6 resultados para Initial solution

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A detailed investigation has been conducted on core samples taken from 17 portland cement concrete pavements located in Iowa. The goal of the investigation was to help to clarify the root cause of the premature deterioration problem that has become evident since the early 1990s. Laboratory experiments were also conducted to evaluate how cement composition, mixing time, and admixtures could have influenced the occurrence of premature deterioration. The cements used in this study were selected in an attempt to cover the main compositional parameters pertinent to the construction industry in Iowa. The hardened air content determinations conducted during this study indicated that the pavements that exhibited premature deterioration often contained poor to marginal entrained-air void systems. In addition, petrographic studies indicated that sometimes the entrained-air void system had been marginal after mixing and placement of the pavement slab, while in other instances a marginal to adequate entrained-air void system had been filled with ettringite. The filling was most probably accelerated because of shrinkage cracking at the surface of the concrete pavements. The results of this study suggest that the durability—more sciecifically, the frost resistance—of the concrete pavements should be less than anticipated during the design stage of the pavements. Construction practices played a significant role in the premature deterioration problem. The pavements that exhibited premature distress also exhibited features that suggested poor mixing and poor control of aggregate grading. Segregation was very common in the cores extracted from the pavements that exhibited premature distress. This suggests that the vibrators on the paver were used to overcome a workability problem. Entrained-air voids formed in concrete mixtures experiencing these types of problems normally tend to be extremely coarse, and hence they can easily be lost during the paving process. This tends to leave the pavement with a low air content and a poor distribution of air voids. All of these features were consistent with a premature stiffening problem that drastically influenced the ability of the contractor to place the concrete mixture. Laboratory studies conducted during this project indicated that most premature stiffening problems can be directly attributed to the portland cement used on the project. The admixtures (class C fly ash and water reducer) tended to have only a minor influence on the premature stiffening problem when they were used at the dosage rates described in this study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

LEGISLATIVE STUDY – The 83rd General Assembly of the Iowa Legislature, in Senate File 2273, directed the Iowa Department of Transportation (DOT) to conduct a study of how to implement a uniform statewide system to allow for electronic transactions for the registration and titling of motor vehicles. PARTICIPANTS IN STUDY – As directed by Senate File 2273, the DOT formed a working group to conduct the study that included representatives from the Consumer Protection Division of the Office of the Attorney General, the Department of Public Safety, the Department of Revenue, the Iowa State County Treasurer’s Association, the Iowa Automobile Dealers Association, and the Iowa Independent Automobile Dealers Association. CONDUCT OF THE STUDY – The working group met eight times between June 17, 2010, and October 1, 2010. The group discussed the costs and benefits of electronic titling from the perspectives of new and used motor vehicle dealers, county treasurers, the DOT, lending institutions, consumers and consumer protection, and law enforcement. Security concerns, legislative implications, and implementation timelines were also considered. In the course of the meetings the group: 1. Reviewed the specific goals of S.F. 2273, and viewed a demonstration of Iowa’s current vehicle registration and titling system so participants that were not users of the system could gain an understanding of its current functionality and capabilities. 2. Reviewed the results of a survey of county treasurers conducted by the DOT to determine the extent to which county treasurers had processing backlogs and the extent to which county treasurers limited the number of dealer registration and titling transactions that they would process in a single day and while the dealer waited. Only eight reported placing a limit on the number of dealer transactions that would be processed while the dealer waited (with the number ranging from one to four), and only 11 reported a backlog in processing registration and titling transactions as of June 11, 2010, with most backlogs being reported in the range of one to three days. 3. Conducted conference calls with representatives of the American Association of Motor Vehicle Administrators (AAMVA) and representatives of three states -- Kansas, which has an electronic lien and titling (ELT) program, and Wisconsin and Florida, each of which have both an ELT program and an electronic registration and titling (ERT) program – to assess current and best practices for electronic transactions. In addition, the DOT (through AAMVA) submitted a survey to all U.S. jurisdictions to determine how, if at all, other states implemented electronic transactions for the registration and titling of motor vehicles. Twenty-eight states responded to the survey; of the 28 states that responded, only 13 allowed liens to be added or released electronically, and only five indicated allowing applications for registration and titling to be submitted electronically. DOT staff also heard a presentation from South Dakota on its ERT system at an AAMVA regional meeting. ELT information that emerged suggests a multi-vendor approach, in which vendors that meet state specifications for participation are authorized to interface with the state’s system to serve as a portal between lenders and the state system, will facilitate electronic lien releases and additions by offering lenders more choices and the opportunity to use the same vendor in multiple states. The ERT information that emerged indicates a multi-interface approach that offers an interface with existing dealer management software (DMS) systems and through a separate internet site will facilitate ERT by offering access that meets a variety of business needs and models. In both instances, information that emerged indicates that, in the long-term, adoption rates are positively affected by making participation above a certain minimum threshold mandatory. 