surface. Field-testing involved falling weight deflectometer deflection responses, measurement of joint faulting and joint opening, and visual distress surveys on the 9.6-mile project. The project was located on Iowa Highway 13 extending north from the city of Manchester, Iowa, to Iowa Highway 3 in Delaware County. Variables investigated included ACC surface preparation, PCC thickness, synthetic fiber reinforcement usage, and joint spacing. This report documents the planning, equipment selection, construction, field changes, and construction concerns of the project built in 2002. The data from this research could be combined with historical data to develop a design specification for the construction of thin, unbonded overlays.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In recent years, thin whitetopping has evolved as a viable rehabilitation technique for deteriorated asphalt cement concrete (ACC) pavements. Numerous projects have been constructed and tested, allowing researchers to identify the important elements contributing to the projects’ successes. These elements include surface preparation, overlay thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. Although the main factors affecting thin whitetopping performance have been identified by previous research, questions still existed as to the optimum design incorporating these variables. The objective of this research is to investigate the interaction between these variables over time. Laboratory testing and field testing were conducted to achieve the research objectives. Laboratory testing involved shear testing of the bond between the portland cement concrete (PCC) overlay and the ACC surface. Field testing involved falling weight deflectometer deflection responses, measurement of joint faulting and joint opening, and visual distress surveys on the 9.6-mile project. The project was located on Iowa Highway 13 extending north from the city of Manchester, Iowa, to Iowa Highway 3 in Delaware County. Variables investigated include ACC surface preparation, PCC thickness, slab size, synthetic fiber reinforcement usage, and joint spacing. This report documents the planning, construction, and performance of each variable in the time period from summer 2002 through spring 2006. The project has performed well with only minor distress identification since its construction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Sand Creek is the most significant recreational fishery in Delaware County because of its location to Manchester and Lake Delhi. It is a feeder stream for game fish to the main stem of the Maquoketa River which is limited by the dams at Manchester and Lake Delhi. Sand Creek encompasses 16,045 acres and is dominated by row crop agriculture. It is being impacted by sediment, nutrients and E coli bacteria. Sand Creek will be a good example for habitat impaired watershed. The purpose of this project is to decrease the amount of sediment and nutrients reaching Sand Creek and to increase the habitat in Sand Creek to make it a better spawning and growing area for the fish and the food chain for the fish. The objectives of this project are to reduce sediment delivery by 40%, to improve in-stream habitat on 40% of identified critical areas and implement an information/education program. The project will install 3,800 acres of new no-till planting, 6 water and sediment control basins, 4,000 feet of terraces, 20,000 feet of improved or new waterways, 3,200 feet of streambank/ habitat enhancement, 4,500 feet of livestock exclusion fencing and 6 acres of wetlands.