39 resultados para Land titles--Registration and transfer--Massachusetts
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
LEGISLATIVE STUDY – The 83rd General Assembly of the Iowa Legislature, in Senate File 2273, directed the Iowa Department of Transportation (DOT) to conduct a study of how to implement a uniform statewide system to allow for electronic transactions for the registration and titling of motor vehicles. PARTICIPANTS IN STUDY – As directed by Senate File 2273, the DOT formed a working group to conduct the study that included representatives from the Consumer Protection Division of the Office of the Attorney General, the Department of Public Safety, the Department of Revenue, the Iowa State County Treasurer’s Association, the Iowa Automobile Dealers Association, and the Iowa Independent Automobile Dealers Association. CONDUCT OF THE STUDY – The working group met eight times between June 17, 2010, and October 1, 2010. The group discussed the costs and benefits of electronic titling from the perspectives of new and used motor vehicle dealers, county treasurers, the DOT, lending institutions, consumers and consumer protection, and law enforcement. Security concerns, legislative implications, and implementation timelines were also considered. In the course of the meetings the group: 1. Reviewed the specific goals of S.F. 2273, and viewed a demonstration of Iowa’s current vehicle registration and titling system so participants that were not users of the system could gain an understanding of its current functionality and capabilities. 2. Reviewed the results of a survey of county treasurers conducted by the DOT to determine the extent to which county treasurers had processing backlogs and the extent to which county treasurers limited the number of dealer registration and titling transactions that they would process in a single day and while the dealer waited. Only eight reported placing a limit on the number of dealer transactions that would be processed while the dealer waited (with the number ranging from one to four), and only 11 reported a backlog in processing registration and titling transactions as of June 11, 2010, with most backlogs being reported in the range of one to three days. 3. Conducted conference calls with representatives of the American Association of Motor Vehicle Administrators (AAMVA) and representatives of three states -- Kansas, which has an electronic lien and titling (ELT) program, and Wisconsin and Florida, each of which have both an ELT program and an electronic registration and titling (ERT) program – to assess current and best practices for electronic transactions. In addition, the DOT (through AAMVA) submitted a survey to all U.S. jurisdictions to determine how, if at all, other states implemented electronic transactions for the registration and titling of motor vehicles. Twenty-eight states responded to the survey; of the 28 states that responded, only 13 allowed liens to be added or released electronically, and only five indicated allowing applications for registration and titling to be submitted electronically. DOT staff also heard a presentation from South Dakota on its ERT system at an AAMVA regional meeting. ELT information that emerged suggests a multi-vendor approach, in which vendors that meet state specifications for participation are authorized to interface with the state’s system to serve as a portal between lenders and the state system, will facilitate electronic lien releases and additions by offering lenders more choices and the opportunity to use the same vendor in multiple states. The ERT information that emerged indicates a multi-interface approach that offers an interface with existing dealer management software (DMS) systems and through a separate internet site will facilitate ERT by offering access that meets a variety of business needs and models. In both instances, information that emerged indicates that, in the long-term, adoption rates are positively affected by making participation above a certain minimum threshold mandatory. 4. To assess and compare functions or services that might be offered by or through a vendor, the group heard presentations from vendors that offer products or services that facilitate some aspect of ELT or ERT. 5. To assess the concerns, needs and interest of Iowa motor vehicle dealers, the group surveyed dealers to assess registration and titling difficulties experienced by dealers, the types of DMS systems (if any) used by dealers, and the dealers’ interest and preference in using an electronic interface to submit applications for registration and titling. Overall, 40% of the dealers that responded indicated interest and 57% indicated no interest, but interest was pronounced among new car dealers (75% were interested) and dealers with a high number of monthly transactions (85% of dealers averaging more than 50 sales per month were interested). The majority of dealers responding to the dealer survey ranked delays in processing and problems with daily limits on transaction as ―minor difficulty or ―no difficulty. RECOMMENDATIONS -- At the conclusion of the meetings, the working group discussed possible approaches for implementation of electronic transactions in Iowa and reached a consensus that a phased implementation of electronic titling that addressed first electronic lien and title transactions (ELT) and electronic fund transfers (EFT), and then electronic applications for registration and titling (ERT) is recommended. The recommendation of a phased implementation is based upon recognition that aspects of ELT and EFT are foundational to ERT, and that ELT and EFT solutions are more readily and easily attained than the ERT solution, which will take longer and be somewhat more difficult to develop and will require federal approval of an electronic odometer statement to fully implement. ELT – A multi-vendor approach is proposed for ELT. No direct costs to the state, counties, consumers, or dealers are anticipated under this approach. The vendor charges participating lenders user or transaction fees for the service, and it appears the lenders typically absorb those costs due to the savings offered by ELT. Existing staff can complete the programming necessary to interface the state system with vendors’ systems. The estimated time to implement ELT is six to nine months. Mandatory participation is not recommended initially, but should be considered after ELT has been implemented and a suitable number of vendors have enrolled to provide a fair assessment of participation rates and opportunities. EFT – A previous attempt to implement ELT and EFT was terminated due to