5 resultados para Long incubation period
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
The attached plan builds upon work done over the last decade. The first plan developed after the creation of the Division of Criminal and Juvenile Justice Planning in 1986 was issued in 1990 and annually updated through 1994. Since 1992, the CJJPAC has been required to coordinate their planning activities with those of the Iowa Juvenile Justice Advisory Council (JJAC). In 1995, these two councils developed a new plan consisting of a set of long-range justice system goals to assist policy makers and justice system practitioners as they plan and operate the justice system through the next twenty years. The statutory mandate for such long-range planning required the identification of goals specific enough to provide guidance, but broad enough to be of relevance over a long period of time. The long-range goals adopted by these councils in 1995 covered a wide variety of topics and offered a framework within which current practices could be defined and assessed. Collectively, these long-range goals were meant to provide a single source of direction to the complex assortment of practitioners and policymakers whose individual concerns and decisions collectively define the nature and effectiveness of Iowa’s justice system. The twenty-year goals established in 1995 were reviewed by the councils in 2000 to assess their current relevance. It was determined that, with a few revisions, the goals established in 1995 should be restated in 2000 with a renewed emphasis on their long-range status. This plan builds upon those issued in 1995 and 2000, continuing much of the emphasis of plans, with some new directions charted as appropriate.
Resumo:
Eighty-five of 99 Iowa counties were declared Presidential Disaster Areas for Public Assistance and/orIndividual Assistance as a result of the tornadoes, storms, and floods over the incident period May 25 through August 13, 2008. Response dominated the state’s attention for weeks, with a transition to recovery as the local situations warranted. The widespread damage and severity of the impact on Iowans and their communities required a statewide effort to continue moving forward despite being surrounded by adversity. By all accounts, it will require years for the state to recover from these disasters. With an eye toward the future, recovery is underway across Iowa. As part of the Rebuild Iowa efforts, the Long Term Recovery Planning Task Force was charged with responsibilities somewhat different from other topical Task Force assignments. Rather than assess damage and report on how the state might address immediate needs, the Long Term Recovery Planning Task Force is directed to discuss and discern the best approach to the lengthy recovery process. Certainly, the Governor and Lieutenant Governor expect the task to be difficult; when planning around so many critical issues and overwhelming needs, it is challenging to think to the future, rather than to rise to the current day’s needs.
Resumo:
Eighty-five of 99 Iowa counties were declared Presidential Disaster Areas for Public Assistance and/orIndividual Assistance as a result of the tornadoes, storms, and floods over the incident period May 25 through August 13, 2008. Response dominated the state’s attention for weeks, with a transition to recovery as the local situations warranted. The widespread damage and severity of the impact on Iowans and their communities required a statewide effort to continue moving forward despite being surrounded by adversity. By all accounts, it will require years for the state to recover from these disasters. With an eye toward the future, recovery is underway across Iowa. As part of the Rebuild Iowa efforts, the Long Term Recovery Planning Task Force was charged with responsibilities somewhat different from other topical Task Force assignments. Rather than assess damage and report on how the state might address immediate needs, the Long Term Recovery Planning Task Force is directed to discuss and discern the best approach to the lengthy recovery process. Certainly, the Governor and Lieutenant Governor expect the task to be difficult; when planning around so many critical issues and overwhelming needs, it is challenging to think to the future, rather than to rise to the current day’s needs.
Resumo:
There is an ongoing discussion about moving toward performance-based specifications for concrete pavements. This document seeks to move the discussion forward by outlining the needs and the challenges, and proposing some immediate actions. However, this approach may increase risk for all parties until performance requirements are agreed upon and, more importantly, how the requirements can be measured. A fundamental issue behind pavement construction activities is that the owner/designer needs to be assured that the concrete in place will survive for the intended period (assuming there are no changes in the environment or loading) and, therefore, that full payment should be made. At the same time, each party along the supply chain needs to be assured that the material being supplied to them is able to meet the required performance, as is the product/system they are delivering. The focus of this document is a discussion of the issues behind this need, and the technologies that are available, or still needed, to meet this need, particularly from the point of view of potential durability
Resumo:
The current study was initiated to quantify the stresses induced in critical details on the reinforcing jacket and the tower itself through the use of field instrumentation, load testing, and long-term monitoring. Strain gages were installed on the both the tower and the reinforcing jacket. Additional strain gages were installed on two anchor rods. Tests were conducted with and without the reinforcing jacket installed. Data were collected from all strain gages during static load testing and were used to study the stress distribution of the tower caused by known loads, both with and without the reinforcing jacket. The tower was tested dynamically by first applying a static load, and then quickly releasing the load causing the tower to vibrate freely. Furthermore, the tower was monitored over a period of over 1 year to obtain stress range histograms at the critical details to be used for a fatigue evaluation. Also during the long-term monitoring, triggered time-history data were recorded to study the wind loading phenomena that excite the tower.