12 resultados para Fígado gordo não alcoólico

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

County Profile

Relevância:

20.00% 20.00%

Publicador:

Resumo:

DESCRIPTION OF PROPOSED ACTION This Environmental Assessment (EA) has been prepared in compliance with the requirements of the National Environmental Policy Act of 1969 (NEPA). This EA informs the public and interested agencies of the proposed action and alternatives to the proposed action in order to gather feedback on the improvements under consideration. Proposed Action The Iowa Department of Transportation (Iowa DOT) and the Federal Highway Administration (FHWA) are evaluating potential alternatives to improve IA 122 in the City of Mason City. IA 122/Business US 18 is a primary east-west travel route through the City that transitions from a 4- lane undivided roadway, to 2-lane one-way pairs, then back to a 4-lane undivided roadway (Figure 1-1). The Iowa DOT proposes to flatten the tight reverse curves on the east end of the project. The one-way pairs will be narrowed by eliminating on-street parking along the corridor to more clearly define travel lanes. This will serve to calm traffic flows and reduce crashes along the highway. Additionally, improvements to intersections as well as consolidating or removing access points to improve traffic operations are proposed within the project corridor. A new access road for the Mason City Fire Department on the west end of the project will allow emergency trucks better access to travel south and east. Study Area The primary area of investigation for the Project is generally bounded by IA 122 through Mason City, known locally as 5th and 6th Street Southwest from South Monroe Avenue to South Carolina Avenue. US 65, known locally as Federal Avenue, bisects the study area. At this intersection of US 65 and Iowa 122, the 5th and 6th Street SW changes to 5th and 6th St SE. For the purposes of this discussion, this area will be referred to collectively as the IA 122 corridor. The Study Area boundaries were established to allow the development of a wide range of alternatives that could address the purpose and need for the project. The Study Area is larger than the area proposed for construction activities for the Project. However, some impacts may extend beyond the Study Area; where this occurs, it will be noted and addressed in the Environmental Analysis Section (Section 5). Figure 1-1 outlines the Study Area of the proposed action.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a special investigation of the Cerro Gordo County Management Information Systems (MIS) Department for the period January 1, 2008 through July 31, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purposes of this report are to delineate and describe aquifers in Cerro Gordo County, evaluate the availability and quality of water in the aquifers, supply data on ground-water utilization, and determine the rate of growth and the magnitude of the cone of drawdown in the Mason City area. It includes photos and fold-out maps

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on a review of the operations of the Cerro Gordo County Treasurer’s Office, Motor Vehicle Department for the period January 1, 2013 through June 30, 2015