4. To assess and compare functions or services that might be offered by or through a vendor, the group heard presentations from vendors that offer products or services that facilitate some aspect of ELT or ERT. 5. To assess the concerns, needs and interest of Iowa motor vehicle dealers, the group surveyed dealers to assess registration and titling difficulties experienced by dealers, the types of DMS systems (if any) used by dealers, and the dealers’ interest and preference in using an electronic interface to submit applications for registration and titling. Overall, 40% of the dealers that responded indicated interest and 57% indicated no interest, but interest was pronounced among new car dealers (75% were interested) and dealers with a high number of monthly transactions (85% of dealers averaging more than 50 sales per month were interested). The majority of dealers responding to the dealer survey ranked delays in processing and problems with daily limits on transaction as ―minor difficulty or ―no difficulty. RECOMMENDATIONS -- At the conclusion of the meetings, the working group discussed possible approaches for implementation of electronic transactions in Iowa and reached a consensus that a phased implementation of electronic titling that addressed first electronic lien and title transactions (ELT) and electronic fund transfers (EFT), and then electronic applications for registration and titling (ERT) is recommended. The recommendation of a phased implementation is based upon recognition that aspects of ELT and EFT are foundational to ERT, and that ELT and EFT solutions are more readily and easily attained than the ERT solution, which will take longer and be somewhat more difficult to develop and will require federal approval of an electronic odometer statement to fully implement. ELT – A multi-vendor approach is proposed for ELT. No direct costs to the state, counties, consumers, or dealers are anticipated under this approach. The vendor charges participating lenders user or transaction fees for the service, and it appears the lenders typically absorb those costs due to the savings offered by ELT. Existing staff can complete the programming necessary to interface the state system with vendors’ systems. The estimated time to implement ELT is six to nine months. Mandatory participation is not recommended initially, but should be considered after ELT has been implemented and a suitable number of vendors have enrolled to provide a fair assessment of participation rates and opportunities. EFT – A previous attempt to implement ELT and EFT was terminated due to concern that it would negatively impact county revenues by reducing interest income earned on state funds collected by the county and held until the monthly transfer to the state. To avoid that problem in this implementation, the EFT solution should remain revenue neutral to the counties, by allowing fees submitted by EFT to be immediately directed to the proper county account. Because ARTS was designed and has the capacity to accommodate EFT, a vendor is not needed to implement EFT. The estimated time to implement EFT is six to nine months. It is expected that EFT development will overlap ELT development. ERT – ERT itself must be developed in phases. It will not be possible to quickly implement a fully functioning, paperless ERT system, because federal law requires that transfer of title be accompanied by a written odometer statement unless approval for an alternate electronic statement is granted by the National Highway Traffic Safety Administration (NHTSA). It is expected that it will take as much as a year or more to obtain NHTSA approval, and that NHTSA approval will require design of a system that requires the seller to electronically confirm the seller’s identity, make the required disclosure to the buyer, and then transfer the disclosure to the buyer, who must also electronically confirm the buyer’s identity and electronically review and accept the disclosure to complete and submit the transaction. Given the time that it will take to develop and gain approval for this solution, initial ERT implementation will focus on completing and submitting applications and issuing registration applied for cards electronically, with the understanding that this process will still require submission of paper documents until an electronic odometer solution is developed. Because continued submission of paper documents undermines the efficiencies sought, ―full‖ ERT – that is, all documents necessary for registration and titling should be capable of approval and/or acceptance by all parties, and should be capable of submission without transmittal or delivery of duplicate paper documents .– should remain the ultimate goal. ERT is not recommended as a means to eliminate review and approval of registration and titling transactions by the county treasurers, or to place registration and titling approval in the hands of the dealers, as county treasurers perform an important role in deterring fraud and promoting accuracy by determining the genuineness and regularity of each application. Authorizing dealers to act as registration agents that approve registration and title applications, issue registration receipts, and maintain and deliver permanent metal license plates is not recommended. Although distribution of permanent plates by dealers is not recommended, it is recommended that dealers participating in ERT generate and print registration applied for cards electronically. Unlike the manually-issued cards currently in use, cards issued in this fashion may be queried by law enforcement and are less susceptible to misuse by customers and dealers. The estimated time to implement the electronic application and registration applied for cards is 12 to 18 months, to begin after ELT and EFT have been implemented. It is recommended that focus during this time be on facilitating transfers through motor vehicle dealers, with initial deployment focused on higher-volume dealers that use DMS systems. In the long term an internet option for access to ERT must also be developed and maintained to allow participation for lower-volume dealers that do not use a DMS