25 resultados para INTEGRAL SOLUTIONS

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The highway departments of all fifty states were contacted to find the extent of application of integral abutment bridges, to survey the different guidelines used for analysis and design of integral abutment bridges, and to assess the performance of such bridges through the years. The variation in design assumptions and length limitations among the various states in their approach to the use of integral abutments is discussed. The problems associated with lateral displacements at the abutment, and the solutions developed by the different states for most of the ill effects of abutment movements are summarized in the report. An algorithm based on a state-of-the-art nonlinear finite element procedure was developed and used to study piling stresses and pile-soil interaction in integral abutment bridges. The finite element idealization consists of beam-column elements with geometric and material nonlinearities for the pile and nonlinear springs for the soil. An idealized soil model (modified Ramberg-Osgood model) was introduced in this investigation to obtain the tangent stiffness of the nonlinear spring elements. Several numerical examples are presented in order to establish the reliability of the finite element model and the computer software developed. Three problems with analytical solutions were first solved and compared with theoretical solutions. A 40 ft H pile (HP 10 X 42) in six typical Iowa soils was then analyzed by first applying a horizontal displacement (to simulate bridge motion) and no rotation at the top and then applying a vertical load V incrementally until failure occurred. Based on the numerical results, the failure mechanisms were generalized to be of two types: (a) lateral type failure and (b) vertical type failure. It appears that most piles in Iowa soils (sand, soft clay and stiff clay) failed when the applied vertical load reached the ultimate soil frictional resistance (vertical type failure). In very stiff clays, however, the lateral type failure occurs before vertical type failure because the soil is sufficiently stiff to force a plastic hinge to form in the pile as the specified lateral displacement is applied. Preliminary results from this investigation showed that the vertical load-carrying capacity of H piles is not significantly affected by lateral displacements of 2 inches in soft clay, stiff clay, loose sand, medium sand and dense sand. However, in very stiff clay (average blow count of 50 from standard penetration tests), it was found that the vertical load carrying capacity of the H pile is reduced by about 50 percent for 2 inches of lateral displacement and by about 20 percent for lateral displacement of 1 inch. On the basis of the preliminary results of this investigation, the 265-feet length limitation in Iowa for integral abutment concrete bridges appears to be very conservative.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a nationwide need for a safe, efficient and cost effective transportation system. An essential component of this system is the bridges. Local agencies perhaps have an even greater task than federal and state agencies in maintaining the low volume road (LVR) bridge system due to lack of sufficient resources and funding. The primary focus of this study was to review the various aspects of off-system bridge design, rehabilitation, and replacement. Specifically, a reference report was developed to address common problems in LVR bridges. The source of information included both Iowa and national agencies. This report is intended to be a “user manual” or “tool box” of information, procedures and choices for county engineers to employ in the management of their bridge inventory plus identify areas and problems that need to be researched

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Rock Creek Lake is at risk. The centerpiece of Rock Creek State Park in Jasper County, Rock Creek Lake offers visitors a range of recreational opportunities, including the second busiest campground in Iowa and great fishing. However, many different factors are threatening the lake. Action is being taken to improve the lake for today’s visitors and to preserve the lake for future generations. GIS mapping is helping to make those improvements possible.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of precast, prestressed concrete piles in the foundation of bridge piers has long been recognized as a valuable option for bridge owners and designers. However, the use of these precast, prestressed concrete piles in integral abutment bridges has not been widespread because of concerns over pile flexibility and the potential for concrete cracking and deterioration of the prestressing strands due to long-term exposure to moisture. This report presents the details of the first integral abutment bridge in the state of Iowa that utilized precast, prestressed concrete piles in the abutment. The bridge, which was constructed in Tama County in 2000, consists of a 110 ft. long, 30 ft. wide, single-span PC girder superstructure with a left-side-ahead 20º skew angle. The bridge was instrumented with a variety of strain gages, displacement sensors, and thermocouples to monitor and help in the assessment of structural behavior. The results of this monitoring are presented, and recommendations are made for future application of precast, prestressed concrete piles in integral abutment bridges. In addition to the structural monitoring data, this report presents the results of a survey questionnaire that had been mailed to each of the 50 state DOT chief bridge engineers to ascertain their current practices for precast, prestressed concrete piles and especially the application of these piles in integral abutment bridges.