concern that it would negatively impact county revenues by reducing interest income earned on state funds collected by the county and held until the monthly transfer to the state. To avoid that problem in this implementation, the EFT solution should remain revenue neutral to the counties, by allowing fees submitted by EFT to be immediately directed to the proper county account. Because ARTS was designed and has the capacity to accommodate EFT, a vendor is not needed to implement EFT. The estimated time to implement EFT is six to nine months. It is expected that EFT development will overlap ELT development. ERT – ERT itself must be developed in phases. It will not be possible to quickly implement a fully functioning, paperless ERT system, because federal law requires that transfer of title be accompanied by a written odometer statement unless approval for an alternate electronic statement is granted by the National Highway Traffic Safety Administration (NHTSA). It is expected that it will take as much as a year or more to obtain NHTSA approval, and that NHTSA approval will require design of a system that requires the seller to electronically confirm the seller’s identity, make the required disclosure to the buyer, and then transfer the disclosure to the buyer, who must also electronically confirm the buyer’s identity and electronically review and accept the disclosure to complete and submit the transaction. Given the time that it will take to develop and gain approval for this solution, initial ERT implementation will focus on completing and submitting applications and issuing registration applied for cards electronically, with the understanding that this process will still require submission of paper documents until an electronic odometer solution is developed. Because continued submission of paper documents undermines the efficiencies sought, ―full‖ ERT – that is, all documents necessary for registration and titling should be capable of approval and/or acceptance by all parties, and should be capable of submission without transmittal or delivery of duplicate paper documents .– should remain the ultimate goal. ERT is not recommended as a means to eliminate review and approval of registration and titling transactions by the county treasurers, or to place registration and titling approval in the hands of the dealers, as county treasurers perform an important role in deterring fraud and promoting accuracy by determining the genuineness and regularity of each application. Authorizing dealers to act as registration agents that approve registration and title applications, issue registration receipts, and maintain and deliver permanent metal license plates is not recommended. Although distribution of permanent plates by dealers is not recommended, it is recommended that dealers participating in ERT generate and print registration applied for cards electronically. Unlike the manually-issued cards currently in use, cards issued in this fashion may be queried by law enforcement and are less susceptible to misuse by customers and dealers. The estimated time to implement the electronic application and registration applied for cards is 12 to 18 months, to begin after ELT and EFT have been implemented. It is recommended that focus during this time be on facilitating transfers through motor vehicle dealers, with initial deployment focused on higher-volume dealers that use DMS systems. In the long term an internet option for access to ERT must also be developed and maintained to allow participation for lower-volume dealers that do not use a DMS system. This option will also lay the ground work for an ERT option for sales between private individuals. Mandatory participation in Iowa is not recommended initially. As with ELT, it is recommended that mandatory participation be considered after at least an initial phase of ERT has been implemented and a suitable number of dealers have enrolled to provide a fair assessment of participation rates and opportunities. The use of vendors to facilitate ERT is not initially proposed because 1) DOT IT support staff is capable of developing a system that will interact with DMS systems and will still have to develop a dealer and public interface regardless of whether a vendor acts as intermediary between the DMS systems, and 2) there is concern that the cost of the vendor-based system, which is funded by transaction-based payments from the dealer to the vendor, will be passed to the consumer in the form of additional documentation or conveyance fees. However, the DOT recommends flexibility on this point, as development and pilot of the system may indicate that a multi-vendor approach similar to that recommended for ELT may increase the adoption rate by larger dealers and may ultimately decrease the user management to be exercised by DOT staff. If vendors are used in the process, additional legislation or administrative rules may be needed to control the fees that may be passed to the consumer. No direct cost to the DOT or county treasurers is expected, as the DOT expects that it may complete necessary programming with existing staff. Use of vendors to facilitate ERT transactions by dealers using DMS systems would result in transaction fees that may ultimately be passed to consumers. LEGISLATION – As a result of the changes implemented in 2004 under Senate File 2070, the only changes to Iowa statutes proposed are to section 321.69 of the Iowa Code, ―Damage disclosure statement,and section 321.71, ―Odometer requirements.‖ In each instance, authority to execute these statements by electronic means would be clarified by authorizing language similar to that used in section 321.20, subsections ―2‖ and ―3,‖ which allows for electronic applications and directs the department to ―adopt rules on the method for providing signatures for applications made by electronic means.‖ In these sections, the authorizing language might read as follows: Notwithstanding contrary provisions of this section, the department may develop and implement a program to allow for any statement required by this section to be made electronically. The department shall adopt rules on the method for providing signatures for statements made by electronic means. Some changes to DOT administrative rules will be useful but only to enable changes to work processes that would be desirable in the long term. Examples of long term work processes that would be enabled by rule changes include allowing for signatures created through electronic means and electronic odometer certifications. The DOT rules, as currently written, do not hinder the ability to proceed with ELT, EFT, and ERT.
