5 resultados para Incentive theory

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The issue of effectively holding juveniles accountable for criminal behavior is a topic of public concern and debate. Congress created the Juvenile Accountability Incentive Block Grant (JAIBG) program and appropriated new federal funds through the Office of Juvenile Justice and Delinquency Prevention (OJJDP). The goals of the program are to reduce juvenile delinquency, improve the juvenile justice system, and increase accountability for juvenile offenders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on the Early Out Incentive (EOI) programs, including a Buy Out Program, for the period November 20, 2001 through February 28, 2006

Relevância:

20.00% 20.00%

Publicador:

Resumo:

During the 2005 Legislative Session the Iowa Department of Revenue received an appropriation to establish the Tax Credits Tracking and Analysis Program (TCTAP) to track tax credit awards and claims. In addition, the Department was directed to perform periodic evaluations of tax credit programs. The purpose of these studies is three-fold: (1) To provide a comparison of the Iowa tax credit program to similar federal and other states’ programs (2) To summarize information related to the usage of the Iowa tax credit (3) To evaluate the economic impact of the tax credit program.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is an urgent need to complete projects in high traffic urban areas in the shortest possible time. These road user benefits resulting from faster construction will minimize public inconvenience, safety hazards and a total cost to the public. The incentive - disincentive clause in the contract will encourage the contractor to expedite all phases in the contract. A copy of this special provision is part of this work plan and other details of construction are included in the plan and specification of Project F-65-4(34)--20-77.