10 resultados para Internal feedback
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Iowa has 8 commercial service airports and 105 general aviation airports, of which three serve as reliever airports. ***NOTE*** This document is for historical viewing, the internal information is no longer current or accurate! ***NOTE*** Current information can be found at http://www.iowadot.gov/aviation/aircraftregistration/registration.aspx ***NOTE***
Resumo:
For the 2004 strategic planning process at Iowa Workforce Development, Director Richard Running asked for as much input from all staff as possible. As a result, planning staff designed an extensive process to gather input over about a three month period during the late spring and summer: • A Guide to Staff Involvement was drafted and distributed to staff in offices throughout the state. This guide provided a brief explanation of the planning process and quoted extensively from the Vilsack/Pederson Leadership Agenda and the 2003 IWD strategic plan to illustrate each step and to show examples of alignment. The guide also provided suggestions for staff in various locations and work units to conduct their own planning sessions. The structure was designed to solicit feedback regarding elements (vision, mission, guiding principles, goals and strategies) of the existing 2003 plan. Particular attention was devoted to securing non-management staff’s perspective during the internal and external assessment exercises. • Several local offices did conduct their own structured input sessions following the suggested guidelines and sent the results to planning staff in the central administrative offices. • Other work units in many locations opted to ask planning staff to facilitate planning sessions for them. The results of these sessions were also gathered by planning staff. In all, dozens of input sessions were held and hundreds of IWD staff participated directly in the process. Because all the sessions followed similar guidelines, it was relatively easy to combine all of the input received and spot common themes that surfaced from the many sessions. A composite of all the flip chart notes was compiled into one large document (for those who like lots of detail) and another document summarized the key themes that emerged. This information was used in a day-long planning retreat on August 20. Management staff members from throughout the department were invited and each work unit and sub-state region also brought a non-management staff person as well. This group reviewed the themes from the earlier sessions and then addressed each element of the 2003 plan, proposing refinements for almost all sections. Subsequently, senior management reviewed the results of the retreat and made the final decisions for the new 2004 plan. This thorough approach, with its special emphasis on input from line staff, did result in some significant changes to IWD’s plan. Local office staff, for example, consistently expressed the need to step up our marketing efforts, especially with employers. Another need that was expressed clearly and often was the need to beef up staff training efforts, much of the capacity for which had been lost in budget and staff reductions a few years ago. Neither of these issues is new, but the degree of concern expressed by IWD staff has caused us to elevate their importance in this year’s plan.
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Transportation’s Internal Billing System for the period April 6, 2009 through July 31, 2009
Resumo:
Audit report on Internal Control over Financial Reporting of the State University of Iowa as of and for the year ended June 30, 2011
Resumo:
Independent auditor’s report of the State of Iowa on internal control over financial reporting and on compliance and other matters based on an audit of financial statements performed in accordance with government auditing standards for the year ended June 30, 2011
Resumo:
Audit report on internal control over financial reporting and on compliance and other matters of the State of Iowa for the year ended June 30, 2012
Resumo:
Highway construction is among the most dangerous industries in the US. Internal traffic control design, along with how construction equipment and vehicles interact with the traveling public, have a significant effect on how safe a highway construction work zone can be. An integrated approach was taken to research work-zone safety issues and mobility, including input from many personnel, ranging from roadway designers to construction laborers and equipment operators. The research team analyzed crash data from Iowa work-zone incident reports and Occupational Safety and Health Administration data for the industry in conjunction with the results of personal interviews, a targeted work-zone ingress and egress survey, and a work-zone pilot project.
Resumo:
This project examines the effects of age, experience, and video-based feedback on the rate and type of safety-relevant events captured on video event recorders in the vehicles of three groups of newly licensed young drivers: 1. 14.5- to 15.5-year-old drivers who hold a minor school license (see Appendix A for the provisions of the Iowa code governing minor school licenses); 2. 16-year-old drivers with an intermediate license who are driving unsupervised for the first time; 3. 16-year-old drivers with an intermediate license who previously drove unsupervised for at least four months with a school license. METHODS: The young drivers’ vehicles were equipped with an event-triggered video recording device for 24 weeks. Half of the participants received feedback regarding their driving, and the other half received no feedback at all and served as a control group. The number of safety-relevant events per 1,000 miles (i.e., “event rate”) was analyzed for 90 participants who completed the study. RESULTS: On average, the young drivers who received the video-based intervention had significantly lower event rates than those in the control group. This finding was true for all three groups. An effect of experience was seen for drivers in the control group; the 16-year-olds with driving experience had significantly lower event rates than the 16-year-olds without experience. When the intervention concluded, an increase in event rate was seen for the school license holders, but not for either group of 16-year-old drivers. There is strong evidence that giving young drivers video-based feedback, regardless of their age or level of driving experience, is effective in reducing the rate of safety-relevant events relative to a control group who do not receive feedback. Specific comparisons with regard to age and experience indicated that the age of the driver did not have an effect on the rate of safety-events, while experience did. Young drivers with six months or more of additional experience behind the wheel had nearly half as many safety-relevant events as those without that experience.
Resumo:
Dynamic speed feedback sign (DSFS) systems are traffic control devices that are programmed to provide a message to drivers exceeding a certain speed thresh¬old. A DSFS system typically consists of a speed-measuring device, which may be loop detectors or radar, and a message sign that displays feedback to drivers who exceed a predetermined speed threshold. The feedback may be the driver’s actual speed, a message like “SLOW DOWN,” or activation of a warning device such as beacons or a curve warning sign. For more on this topic by these authors, see also "Evaluation of Dynamic Speed Feedback Signs on Curves: A National Demonstration Project": http://www.trb.org/main/blurbs/172092.aspx
Resumo:
Conventional concrete is typically cured using external methods. External curing prevents drying of the surface, allows the mixture to stay warm and moist, and results in continued cement hydration (Taylor 2014). Internal curing is a relatively recent technique that has been developed to prolong cement hydration by providing internal water reservoirs in a concrete mixture that do not adversely affect the concrete mixture’s fresh or hardened physical properties. Internal curing grew out of the need for more durable structural concretes that were resistant to shrinkage cracking. Joint spacing for concrete overlays can be increased if slab warping is reduced or eliminated. One of the most promising potential benefits from using internal curing for concrete overlays, then, is the reduced number of joints due to increased joint spacing (Wei and Hansen 2008).