system. This option will also lay the ground work for an ERT option for sales between private individuals. Mandatory participation in Iowa is not recommended initially. As with ELT, it is recommended that mandatory participation be considered after at least an initial phase of ERT has been implemented and a suitable number of dealers have enrolled to provide a fair assessment of participation rates and opportunities. The use of vendors to facilitate ERT is not initially proposed because 1) DOT IT support staff is capable of developing a system that will interact with DMS systems and will still have to develop a dealer and public interface regardless of whether a vendor acts as intermediary between the DMS systems, and 2) there is concern that the cost of the vendor-based system, which is funded by transaction-based payments from the dealer to the vendor, will be passed to the consumer in the form of additional documentation or conveyance fees. However, the DOT recommends flexibility on this point, as development and pilot of the system may indicate that a multi-vendor approach similar to that recommended for ELT may increase the adoption rate by larger dealers and may ultimately decrease the user management to be exercised by DOT staff. If vendors are used in the process, additional legislation or administrative rules may be needed to control the fees that may be passed to the consumer. No direct cost to the DOT or county treasurers is expected, as the DOT expects that it may complete necessary programming with existing staff. Use of vendors to facilitate ERT transactions by dealers using DMS systems would result in transaction fees that may ultimately be passed to consumers. LEGISLATION – As a result of the changes implemented in 2004 under Senate File 2070, the only changes to Iowa statutes proposed are to section 321.69 of the Iowa Code, ―Damage disclosure statement,and section 321.71, ―Odometer requirements.‖ In each instance, authority to execute these statements by electronic means would be clarified by authorizing language similar to that used in section 321.20, subsections ―2‖ and ―3,‖ which allows for electronic applications and directs the department to ―adopt rules on the method for providing signatures for applications made by electronic means.‖ In these sections, the authorizing language might read as follows: Notwithstanding contrary provisions of this section, the department may develop and implement a program to allow for any statement required by this section to be made electronically. The department shall adopt rules on the method for providing signatures for statements made by electronic means. Some changes to DOT administrative rules will be useful but only to enable changes to work processes that would be desirable in the long term. Examples of long term work processes that would be enabled by rule changes include allowing for signatures created through electronic means and electronic odometer certifications. The DOT rules, as currently written, do not hinder the ability to proceed with ELT, EFT, and ERT.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Executive Summary I. Survey The Task Force conducted a wide-ranging survey of more than 9,000 licensed Iowa attorneys and judges to obtain their input on a variety of civil justice system topics. The survey results helped inform the Task Force of problem areas in Iowa’s civil justice system. II. Two-Tier Justice System The Task Force recommends a pilot program based on a two-tier civil justice system. A two-tier system would streamline litigation processes—including rules of evidence and discovery disclosures—and reduce litigation costs of certain cases falling below a threshold dollar value. III. One Judge/One Case and Date Certain for Trial Some jurisdictions in Iowa have adopted one judge/one case and date certain for trial in certain cases. The assignment of one judge to each case for the life of the matter and the establishment of dates certain for civil trials could enhance Iowans’ access to the courts, improve judicial management, promote consistency and adherence to deadlines, and reduce discovery excesses. IV. Discovery Processes Reforms addressing inefficient discovery processes will reduce delays in and costs of litigation. Such measures include adopting an aspirational purpose for discovery rules to “secure the just, speedy, and inexpensive determination of every action,” holding discovery proportional to the size and nature of the case, requiring initial disclosures, limiting the number of expert witnesses, and enforcing existing rules. V. Expert Witness Fees The Task Force acknowledges the probable need to revisit the statutory additional daily compensation limit for expert witness fees. Leaving the compensation level to the discretion of the trial court is one potential solution. VI. Jurors Additions to the standard juror questionnaire would provide a better understanding of the potential jurors’ backgrounds and suitability for jury service. The Task Force encourages adoption of more modern juror educational materials and video. Rehabilitation of prospective jurors who express an unwillingness or inability to be fair should include a presumption of dismissal. VII. Video and Teleconferencing Options When court resources are constrained both by limited numbers of personnel and budget cuts, it is logical to look to video and teleconferencing technology to streamline the court process and reduce costs. The judicial branch should embrace technological developments in ways that will not compromise the fairness, dignity, solemnity, and decorum of judicial proceedings. VIII. Court-Annexed Alternative Dispute Resolution(ADR) Litigants and practitioners in Iowa are generally satisfied with the current use of private, voluntary ADR for civil cases. There is concern, however, that maintaining the status quo may have steep future costs. Court-annexed ADR is an important aspect of any justice system reform effort, and the Task Force perceives benefits and detriments to reforming this aspect of the Iowa civil justice system. IX. Relaxed Requirement of Findings of Fact and Conclusions of Law A rule authorizing parties to waive findings of fact and conclusions of law could expedite resolution of nonjury civil cases. X. Business (Specialty) Courts Specialty business courts have achieved widespread support across the country. In addition, specialty courts provide excellent vehicles for implementing or piloting other court innovations that may be useful in a broader court system context. A business specialty court should be and could be piloted in Iowa within the existing court system framework of the Iowa Judicial Branch. Appendix included as a separate document, is 176 pages.