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Despite many successful projects, some public agencies and contractors have been hesitant to use concrete overlays. This lack of confidence has been based on a number of factors, including the misperception that concrete overlays are expensive or difficult to build. This guide will help readers understand concrete overlays and develop confidence in their application. The guide provides the key elements of the six major types of concrete overlays along with specifics on materials, typical sections, and important construction elements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Young women in the juvenile justice system present with characteristics and experiences that differentiate them from their male counterparts. As such, the juvenile justice system in Iowa must consider these factors if it is to effectively and efficiently impact recidivism, rehabilitation and public safety. Data reveal the following trends: All youth in the juvenile justice system experience a significantly higher rate of child maltreatment than do youth in the general population. Additionally, young women have a distinctly higher percentage of reported sexual abuse. Young women commit primarily non-violent offenses, with shoplifting and running away being the only two areas where they exceed young men in number. Young women are held in detention for a substantially higher percentage of misdemeanor versus felony offenses than young men. Young women of color, particularly African American females, are far more likely to come into contact with the juvenile justice system. Additionally, arrests of minority females have increased during the same time frame as arrests of Caucasian females have decreased. The general type of offense committed by young women is against public order (i.e. alcohol related violations, disorderly conduct) or property (i.e. shoplifting), though young women with subsequent charges of a violent nature are likely to have had violent offenses initially as well. Historically, young women have been a smaller segment of the juvenile justice population. They remain so today. Consequently, they are easy to overlook. But Iowa’s response to them is no less important. Perhaps, because they are fewer in number, our system can have a true and meaningful influence, with prevention of further penetration into both the juvenile and adult systems being the ultimate goal. The Iowa Task Force on Young Women recommends the following measures to facilitate movement toward that goal: 1. Facilities and programs striving to provide the most effective and efficient services to young women will opt for single gender environments with female responsive programming that includes components to address trauma. 2. All institutions and agencies that work with females involved in the juvenile justice system and which receive state funding should be required to provide annual female responsive training to their employees. Training should be research based, progressive, ongoing and result in an implementation plan. 3. As detention reform proceeds, gender and the disproportionate number of females in detention for misdemeanor offenses must be an integral part of policy and decision making discussions including any recommendations for solutions to be implemented. 4. As research, data and planning progresses related to disproportionate minority contact with the juvenile system, the needs of girls of color be given equal consideration. Specifically, assessment tools must be without race/ethnic bias and they must also be female responsive.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The transportation system is in demand 24/7 and 365 days a year irrespective of neither the weather nor the conditions. Iowa’s transportation system is an integral and essential part of society serving commerce and daily functions of all Iowans across the state. A high quality transportation system serves as the artery for economic activity and, the condition of the infrastructure is a key element for our future growth opportunities. A key component of Iowa’s transportation system is the public roadway system owned and maintained by the state, cities and counties. In order to regularly re-evaluate the conditions of Iowa’s public roadway infrastructure and assess the ability of existing revenues to meet the needs of the system, the Iowa Department of Transportation’s 2006 Road Use Tax Fund (RUTF) report to the legislature included a recommendation that a study be conducted every five years. That recommendation was included in legislation adopted in 2007 and signed into law. The law specifically requires the following (2011 Iowa Code Section 307.31): •“The department shall periodically review the current revenue levels of the road use tax fund and the sufficiency of those revenues for the projected construction and maintenance needs of city, county, and state governments in the future. The department shall submit a written report to the general assembly regarding its findings by December 31 every five years, beginning in 2011. The report may include recommendations concerning funding levels needed to support the future mobility and accessibility for users of Iowa's public road system.” •“The department shall evaluate alternative funding sources for road maintenance and construction and report to the general assembly at least every five years on the advantages and disadvantages and the viability of alternative funding mechanisms.” Consistent with this requirement, the Iowa Department of Transportation (DOT) has prepared this study. Recognizing the importance of actively engaging with the public and transportation stakeholders in any discussion of public roadway conditions and needs, Governor Terry E. Branstad announced on March 8, 2011, the creation of, and appointments to, the Governor’s Transportation 2020 Citizen Advisory Commission (CAC). The CAC was tasked with assisting the Iowa DOT as they assess the condition of Iowa’s roadway system and evaluate current and future funding available to best address system needs. In particular the CAC was directed to gather input from the public and stakeholders regarding the condition of Iowa’s public roadway system, the impact of that system, whether additional funding is needed to maintain/improve the system, and, if so, what funding mechanisms ought to be considered. With this input, the CAC prepared a report and recommendations that were presented to Governor Branstad and the Iowa DOT in November 2011 for use in the development of this study. The CAC’s report is available at www.iowadot.gov/transportation2020/pdfs/CAC%20REPORT%20FINAL%20110211.pdf. The CAC’s report was developed utilizing analysis and information from the Iowa DOT. Therefore, the report forms the basis for this study and the two documents are very similar. Iowa is fortunate to have an extensive public roadway system that provides access to all areas of the state and facilitates the efficient movement of goods and people. However, it is also a tremendous challenge for the state, cities and counties to maintain and improve this system given flattening revenue, lost buying power, changing demands on the system, severe weather, and an aging system. This challenge didn’t appear overnight and for the last decade many studies have been completed to look into the situation and the legislature has taken significant action to begin addressing the situation. In addition, the Iowa DOT and Iowa’s cities and counties have worked jointly and independently to increase efficiency and streamline operations. All of these actions have been successful and resulted in significant changes; however, it is apparent much more needs to be done. A well-maintained, high-quality transportation system reduces transportation costs and provides consistent and reliable service. These are all factors that are critical in the evaluation companies undertake when deciding where to expand or locate new developments. The CAC and Iowa DOT heard from many Iowans that additional investment in Iowa’s roadway system is vital to support existing jobs and continued job creation in the state of Iowa. Beginning June 2011, the CAC met regularly to review material and discuss potential recommendations to address Iowa’s roadway funding challenges. This effort included extensive public outreach with meetings held in seven locations across Iowa and through a Transportation 2020 website hosted by the Iowa DOT (www.iowadot.gov/transportation2020). Over 500 people attended the public meetings held through the months of August and September, with 198 providing verbal or written comment at the meetings or through the website. Comments were received from a wide array of individuals. The public comments demonstrated overwhelming support for increased funding for Iowa’s roads. Through the public input process, several guiding principles were established to guide the development of recommendations. Those guiding principles are: • Additional revenues are restricted for road and bridge improvements only, like 95 percent of the current state road revenue is currently. This includes the fuel tax and registration fees. • State and local governments continue to streamline and become more efficient, both individually and by looking for ways to do things collectively. • User fee concept is preserved, where those who use the roads pay for them, including non¬residents. • Revenue-generating methods equitable across users. • Increase revenue generating mechanisms that are viable now but begin to implement and set the stage for longer-term solutions that bring equity and stability to road funding. • Continue Iowa’s long standing tradition of state roadway financing coming from pay-as-you-go financing. Iowa must not fall into the situation that other states are currently facing where the majority of their new program dollars are utilized to pay the debt service of past bonding. Based on the analysis of Iowa’s public roadway needs and revenue and the extensive work of the Governor’s Transportation 2020 Citizen Advisory Commission, the Iowa DOT has identified specific recommendations. The recommendations follow very closely the recommendations of the CAC (CAC recommendations from their report are repeated in Appendix B). Following is a summary of the recommendations which are fully documented beginning on page 21. 1. Through a combination of efficiency savings and increased revenue, a minimum of $215 million of revenue per year should be generated to meet Iowa’s critical roadway needs. 2. The Code of Iowa should be changed to require the study of the sufficiency of the state’s road funds to meet the road system’s needs every two years instead of every five years to coincide with the biennial legislative budget appropriation schedule. 3.Modify the current registration fee for electric vehicles to be based on weight and value using the same formula that applies to most passenger vehicles. 4.Consistent with existing Code of Iowa requirements, new funding should go to the TIME-21 Fund up to the cap ($225 million) and remaining new funding should be distributed consistent with the Road Use Tax Fund distribution formula. 