31 resultados para Internal Betic Zone

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Highway construction is among the most dangerous industries in the US. Internal traffic control design, along with how construction equipment and vehicles interact with the traveling public, have a significant effect on how safe a highway construction work zone can be. An integrated approach was taken to research work-zone safety issues and mobility, including input from many personnel, ranging from roadway designers to construction laborers and equipment operators. The research team analyzed crash data from Iowa work-zone incident reports and Occupational Safety and Health Administration data for the industry in conjunction with the results of personal interviews, a targeted work-zone ingress and egress survey, and a work-zone pilot project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa has 8 commercial service airports and 105 general aviation airports, of which three serve as reliever airports. ***NOTE*** This document is for historical viewing, the internal information is no longer current or accurate! ***NOTE*** Current information can be found at http://www.iowadot.gov/aviation/aircraftregistration/registration.aspx ***NOTE***

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Regulations for hunting in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report on the Iowa Enterprise Zone Program was prepared by the Iowa Department of Economic Development in accordance with 2006 Iowa Acts, Senate File 2183, Section 9.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Regulations for hunting in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of selected general and application controls over the Iowa Department of Transportation’s Internal Billing System for the period April 6, 2009 through July 31, 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In urban communities, there are often limited amounts of right-of-way available for establishing a large setback distance from the curb for fixed objects. Urban communities must constantly weigh the cost of purchasing additional right-of-way for clear zones against the risk of fixed object crashes. From 2004 to 2006, this type of crash on curbed roads represented 15% of all fatal crashes and 3% of all crashes in the state of Iowa. Many states have kept the current minimum AASHTO recommendations as their minimum clear zone standards; however, other states have decided that these recommendations are insufficient and have increased the required minimum clear zone distance to better suit the judgment of local designers. This report presents research on the effects of the clear zone on urban curbed streets. The research was conducted in two phases. The first phase involved a synthesis of practice that included a literature review and a survey of practices in jurisdictions that have developmental and historical patterns similar to those of Iowa. The second phase involved investigating the benefits of a 10 ft clear zone, which included examining urban corridors in Iowa that meet or do not meet the 10 ft clear zone goal. The results of this study indicate that a consistent fixed object offset results in a reduction in the number of fixed object crashes, a 5 ft clear zone is most effective when the goal is to minimize the number of fixed object c ashes, and a 3 ft clear zone is most effective when the goal is to minimize the cost of fixed object crashes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Construction zones pose a significant threat to both workers and drivers causing numerous injuries and deaths each year. Innovations in work zone safety could reduce these numbers. However, implementing work zone interventions before they are validated can undermine rather than enhance safety. The objective of this research is to demonstrate how driving simulators can be used to evaluate the effect of various work zone interventions on driver performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A previous study sponsored by the Smart Work Zone Deployment Initiative, “Feasibility of Visualization and Simulation Applications to Improve Work Zone Safety and Mobility,” demonstrated the feasibility of combining readily available, inexpensive software programs, such as SketchUp and Google Earth, with standard two-dimensional civil engineering design programs, such as MicroStation, to create animations of construction work zones. The animations reflect changes in work zone configurations as the project progresses, representing an opportunity to visually present complex information to drivers, construction workers, agency personnel, and the general public. The purpose of this study is to continue the work from the previous study to determine the added value and resource demands created by including more complex data, specifically traffic volume, movement, and vehicle type. This report describes the changes that were made to the simulation, including incorporating additional data and converting the simulation from a desktop application to a web application.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Internal Control over Financial Reporting of the State University of Iowa as of and for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Independent auditor’s report of the State of Iowa on internal control over financial reporting and on compliance and other matters based on an audit of financial statements performed in accordance with government auditing standards for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this project was to promote and facilitate analysis and evaluation of the impacts of road construction activities in Smart Work Zone Deployment Initiative (SWZDI) states. The two primary objectives of this project were to assess urban freeway work-zone impacts through use of remote monitoring devices, such as radar-based traffic sensors, traffic cameras, and traffic signal loop detectors, and evaluate the effectiveness of using these devices for such a purpose. Two high-volume suburban freeway work zones, located on Interstate 35/80 (I-35/I-80) through the Des Moines, Iowa metropolitan area, were evaluated at the request of the Iowa Department of Transportation (DOT).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on internal control over financial reporting and on compliance and other matters of the State of Iowa for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The focus of this report is a capacity analysis of two long-term urban freeway Work Zones. Work Zone #1 tapered four mainline lanes to two, using two separate tapers; Work Zone #2 tapered two mainline lanes to one. Work Zone throughput was analyzed throughout the day over multiple days and traffic operations conditions were analyzed up to a distance of five miles upstream of the Work Zone entrance. Historical data from pavement-embedded detectors were used to analyze traffic conditions. The database consisted of five-minute volume, speed and occupancy data collected from 78 detectors for a total of 50 days. Congestion during each analyzed Work Zone existed for more than fourteen hours each day; Work Zone impacts adversely affected freeway operations over distances of 3.7 to 4.2 miles. Speed and occupancy conditions further upstream were, however, not affected, or even improved due to significant trip diversion. Work Zone capacity was defined based on the maximum traffic flows observed over a one-hour period; throughput values were also compiled over longer periods of time when traffic was within 90% of the maximum observed one-hour flows, as well as over the multi-hour mid-day period. The Highway Capacity Manual freeway capacity definition based on the maximum observed 15-min period was not used, since it would have no practical application in estimating Work Zone throughput when congested conditions prevail for the majority of the hours of the day. Certain noteworthy changes took place for the duration of the analyzed Work Zones: per-lane throughput dropped; morning peak periods started earlier, evening peak periods ended later and lasted longer; mid-day volumes dropped accompanied by the highest occupancies of the day. Trip diversion was evident in lower volumes entering the analyzed freeway corridor, higher volumes using off-ramps and lower volumes using onramps upstream of the Work Zones. The majority of diverted traffic comprised smaller vehicles (vehicles up to 21 feet in length); combination truck volumes increased and their use of the median lane increased, contrary to smaller vehicles that shifted toward a heavier use of the shoulder lane.