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Transportation’s Vehicle Registration and Title System for the period April 16, 2012 through May 15, 2012
Resumo:
Case report from the Civil Rights Commission. Maxine Faye Boomgarden and Iowa Civil Rights Commission vs. Hardin County Veterans' Commission Board and Hardin County Board of Supervisors.
Resumo:
As worldwide consumer demand for high-quality products and for information about these products increases, labels and geographical indications (GIs) can serve to signal quality traits to consumers. However, GI systems among countries are not homogeneous and can be used as trade barriers against competition. Philosophical differences between the European Union and the United States about how GIs should be registered and protected led to the formation of a WTO dispute settlement panel. In this paper we discuss the issues behind the dispute, the World Trade Organization (WTO) panel decision, and the EU response to the panel decision leading to the new Regulation 510/2006. Given the potential for GI labels to supply consumer information, context is provided for the discussion using recent literature on product labeling. Implications are drawn regarding the importance of the panel decision and the EU response relative to GI issues yet to be negotiated under the Doha Round.
Resumo:
This document is intended to lay the foundation for resource reduction strategies in new construction, renovation and demolition. If you have an innovative idea or information that you believe should be included in future updates of this manual please email Shelly Codner at scodner@region12cog.org or Jan Loyson at Jan.Loyson@Iowalifechanging.com. Throughout this manual, we use the term “waste reduction” to define waste management initiatives that will result in less waste going to the landfill. In accordance with the waste management hierarchy these practices include reducing (waste prevention), reusing (deconstruction and salvage), recycling and renewing (making old things new again) - in that order. This manual will explain what these practices are and how to incorporate them into your projects.
Resumo:
Executive Summary Purposes of this Report: • Recommend the most logical and economical options to address state governmental space needs in the Polk County metropolitan area to the year 2010. • Include building size, location, phasing, financing, method of project delivery and estimated cost. • Develop a software tool to compare costs of leasing vs. ownership of space. Methodology: Identify: 1. Current amount and location of owned and leased space, by agency; 2. Types of space and whether best located on or off of the Capitol Complex; 3. Utilization of space, noting over-crowding and under-utilization; 4. Current number of workstations for full and part time employees, Personnel Employment Organization (PEO) workers, contractors, interns, etc.; and, 5. History of staff levels to assist in the prediction of staff growth. Scope: This report focuses on 10 state-owned buildings located on the Capitol Complex and 48 leased spaces in the Polk County metropolitan area. (See Figures 1 and 2.) • Due to a separate space study under way by the Legislature, implications of area and staff for the State Capitol building are included only for the Governor, Lieutenant Governor, Treasurer, Secretary of State, Auditor and the Department of Management. • Because it is largely a museum building that does not have office space available for other agencies, the area and staff of the Historical Building are not fully addressed. • Only the parking implications of the new Judicial Building are included in this study because the building space is under the jurisdiction of the Judicial Branch and not available for other agencies. Several state-owned buildings are not included in the scope of this report, generally because they have highly focused purposes, and their space is not available for assignment to other agencies. Several leased locations are not included for similar reasons, including leases that do not fall within the authority of the Department of General Services.
Resumo:
This manual captures the experience of practitioners in the Iowa Department of Transportation’s (Iowa DOT’s) Office of Location and Environment (OLE). It also documents the need for coordinated project development efforts during the highway project planning, or location study phase and engineering design. The location study phase establishes: * The definition of, and need for, the highway improvement project * The range of alternatives and many key attributes of the project’s design * The recommended alternative, its impacts, and the agreed-to conditions for project approval The location study process involves developing engineering alternatives, collecting engineering and environmental data, and completing design refinements to accomplish functional designs. The items above also embody the basic content required for projects compliant with the National Environmental Policy Act (NEPA) of 19691, which directs federal agencies to use a systematic, interdisciplinary approach during the planning process whenever proposed actions (or “projects”) have the potential for environmental impacts. In doing so, NEPA requires coordination with stakeholders, review, comment, and public disclosure. Are location studies and environmental studies more about the process or the documents? If properly conducted, they concern both—unbiased and reasonable processes with quality and timely documents. In essence, every project is a story that needs to be told. Engineering and environmental regulations and guidance, as documented in this manual, will help project staff and managers become better storytellers.
