4 resultados para Infrastructure and Construction Projects

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In August, 1994, the Office of Local Systems, Project Development Division, Iowa Department of Transportation established a Quality Improvement Team to review and improve upon the federal-aid project development process. The mission was to communicate federal-aid project development procedures to local agencies, beginning with the approval of the Statewide Transportation Improvement Program (STIP) and ending with obligation of federal funds by the Federal Highway Administration (FHWA). In January 1997, another Team (Make it Better) began meeting to clarify, update, and streamline the federal-aid project process. This Project Development Packet is a compilation of these efforts. The packet includes Project Development timelines, flow charts, guidelines, design criteria, Instructional Memorandums and forms to assist in the federal-aid project development process. The main (fold out) flow chart directs to other sections of the packet when appropriate.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Laser scanning is a terrestrial laser-imaging system that creates highly accurate three-dimensional images of objects for use in standard computer-aided design software packages. This report describes results of a pilot study to investigate the use of laser scanning for transportation applications in Iowa. After an initial training period on the use of the scanner and Cyclone software, pilot tests were performed on the following projects: intersection and railroad bridge for training purposes; section of highway to determine elevation accuracy and pair of bridges to determine level of detail that can be captured; new concrete pavement to determine smoothness; bridge beams to determine camber for deck-loading calculations; stockpile to determine volume; and borrow pit to determine volume. Results show that it is possible to obtain 2-6 mm precision with the laser scanner as claimed by the manufacturer compared to approximately one-inch precision with aerial photogrammetry using a helicopter. A cost comparison between helicopter photogrammetry and laser scanning showed that laser scanning was approximately 30 percent higher in cost depending on assumptions. Laser scanning can become more competitive to helicopter photogrammetry by elevating the scanner on a boom truck and capturing both sides of a divided roadway at the same time. Two- and three-dimensional drawings were created in MicroStation for one of the scanned highway bridges. It was demonstrated that it is possible to create such drawings within the accuracy of this technology. It was discovered that a significant amount of time is necessary to convert point cloud images into drawings. As this technology matures, this task should become less time consuming. It appears that laser scanning technology does indeed have a place in the Iowa Department of Transportation design and construction toolbox. Based on results from this study, laser scanning can be used cost effectively for preliminary surveys to develop TIN meshes of roadway surfaces. It also appears that this technique can be used quite effectively to measure bridge beam camber in a safer and quicker fashion compared to conventional approaches. Volume calculations are also possible using laser scanning. It seems that measuring quantities of rock could be an area where this technology would be quite beneficial since accuracy is more important with this material compared to soil. Other applications for laser scanning could include developing as-built drawings of historical structures such as the bridges of Madison County. This technology could also be useful where safety is a concern such as accurately measuring the surface of a highway active with traffic or scanning the underside of a bridge damaged by a truck. It is recommended that the Iowa Department of Transportation initially rent the scanner when it is needed and purchase the software. With time, it may be cost justifiable to purchase the scanner as well. Laser scanning consultants can be hired as well but at a higher cost.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This Handbook has been prepared by the Iowa DOT as a guide and supplement to the MUTCD. It provides in one document a large number of illustrations which can be easily adapted to specific conditions by field personnel. It is intended to supersede all previous non-conforming standards now being used throughout the state and to provide uniform guidelines for all agencies, public and private, who must conduct construction and maintenance activities on the streets and highways of the state. The illustrations contained herein serve as a quick reference for field personnel to follow, however, no amount of detailed instructions can adequately cover every situation. For this reason, sound judgment is required in using these illustrations to cover actual field conditions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A key component of Iowa’s transportation system is the public roadway system owned and maintained by the state, cities and counties. In order to regularly evaluate the conditions of Iowa’s public roadway infrastructure and assess the ability of existing revenues to meet the needs of the system, the Iowa Department of Transportation’s 2006 Road Use Tax Fund (RUTF) report to the legislature included a recommendation that a study be conducted every five years. That recommendation was included in legislation adopted in 2007 and signed into law. The law specifically requires the following (2016 Iowa Code Section 307.31):  “The department shall periodically review the current revenue levels of the road use tax fund and the sufficiency of those revenues for the projected construction and maintenance needs of city, county, and state governments in the future. The department shall submit a written report to the general assembly regarding its findings by December 31 every five years, beginning in 2011. The report may include recommendations concerning funding levels needed to support the future mobility and accessibility for users of Iowa's public road system.”  “The department shall evaluate alternative funding sources for road maintenance and construction and report to the general assembly at least every five years on the advantages and disadvantages and the viability of alternative funding mechanisms.” To comply with this requirement, the Iowa Department of Transportation (DOT) prepared a 2011 RUTF Study (www.iowadot.gov/pdf_files/RUTFStudy2011.pdf). This study relied heavily on the work of the Governor’s Transportation 2020 Citizen Advisory Commission (CAC), established by Governor Terry E. Branstad to assist the Iowa DOT as it assessed the condition of Iowa’s roadway system and evaluated current and future funding available to best address system needs. The 2011 RUTF Study ultimately led to the passage of Senate File 257 in the 2015 legislative session that was signed into law on February 25, 2015. The major component of this bill was the increase of the state fuel tax rate on March 1, 2015, in order to meet the critical need funding shortfall identified in the study. With the recent increase in the state fuel tax rate, jurisdictions across Iowa are now putting those additional funds into road and bridge construction projects. With one full construction season complete following the increase in funding, it is difficult to accurately assess the long-term impact on construction needs. Therefore, this 2016 RUTF Study focuses on the actions taken since the 2011 RUTF Study and on alternative funding mechanisms.