3 resultados para Film aesthetic
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Special investigation of the Iowa Department of Economic Development Film Office and the Film, Television and Video Production Promotion Program for the period May 17, 2007 through September 21, 2009
Resumo:
The film depicts period traffic congestion, sharp and winding sections of road, steep hills making trucks slow to a crawl, and dangerous vehicle and pedestrian crossings, all important reasons why highway design and safety improvements, and highway relocation were needed. In fact, when the film was produced, U.S. 30 or the Lincoln Highway was the busiest primary road in Iowa; and the section between State Center and Boone was deemed “critical,” meaning it was considered dangerous by the ISHC’s Efficiency Standards.
Resumo:
The I-74 Aesthetic Design Guideline (ADG) document has two primary goals: To establish and identify an overall design theme To prioritize enhancement opportunities within the framework of corridor elements The recommendations of this report have been developed based on an “unconstrained” framework for future corridor–wide enhancements. Future funding availability, along with the recommendations of this report, will guide the final design process. ADG Future Uses: This document is intended to be used as a reference to future processes in the following ways: Guidance for I-74 final design teams Reference document for future local community redevelopment initiatives Inspiration for identification and development of other I-74 corridor aesthetic enhancement opportunities Process: As illustrated in Figure 1.3, the overall process for corridor aesthetics began traditionally with inventory and identification of potential aesthetic applications. The ADG does not document all the reports and presentations related to these early design stages, but has incorporated these efforts into the design theme, guiding principles and prioritized enhancements shown on the following pages of this report. The I-74 final design phase will incorporate these recommendations into the project. The consultant design team and representatives of the DOTs have worked with the CAAT members to facilitate community input and have helped develop recommendations for improving I-74 corridor aesthetics. CAAT recommendations have been advanced to the I-74 Advisory Committee for review and endorsement. Both DOTs have reviewed the CAAT recommendations and have endorsed the contents of this report. Figure 1.4 illustrates the status of corridor aesthetic design development. As of the date of this report, aesthetic design is approximately 50% complete. Future detailed design, cost evaluation, feasibility and prioritizations all need to occur for this process to be successfully completed.