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this report is to compile and update the prior studies in order to select viable alternatives for inclusion in the Environmental Assessment to be prepared for this project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Research project HR-231, "Special Surface Preparation Prior to Bituminous Overlay", was initiated in 1982 to study the effectiveness of three different crack fillers in extending pavement life. In particular, this project was designed to determine if any of the fillers could substantially reduce the rate of subsurface deterioration and general deterioration of an asphalt pavement at crack locations. This project also sought to determine the effects of the various crack filling procedures on different thicknesses of bituminous overlays. The three fillers, a fly ash slurry, an emulsion, and a rubberized asphalt mixture, were used along with a control section with no crack filler material on a 2.5 mile section of Cerro Gordo Trunk Route S-25 south of the town of Thornton. This report discusses the construction and performance of each filler material and makes recommendations concerning future use of any of the materials used.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The need to upgrade understrength bridges in the United States has been well documented in the literature. The concept of strengthening steel stringer bridges in Iowa has been developed through several Iowa DOT projects. The objective of the project described in this report was to investigate the use of one such strengthening system on a three-span continuous steel stringer bridge in the field. In addition, a design methodology was developed to assist bridge engineers with designing a strengthening system to obtain the desired stress reductions. The bridge selected for strengthening was in Cerro Gordo County near Mason City, Iowa on County Road B65. The strengthening system was designed to remove overstresses that occurred when the bridge was subjected to Iowa legal loads. A two part strengthening system was used: post-tensioning the positive moment regions of all the stringers and superimposed trusses in the negative moment regions of the two exterior stringers at the two piers. The strengthening system was installed in the summers of 1992 and 1993. In the summer of 1993, the bridge was load tested before and after the strengthening system was activated. The load test results indicate that the strengthening system was effective in reducing the overstress in both the negative and positive regions of the stringers. The design methodology that was developed includes a procedure for determining the magnitude of post-tensioning and truss forces required to strengthen a given bridge. This method utilizes moment and force fractions to determine the distribution of strengthening axial forces and moments throughout the bridge. Finite element analysis and experimental results were used in the formulation and calibration of the methodology. A spreadsheet was developed to facilitate the calculation of these required strengthening forces.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In April 1991 the Iowa Department of Transportation, the CNW Transportation Company, the SOO Line, and local agencies and business in the Mason City/Clear Lake area initiated an Operation Lifesaver program to attempt to increase public awareness of safety issues and safe behavior at railroad-highway grade crossings. This document reports an initial study of data on traffic characteristics at a selected set of grade crossings in Cerro Gordo County taken before and after the safety program. Twenty-two crossings were studied. The 13 crossings at which collisions were reported for the five years prior to the study were included in the sample of sites. Two field observations were made at each study crossing before the Operation Lifesaver campaign was in full swing, and two observations were made after the conclusion of the main effort of the campaign. The summary of each data set is contained in a companion volume. The research shows that Operation Lifesaver altered drivers' behavior in the following ways: (1) reduced approach speeds and crossing speeds at crossings with low speed limits, (2) reduced the percent of drivers approaching the crossing at speeds in excess of the posted speed limit, and (3) increased alertness of drivers to railroad crossing hazards as evidenced by more drivers looking for a clear track. Thus, Operation Lifesaver enhanced safety in street and highway traffic operations in the vicinity of railroad-highway grade crossings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Severe flooding occurred during July 19-25, 1999, in the Wapsipinicon and Cedar River Basins following two thunderstorms over northeast Iowa. During July 18-19, as much as 6 inches ofrainfall was centered over Cerro Gordo, Floyd, Mitchell, and Worth Counties. During July 20-21, a second storm occurred in which an additional rainfall of as much as 8 inches was centered over Chickasaw and Floyd Counties. The cumulative effect of the storms produced floods with new maximum peak discharges at the following streamflow-gaging stations: Wapsipinicon River near Tripoli, 19,400 cubic feet per second; Cedar River at Charles City, 31,200 cubic feet per second (recurrence interval about 90 years); Cedar River at Janesville, 42,200 cubic feet per second (recurrence interval about 80 years); and Flood Creek near Powersville, 19,000 cubic feet per second. Profiles of flood elevations for the July 1999 flood are presented in this report for selected reaches along the Wapsipinicon, Cedar, and Shell Rock Rivers and along Flood Creek. Information about the river basins, rain storms, and flooding are presented along with information on temporary bench marks and reference points in the Wapsipinicon and Cedar River Basins.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This letter has been prepared as a consultation to EPA regarding the third five year review of the Northwestern States Portland Cement Company Site, located North of Mason City, Iowa in Cerro Gordo County to provide an evaluation of the public health status of the site.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Clear Lake, Iowa's third largest natural lake, is located in Cerro Gordo County in north-central Iowa. The lake is a premier natural resource and popular recreational destination in north central Iowa, providing more than $40 million dollars annually to the local economy. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full recreational potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. There are over 68 storm water outlet points in the Clear Lake watershed that allow untreated urban runoff to empty directly into Clear Lake. Local governments have been very active in installing storm water Best Management Practices (BMPs) at as many of the outlets that current funding allows. To date, 11 of the 68 sites (16%) have been protected. These improvements have been very effective in reducing contaminants in the storm water runoff, but the remaining outlets still need protection. The first phase of this grant request is for an investigation of 10 storm water outlet sites to determine the most cost effective BMP for each site. The second phase of the grant request is to implement the BMPs deemed most cost effective at 5 of the 10 sites investigated. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.