5.The CAC recommended the Iowa DOT at least annually convene meetings with cities and counties to review the operation, maintenance and improvement of Iowa’s public roadway system to identify ways to jointly increase efficiency. In direct response to this recommendation, Governor Branstad directed the Iowa DOT to begin this effort immediately with a target of identifying $50 million of efficiency savings that can be captured from the over $1 billion of state revenue already provided to the Iowa DOT and Iowa’s cities and counties to administer, maintain and improve Iowa’s public roadway system. This would build upon past joint and individual actions that have reduced administrative costs and resulted in increased funding for improvement of Iowa’s public roadway system. Efficiency actions should be quantified, measured and reported to the public on a regular basis. 6.By June 30, 2012, Iowa DOT should complete a study of vehicles and equipment that use Iowa’s public roadway system but pay no user fees or substantially lower user fees than other vehicles and equipment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This guide provides a clear, concise, and cohesive presentation of cement-bound materials options for 10 specific engineering pavement applications: new concrete pavements, concrete overlays, previous concrete, precast pavements, roller-compacted concrete, cement-treated base, full-depth reclamation with cement, cement-modified soils, recycled concrete aggregates, and repair and restoration. Each application is presented as a method for meeting specific design and construction objectives that today’s pavement practitioners must accomplish. The benefits, considerations, brief description, and summary of materials, design, and construction requirements, as well as a list of sustainable attributes, are provided for every solution. This guide is intended to be short, simple, and easy to understand. It was designed so that the most up-to-date and relevant information is easily extractable. It is not intended to be used as a design guide for any of the applications identified herein. Recommendations for additional information that can provide such details are given at the end of each solution discussion. The intended audience is practitioners, including engineers and managers who face decisions regarding what materials to specify in the pavement systems they design or manage. The audience also includes city and county engineers, along with the A/E firms that often represent them, and state DOT engineers at all levels who are seeking alternatives in this era of changing markets.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation has long recognized that approach slab pavements of integral abutment bridges are prone to settlement and cracking, which manifests as the “bump at the end of the bridge”. A commonly recommended solution is to integrally attach the approach slab to the bridge abutment. Two different approach slabs, one being precast concrete and the other being cast-inplace concrete, were integrally connected to side-by-side bridges and investigated. The primary objective of this investigation was to evaluate the approach slab performance and the impacts the approach slabs have on the bridge. To satisfy the research needs, the project scope involved a literature review, survey of Midwest Department of Transportation current practices, implementing a health monitoring system on the bridge and approach slab, interpreting the data obtained during the evaluation, and conducting periodic visual inspections. Based on the information obtained from the testing the following general conclusions were made: The integral connection between the approach slabs and the bridges appear to function well with no observed distress at this location and no relative longitudinal movement measured between the two components; Tying the approach slab to the bridge appears to impact the bridge; The two different approach slabs, the longer precast slab and the shorter cast-in-place slab, appear to impact the bridge differently; The measured strains in the approach slabs indicate a force exists at the expansion joint and should be taken into consideration when designing both the approach slab and the bridge; The observed responses generally followed an annual cyclic and/or short term cyclic pattern over time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approach slab pavement at integral abutment (I-A) bridges are prone to settlement and cracking, which has been long recognized by the Iowa Department of Transportation (DOT). A commonly recommended solution is to integrally attach the approach slab to the bridge abutment. This study sought to supplement a previous project by instrumenting, monitoring, and analyzing the behavior of an approach slab tied to a integral abutment bridge. The primary objective of this investigation was to evaluate the performance of the approach slab. To satisfy the research needs, the project scope involved reviewing a similar previous study, implementing a health monitoring system on the approach slab, interpreting the data obtained during the evaluation, and conducting periodic visual inspections of the bridge and approach slab. Based on the information obtained from the testing, the following general conclusions were made: the integral connection between the approach slab and the bridge appears to function well with no observed distress at this location and no relative longitudinal movement measured between the two components; the measured strains in the approach slabs indicate a force exists at the expansion joint and should be taken into consideration when designing both the approach slab and the bridge and the observed responses generally followed an annual cyclic and/or short term cyclic pattern over time; the expansion joint at one side of the approach slab does not appear to be functioning as well as elsewhere; much larger frictional forces were observed in this study compared to the previous study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Soil slope instability concerning highway infrastructure is an ongoing problem in Iowa, as slope failures endanger public safety and continue to result in costly repair work. Characterization of slope failures is complicated, because the factors affecting slope stability can be difficult to discern and measure, particularly soil shear strength parameters. While in the past extensive research has been conducted on slope stability investigations and analysis, this research consists of field investigations addressing both the characterization and reinforcement of such slope failures. The current research focuses on applying an infrequently-used testing technique comprised of the Borehole Shear Test (BST). This in-situ test rapidly provides effective (i.e., drained) shear strength parameter values of soil. Using the BST device, fifteen Iowa slopes (fourteen failures and one proposed slope) were investigated and documented. Particular attention was paid to highly weathered shale and glacial till soil deposits, which have both been associated with slope failures in the southern Iowa drift region. Conventional laboratory tests including direct shear tests, triaxial compression tests, and ring shear tests were also performed on undisturbed and reconstituted soil samples to supplement BST results. The shear strength measurements were incorporated into complete evaluations of slope stability using both limit equilibrium and probabilistic analyses. The research methods and findings of these investigations are summarized in Volume 1 of this report. Research details of the independent characterization and reinforcement investigations are provided in Volumes 2 and 3, respectively. Combined, the field investigations offer guidance on identifying the factors that affect slope stability at a particular location and also on designing slope reinforcement using pile elements for cases where remedial measures are necessary. The research findings are expected to benefit civil and geotechnical engineers of government transportation agencies, consultants, and contractors dealing with slope stability, slope remediation, and geotechnical testing in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Soil slope instability concerning highway infrastructure is an ongoing problem in Iowa, as slope failures endanger public safety and continue to result in costly repair work. While in the past extensive research has been conducted on slope stability investigations and analysis, this current research study consists of field investigations addressing both the characterization and reinforcement of such slope failures. While Volume I summarizes the research methods and findings of this study, Volume II provides procedural details for incorporating an infrequently-used testing technique, borehole shear tests, into practice. Fifteen slopes along Iowa highways were investigated, including thirteen slides (failed slopes), one unfailed slope, and one proposed embankment slope (the Sugar Creek Project). The slopes are mainly comprised of either clay shale or glacial till, and are generally gentle and of small scale, with slope angle ranging from 11 deg to 23 deg and height ranging from 6 to 23 m. Extensive field investigations and laboratory tests were performed for each slope. Field investigations included survey of slope geometry, borehole drilling, soil sampling, in-situ Borehole Shear Testing (BST) and ground water table measurement. Laboratory investigations mainly comprised of ring shear tests, soil basic property tests (grain size analysis and Atterberg limits test), mineralogy analyses, soil classifications, and natural water contents and density measurements on the representative soil samples from each slope. Extensive direct shear tests and a few triaxial compression tests and unconfined compression tests were also performed on undisturbed soil samples for the Sugar Creek Project. Based on the results of field and lab investigations, slope stability analysis was performed on each of the slopes to determine the possible factors resulting in the slope failures or to evaluate the potential slope instabilities using limit equilibrium methods. Deterministic slope analyses were performed for all the slopes. Probabilistic slope analysis and sensitivity study were also performed for the slope of the Sugar Creek Project. Results indicate that while the in-situ test rapidly provides effective shear strength parameters of soils, some training may be required for effective and appropriate use of the BST. Also, it is primarily intended to test cohesive soils and can produce erroneous results in gravelly soils. Additionally, the quality of boreholes affects test results, and disturbance to borehole walls should be minimized before test performance. A final limitation of widespread borehole shear testing may be its limited availability, as only about four to six test devices are currently being used in Iowa. Based on the data gathered in the field testing, reinforcement investigations are continued in Volume III.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Soil slope instability concerning highway infrastructure is an ongoing problem in Iowa, as slope failures endanger public safety and continue to result in costly repair work. Volume I of this current study summarizes research methods and findings, while Volume II provides procedural details for incorporating into practice an infrequently-used testing technique–borehole shear tests. Volume III of this study of field investigation of fifteen slopes in Iowa demonstrates through further experimental testing how lateral forces develop along stabilizing piles to resist slope movements. Results establish the feasibility of an alternative stabilization approach utilizing small-diameter pile elements. Also, a step-by-step procedure that can be used by both state and county transportation agencies to design slope reinforcement using slender piles is documented. Initial evidence of the efficiency and cost-effectiveness of stabilizing nuisance slope failures with grouted micropiles is presented. Employment of the remediation alternative is deemed more appropriate for stabilizing shallow slope failures. Overall, work accomplished in this research study included completing a comprehensive literature review on the state of the knowledge of slope stability and slope stabilization, the preparation and performance of fourteen full-scale pile load tests, the analysis of load test results, and the documentation of a design methodology for implementing the technology into current practices of slope stabilization. Recommendations for further research include monitoring pilot studies of slope reinforcement with grouted micropiles, supplementary experimental studies, and advanced numerical studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Expansion joints increase both the initial cost and the maintenance cost of bridges. Integral abutment bridges provide an attractive design alternative because expansion joints are eliminated from the bridge itself. However, the piles in these bridges are subjected to horizontal movement as the bridge expands and contracts during temperature changes. The objective of this research was to develop a method of designing piles for these conditions. Separate field tests simulating a pile and a bridge girder were conducted for three loading cases: (1) vertical load only, (2) horizontal displacement of pile head only, and (3) combined horizontal displacement of pile head with subsequent vertical load. Both tests (1) and (3) reached the same ultimate vertical load, that is, the horizontal displacement had no effect on the vertical load capacity. Several model tests were conducted in sand with a scale factor of about 1:10. Experimental results from both the field and model tests were used to develop the vertical and horizontal load-displacement properties of the soil. These properties were input into the finite element computer program Integral Abutment Bridge Two-Dimensional (IAB2D), which was developed under a previous research contract. Experimental and analytical results compared well for the test cases. Two alternative design methods, both based upon the American Association of State Highway and Transportation Officials (AASHTO) Specification, were developed. Alternative One is quite conservative relative to IAB2D results and does not permit plastic redistribution of forces. Alternative Two is also conservative when compared to IAB2D, but plastic redistribution is permitted. To use Alternative Two, the pile cross section must have sufficient inelastic rotation capacity before local buckling occurs. A design example for a friction pile and an end-bearing pile illustrates both alternatives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since integral abutment bridges decrease the initial and maintenance costs of bridges, they provide an attractive alternative for bridge designers. The objective of this project is to develop rational and experimentally verified design recommendations for these bridges. Field testing consisted of instrumenting two bridges in Iowa to monitor air and bridge temperatures, bridge displacements, and pile strains. Core samples were also collected to determine coefficients of thermal expansion for the two bridges. Design values for the coefficient of thermal expansion of concrete are recommended, as well as revised temperature ranges for the deck and girders of steel and concrete bridges. A girder extension model is developed to predict the longitudinal bridge displacements caused by changing bridge temperatures. Abutment rotations and passive soil pressures behind the abutment were neglected. The model is subdivided into segments that have uniform temperatures, coefficients of expansion, and moduli of elasticity. Weak axis pile strains were predicted using a fixed-head model. The pile is idealized as an equivalent cantilever with a length determined by the surrounding soil conditions and pile properties. Both the girder extension model and the fixed-head model are conservative for design purposes. A longitudinal frame model is developed to account for abutment rotations. The frame model better predicts both the longitudinal displacement and weak axis pile strains than do the simpler models. A lateral frame model is presented to predict the lateral motion of skewed bridges and the associated strong axis pile strains. Full passive soil pressure is assumed on the abutment face. Two alternatives for the pile design are presented. Alternative One is the more conservative and includes thermally induced stresses. Alternative Two neglects thermally induced stresses but allows for the partial formation of plastic hinges (inelastic redistribution of forces). Ductility criteria are presented for this alternative. Both alternatives are illustrated in a design example.