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project was directed at laboratory and field evaluation of sodium montmorillonite clay (bentonite) as a dust palliative for limestone surfaced secondary roads. It had been postulated that the electrically charged surfaces of the clay particles could interact with the charged surfaces of the limestone and act as a bonding agent to agglomerate fine (-#200) particulates and also to band the fine particulates to larger (+#200) limestone particles. Laboratory testing using soda ash dispersed bentonite treatment of limestone fines indicated significant improvement of compressive strength and slaking characteristics. It was recommended that the project proceed to field trials and test roads were constructed in Dallas and Adair counties in Iowa. Soda ash dispersed bentonite solutions can be field mixed and applied with conventional spray distribution equipment. A maximum of 1.5% bentonite(by weight of aggregate)can be applied at one time. Higher applications would have to be staged allowing the excess moisture to evaporate between applications. Construction of higher application treatments can be accomplished by adding dry bentonite to the surfacing material and then by dry road mixing. The soda ash water solution can then be spray applied and the treated surfacing material wet mixed by motor graders to a consistency of 3 to 4 inch slump concrete. Two motor graders working in tandem can provide rapid mixing for both methods of construction. Calcium and magnesium chloride treatments are 2 to 3 times more effective in dust reduction in the short term (3-4 months) but are prone to washboarding and potholing due to maintenance restrictions. Bentonite treatment at the 2-3% level is estimated to provide a 30-40% dust reduction over the long term(18-24 months). Normal maintenance blading operations can be used on bentonite treated areas. Vehicle braking characteristics are not adversely affected up to the 3.0% treatment level. The bentonite appears to be functioning as a banding agent to bind small particulates to larger particles and is acting to agglomerate fine particles of limestone. This bonding capability appears recoverable from environmental effects of winter, and from alternating wet and dry periods. The bentonite appears to be able to interact with new applications of limestone maintenance material and maintains a dust reduction capability. Soda ash dispersed bentonite treatment is approximately 10 times more cost effective per percent dust reduction than conventional chloride treatments with respect to time. However,the disadvantage is that there is not the initial dramatic reduction in dust generation as with the chloride treatment. Although dust is reduced 30-40% after treatment there is still dust being generated and the traveling public or residents may not perceive the reduction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project was directed at laboratory and field evaluation of sodium montmorillonite clay (Bentonite) as a dust palliative for limestone surfaced secondary roads. It was postulated that the electrically charged surfaces (negative) of the clay particles could interact with the charged surfaces (positive) of the limestone and act as a bonding agent to agglomerate fine (-#200) particulates, and also to bond the fine particulates to larger (+#200) limestone particles. One mile test roads were constructed in Tama, Appanoose, and Hancock counties in Iowa using Bentonite treatment levels (by weight of aggregate) ranging from 3.0 to 12.0%. Construction was accomplished by adding dry Bentonite to the surfacing material and then dry road mixing. The soda ash/water solution (dispersing agent) was spray applied and the treated surfacing material wet mixed by motor graders to a consistency of 2 to 3 inch slump concrete. Two motor graders working in tandem provided rapid mixing. Following wet mixing the material was surface spread and compacted by local traffic. Quantitative and qualitative periodic evaluations and testing of the test roads was conducted with respect to dust generation, crust development, roughness, and braking characteristics. As the Bentonite treatment level increased dust generation decreased. From a cost/benefit standpoint, an optimum level of treatment is about 8% (by weight of aggregate). For roads with light traffic, one application at this treatment level resulted in a 60-70% average dust reduction in the first season, 40-50% in the second season, and 20-30% in the third season. Crust development was rated at two times better than untreated control sections. No discernible trend was evident with respect to roughness. There was no evident difference in any of the test sections with respect to braking distance and braking handling characteristics, under wet surface conditions compared to the control sections. Chloride treatments are more effective in dust reduction in the short term (3-4 months). Bentonite treatment is capable of dust reduction over the long term (2-3 seasons). Normal maintenance blading operations can be used on Bentonite treated areas. Soda ash dispersed Bentonite treatment is estimated to be more than twice as cost effective per percent dust reduction than conventional chloride treatments, with respect to time. However, the disadvantage is that there is not the initial dramatic reduction in dust generation as with the chloride treatment. Although dust is reduced significantly after treatment there is still dust being generated. Video evidence indicates that the dust cloud in the Bentonite treated sections does not rise as high, or spread as wide as the cloud in the untreated section. It also settles faster than the cloud in the untreated section. This is considered important for driving safety of following traffic, and for nuisance dust invasion of residences and residential areas. The Bentonite appears to be functioning as a bonding agent.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A Guidebook for First Responders During the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident.