12 resultados para Make or Buy Decision

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

30.00% 30.00%

Publicador:

Resumo:

You have a six-month open enrollment period when you are enrolled in Medicare Part B for the first time at age 65 or older. The six-month period begins the date your Medicare Part B begins. During your open enrollment period: • You cannot be turned down for any plan (A-L) being sold in Iowa. • You cannot be charged a higher premium based on your health. • You will not have a waiting period before benefits are paid for pre-existing health conditions IF you had previous health insurance coverage, AND you apply within 63 days of the end of previous health insurance, AND you were covered for at least 6 months under that health plan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Although there are many ways to cut you water heating bills, the all fall into two broad categories: reducing the amount of hot water you use and making your water heating system more efficient. Fortunately, there are several strategies that can help you consume less energy and save money - and still meet you hot water needs without sacrificing comfort or practicality. The booklet was designed to answer common questions about hot water systems and to provide you with the information necessary to make informed decision about a wide variety of topics, ranging from repairing hot water faucet leaks an insulation water supply pipes to installing low-flow shower heads and tuning you your existing water heather. You'll also find details on what to consider when it's time to go comparison shopping for a new water heater-including an evaluation of the alternatives to the common gas or electric storage tank unit that's found in the majority of homes in Iowa and across the country.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project combined various datasets, existing and created for this project, into an Interactive Mapping Service (IMS) for use by Iowa DOT personnel, county planning and zoning departments and the public in order to make more informed decisions regarding aggregate sources and future access to them. Iowa DOT Technical Advisory Committee meetings were held, along with public forum presentations, in order to understand better the social, ecological and economic limitations to extracting aggregate. The information needed by potential users was conveyed and integrated into a single informational source, the Aggregate Planning IMS.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Expanded abstract: Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some new best practices for field staff to assist in the inventory, inspection and maintenance of assets along the roadway. The team has spent the past year working through the complexities of identifying the most appropriate tablet hardware for field data collection. A small scale deployment of tablets occurred in spring of 2013 to collect several safety related assets (culverts, signs, guardrail, and incidents). Data can be collected in disconnected or connected modes and there is an associated desktop environment where data can be viewed and queried after being synced into the master database. The development of a deployment plan and related workflow processes are underway; which will eventually feed information into IA DOTs larger asset management system and make the information available for decision making. The team is also working with the IA DOT Design Office on Computer Aided Drafting (CAD) data processing and the IA DOT Construction office with a new digital As-Built plan process to leverage the complete data life-cycle so information can be developed once and leveraged by the Maintenance staff farther along in the process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Researchers should continuously ask how to improve the models we rely on to make financial decisions in terms of the planning, design, construction, and maintenance of roadways. This project presents an alternative tool that will supplement local decision making but maintain a full appreciation of the complexity and sophistication of today’s regional model and local traffic impact study methodologies. This alternative method is tailored to the desires of local agencies, which requested a better, faster, and easier way to evaluate land uses and their impact on future traffic demands at the sub-area or project corridor levels. A particular emphasis was placed on scenario planning for currently undeveloped areas. The scenario planning tool was developed using actual land use and roadway information for the communities of Johnston and West Des Moines, Iowa. Both communities used the output from this process to make regular decisions regarding infrastructure investment, design, and land use planning. The City of Johnston case study included forecasting future traffic for the western portion of the city within a 2,600-acre area, which included 42 intersections. The City of West Des Moines case study included forecasting future traffic for the city’s western growth area covering over 30,000 acres and 331 intersections. Both studies included forecasting a.m. and p.m. peak-hour traffic volumes based upon a variety of different land use scenarios. The tool developed took goegraphic information system (GIS)-based parcel and roadway information, converted the data into a graphical spreadsheet tool, allowed the user to conduct trip generation, distribution, and assignment, and then to automatically convert the data into a Synchro roadway network which allows for capacity analysis and visualization. The operational delay outputs were converted back into a GIS thematic format for contrast and further scenario planning. This project has laid the groundwork for improving both planning and civil transportation decision making at the sub-regional, super-project level.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Address sustainability in all efforts. Sustainability should be at the core of all levels of homeland security and emergency management effort in Iowa. Capabilities need to be built for the long term, and without a sustainability plan in place, projects can quickly deplete uncertain levels of funding. Utilize an all-hazards methodology. Developing capabilities that are effective during a variety of disaster and emergency scenarios represents sound planning and resource management. Enhance capabilities through joint planning, training and exercise. Effective capabilities developed through coordinated planning efforts and an ongoing joint training and exercising program to ensure sustainment of prepared response. Utilize a collaborative approach to build capability. We will utilize whatever partnerships are necessary to build capability in the most effective manner possible. Regional partnerships have been, and will continue to be, in the forefront of the State of Iowa’s efforts to build and enhance capability. Enhance statewide capabilities. Whenever possible, we will identify and augment existing resources to provide statewide capability during a disaster or terrorist attack. Awareness, outreach and education. Open communication is critical to the success of any initiative. All projects implemented will have awareness, education and outreach components to ensure that all stakeholders are informed as to their responsibilities, capabilities and access. Information sharing and a common operating picture. The timely exchange of critical/actionable information is imperative to the success of every operation. The identification of a common operating picture allows decision makers to make informed decisions based on a unified understanding of the events around them.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

When you are faced with a difficult decision, it’s not unusual to feel confused, frustrated, and perhaps a little frightened because you are not sure what to expect or where to turn for answers. The purpose of this handbook is to assist you in making an informed choice about your pregnancy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Address sustainability in all efforts. Sustainability should be at the core of all levels of homeland security and emergency management effort in Iowa. Capabilities need to be built for the long term, and without a sustainability plan in place, projects can quickly deplete uncertain levels of funding. Utilize an all-hazards methodology. Developing capabilities that are effective during a variety of disaster and emergency scenarios represents sound planning and resource management. Enhance capabilities through joint planning, training and exercise. Effective capabilities developed through coordinated planning efforts and an ongoing joint training and exercising program to ensure substantiate of prepared response. Utilize a collaborative approach to build capability. We will utilize whatever partnerships are necessary to build capability in the most effective manner possible. Regional partnerships have been, and will continue to be, in the forefront of the State of Iowa’s efforts to build and enhance capability. Enhance statewide capabilities. Whenever possible, we will identify and augment existing resources to provide statewide capability during a disaster or terrorist attack. Awareness, outreach and education. Open communication is critical to the success of any initiative. All projects implemented will have awareness, education and outreach components to ensure that all stakeholders are informed as to their responsibilities, capabilities and access. Information sharing and a common operating picture. The timely exchange of critical/actionable information is imperative to the success of every operation. The identification of a common operating picture allows decision makers to make informed decisions based on a unified understanding of the events around them.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Most local agencies in Iowa currently make their pavement treatment decisions based on their limited experience due primarily to lack of a systematic decision-making framework and a decision-aid tool. The lack of objective condition assessment data of agency pavements also contributes to this problem. This study developed a systematic pavement treatment selection framework for local agencies to assist them in selecting the most appropriate treatment and to help justify their maintenance and rehabilitation decisions. The framework is based on an extensive literature review of the various pavement treatment techniques in terms of their technical applicability and limitations, meaningful practices of neighboring states, and the results of a survey of local agencies. The treatment selection framework involves three different steps: pavement condition assessment, selection of technically feasible treatments using decision trees, and selection of the most appropriate treatment considering the return-on-investment (ROI) and other non-economic factors. An Excel-based spreadsheet tool that automates the treatment selection framework was also developed, along with a standalone user guide for the tool. The Pavement Treatment Selection Tool (PTST) for Local Agencies allows users to enter the severity and extent levels of existing distresses and then, recommends a set of technically feasible treatments. The tool also evaluates the ROI of each feasible treatment and, if necessary, it can also evaluate the non-economic value of each treatment option to help determine the most appropriate treatment for the pavement. It is expected that the framework and tool will help local agencies improve their pavement asset management practices significantly and make better economic and defensible decisions on pavement treatment selection.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Adverse weather conditions dramatically affect the nation’s surface transportation system. The development of a prototype winter Maintenance Decision Support System (MDSS) is part of the Federal Highway Administration’s effort to produce a prototype tool for decision support to winter road maintenance managers to help make the highways safer for the traveling public. The MDSS is based on leading diagnostic and prognostic weather research capabilities and road condition algorithms, which are being developed at national research centers. In 2003, the Iowa Department of Transportation was chosen as a field test bed for the continuing development of this important research program. The Center for Transportation Research and Education assisted the Iowa Department of Transportation by collecting and analyzing surface condition data. The Federal Highway Administration also selected five national research centers to participate in the development of the prototype MDSS. It is anticipated that components of the prototype MDSS system developed by this project will ultimately be deployed by road operating agencies, including state departments of transportation, and generally supplied by private vendors.