Resumo:
This guide was created to aid communities in the process of smart planning and is organized around the 10 Smart Planning Principles signed into Iowa law in 2010. A general description of the concept, strategies for encouraging use, policy tools for implementation, and a current Iowa example are presented for each Principle. In addition, a brief list of resources is provided to help local governments, community organizations and citizen planners find information and ideas on community involvement and incorporation of smart planning concepts in every day decisions.
Resumo:
The 2014 Iowa Tribal Summit on Cultural Preservation and Transportation was a three day event held in Ames, Iowa, where Tribal officials, transportation officials, and preservation partners sat down to discuss various topics of interest related to consultation under the National Historical Preservation Act. The goal of this Summit was for these groups to discuss and develop effective project consultation. These proceeding provide a summary of the event, as well as recommendations for how to approach similar events in the future. In sum, 13 tribal officials, 16 transportation officials, 10 preservation partners, and two moderators attended all parts of the Summit. The 2014 Summit was a successful event when assessed in terms of group participation and attendee feedback. However, all attendees agree that events such as this Summit are most effective when they occur on a somewhat regular basis, where consulting parties can have regular dialog and interaction regarding all aspects of consultation under the National Historical Preservation Act. Recommendations offered herein can be applied to various consultation situations. -- Summary, page iii
Resumo:
Based on results of an evaluation performed during the winter of 1985-86, six Troxler 3241-B Asphalt Content Gauges were purchased for District use in monitoring project asphalt contents. Use of these gauges will help reduce the need for chemical based extractions. Effective use of the gauges depends on the accurate preparation and transfer of project mix calibrations from the Central Lab to the Districts. The objective of this project was to evaluate the precision and accuracy of a gauge in determining asphalt contents and to develop a mix calibration transfer procedure for implementation during the 1987 construction. The first part of the study was accomplished by preparing mix calibrations in the Central Lab gauge and taking multiple measurements of a sample with known asphalt content. The second part was accomplished by preparing transfer pans, obtaining count data on the pans using each gauge, and transferring calibrations from one gauge to another through the use of calibration transfer equations. The transferred calibrations were tested by measuring samples with a known asphalt content. The study established that the Troxler 3241-B Asphalt Content Gauge yields results of acceptable accuracy and precision as evidenced by a standard deviation of 0.04% asphalt content on multiple measurements of the same sample. The calibration transfer procedure proved feasible and resulted in the calibration transfer portion of Materials I.M. 335 - Method of Test For Determining the Asphalt Content of Bituminous Mixtures by the Nuclear Method.
Resumo:
For several years, the Iowa Department of Transportation has constructed bypasses along rural highways. Most bypasses were constructed on the state’s Commercial Industrial Network (CIN). Now that work on the CIN has been completed and the system is open to traffic, it is possible to study the impacts of bypasses. In the past, construction of highway bypasses has led community residents and business people to raise concerns about the loss of business activity. For policy development purposes, it is essential to understand the impacts that a bypass might have on safety, the community, and economics. By researching these impacts, policies can be produced to help to alleviate any negative impacts and create a better system that is ultimately more cost-effective. This study found that the use of trade area analysis does not provide proof that a bypass can positively or negatively impact the economy of a rural community. The analysis did show that, even though the population of a community may be stable for several years and per capita income is increasing, sales leakage still occurs. The literature, site visits, and data make it is apparent that a bypass can positively affect a community. Some conditions that would need to exist in order to maximize a positive impact include the installation of signage along the bypass directing travelers to businesses and services in the community, community or regional plans that include the bypass in future land development scenarios, and businesses adjusting their business plans to attract bypass users. In addition, how proactive a community is in adapting to the bypass will determine the kinds of effects felt in the community. Results of statistical safety analysis indicate that, at least when crashes are separated by severity, bypasses with at-grade accesses appear to perform more poorly than either the bypasses with fully separated accesses or with a mix of at-grade and fully separated accesses. However, the benefit in terms of improved safety of bypasses with fully separated accesses relative to bypasses with a mixed type of accesses is not statistically conclusive.
Resumo:
Annual report for Iowa Department of Public Safety
Resumo:
Annual report for Iowa Department of Public Safety
Resumo:
CJJP takes a look at the forecast of inmates population in the state of Iowa in a ten year period. Information was produced by Division of Criminal and Juvenile Justice Planning. This report was made possible partially through funding from the U.S. Department of Justice, Bureau of Justice Statistics and its program for State Statistical Analysis Centers. Points of view or opinions expressed in this report are those of the Division of Criminal and Juvenile Justice Planning (CJJP), and do not necessarily reflect official positions of the U.S. Department of Justice.
Resumo:
Monthly newsletter for people in Iowa that live on Acreages, produced by Iowa State University Copperative Extension.