13 resultados para Empirical user study

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study is a concise summary of a study of trail users on the Raccoon River Valley Trail commissioned by the Dallas County Conservation Board. It provides information associated with natural and cultural resources.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study tests the theory of rationing, examining changes in household consumption behavior during the transition to a market economy in Poland, 1987–92. A model of consumption under rationing is developed and fitted to prereform quarterly data from the Polish Household Budget Survey. Virtual prices, prices at which consumers would have voluntarily chosen the rationed levels of goods, are derived for food and housing. The prereform Almost Ideal Demand System (AIDS) model with rationing is estimated. Estimates from the virtual AIDS yield plausible values for price and income elasticities. The AIDS model (without rationing) is also fitted to postreform quarterly household survey data for comparison and evaluation. When the two sets of results are compared, the impacts of rationing are consistent with the theory. Own-price elasticities for nonrationed goods are larger after the reform, and there is increased complementarity and decreased substitutability for the nonrationed goods. The results for Poland show a 75 percent decline in real household welfare over the transition and this welfare loss is one-third the value obtained using reported prices.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With the release of the new Mechanistic-Empirical Pavement Design Guide (MEPDG), pavement design has taken a “quantum” leap forward. The current 1993 design guide is solidly based on the empirical interpretation of the results of the 1960 American Association of State Highway and Transportation Officials (AASHTO) Road Test. This report seeks to outline the technical aspects of the new MEPDG. Full detail is essentially impossible and impractical, since the release of the MEPDG was accompanied by eighteen volumes of technical justification and background. Consequently, this report seeks only to provide a potential user with a practical understanding of the workings of the new guide, with only sufficient technical depth to aid in understanding.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

China’s economic reforms, which began in 1978, resulted in remarkable income growth, and urban Chinese consumers have responded by dramatically increasing their consumption of meat, other livestock products, and fruits and by decreasing consumption of grain-based foods. Economic prosperity, a growing openness to international markets, and domestic policy reforms have changed the food marketing environment for Chinese consumers and may have contributed to shifts in consumer preferences. The objective of this paper is to uncover evidence of structural change in food consumption among urban residents in China. Both parametric and nonparametric methods are used to test for structural change in aggregate household data from 1981 to 2004. The tests provided a reasonably clear picture of changing food consumption over the study period.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

LEGISLATIVE STUDY – The 83rd General Assembly of the Iowa Legislature, in Senate File 2273, directed the Iowa Department of Transportation (DOT) to conduct a study of how to implement a uniform statewide system to allow for electronic transactions for the registration and titling of motor vehicles. PARTICIPANTS IN STUDY – As directed by Senate File 2273, the DOT formed a working group to conduct the study that included representatives from the Consumer Protection Division of the Office of the Attorney General, the Department of Public Safety, the Department of Revenue, the Iowa State County Treasurer’s Association, the Iowa Automobile Dealers Association, and the Iowa Independent Automobile Dealers Association. CONDUCT OF THE STUDY – The working group met eight times between June 17, 2010, and October 1, 2010. The group discussed the costs and benefits of electronic titling from the perspectives of new and used motor vehicle dealers, county treasurers, the DOT, lending institutions, consumers and consumer protection, and law enforcement. Security concerns, legislative implications, and implementation timelines were also considered. In the course of the meetings the group: 1. Reviewed the specific goals of S.F. 2273, and viewed a demonstration of Iowa’s current vehicle registration and titling system so participants that were not users of the system could gain an understanding of its current functionality and capabilities. 2. Reviewed the results of a survey of county treasurers conducted by the DOT to determine the extent to which county treasurers had processing backlogs and the extent to which county treasurers limited the number of dealer registration and titling transactions that they would process in a single day and while the dealer waited. Only eight reported placing a limit on the number of dealer transactions that would be processed while the dealer waited (with the number ranging from one to four), and only 11 reported a backlog in processing registration and titling transactions as of June 11, 2010, with most backlogs being reported in the range of one to three days. 3. Conducted conference calls with representatives of the American Association of Motor Vehicle Administrators (AAMVA) and representatives of three states -- Kansas, which has an electronic lien and titling (ELT) program, and Wisconsin and Florida, each of which have both an ELT program and an electronic registration and titling (ERT) program – to assess current and best practices for electronic transactions. In addition, the DOT (through AAMVA) submitted a survey to all U.S. jurisdictions to determine how, if at all, other states implemented electronic transactions for the registration and titling of motor vehicles. Twenty-eight states responded to the survey; of the 28 states that responded, only 13 allowed liens to be added or released electronically, and only five indicated allowing applications for registration and titling to be submitted electronically. DOT staff also heard a presentation from South Dakota on its ERT system at an AAMVA regional meeting. ELT information that emerged suggests a multi-vendor approach, in which vendors that meet state specifications for participation are authorized to interface with the state’s system to serve as a portal between lenders and the state system, will facilitate electronic lien releases and additions by offering lenders more choices and the opportunity to use the same vendor in multiple states. The ERT information that emerged indicates a multi-interface approach that offers an interface with existing dealer management software (DMS) systems and through a separate internet site will facilitate ERT by offering access that meets a variety of business needs and models. In both instances, information that emerged indicates that, in the long-term, adoption rates are positively affected by making participation above a certain minimum threshold mandatory. 4. To assess and compare functions or services that might be offered by or through a vendor, the group heard presentations from vendors that offer products or services that facilitate some aspect of ELT or ERT. 5. To assess the concerns, needs and interest of Iowa motor vehicle dealers, the group surveyed dealers to assess registration and titling difficulties experienced by dealers, the types of DMS systems (if any) used by dealers, and the dealers’ interest and preference in using an electronic interface to submit applications for registration and titling. Overall, 40% of the dealers that responded indicated interest and 57% indicated no interest, but interest was pronounced among new car dealers (75% were interested) and dealers with a high number of monthly transactions (85% of dealers averaging more than 50 sales per month were interested). The majority of dealers responding to the dealer survey ranked delays in processing and problems with daily limits on transaction as ―minor difficulty or ―no difficulty. RECOMMENDATIONS -- At the conclusion of the meetings, the working group discussed possible approaches for implementation of electronic transactions in Iowa and reached a consensus that a phased implementation of electronic titling that addressed first electronic lien and title transactions (ELT) and electronic fund transfers (EFT), and then electronic applications for registration and titling (ERT) is recommended. The recommendation of a phased implementation is based upon recognition that aspects of ELT and EFT are foundational to ERT, and that ELT and EFT solutions are more readily and easily attained than the ERT solution, which will take longer and be somewhat more difficult to develop and will require federal approval of an electronic odometer statement to fully implement. ELT – A multi-vendor approach is proposed for ELT. No direct costs to the state, counties, consumers, or dealers are anticipated under this approach. The vendor charges participating lenders user or transaction fees for the service, and it appears the lenders typically absorb those costs due to the savings offered by ELT. Existing staff can complete the programming necessary to interface the state system with vendors’ systems. The estimated time to implement ELT is six to nine months. Mandatory participation is not recommended initially, but should be considered after ELT has been implemented and a suitable number of vendors have enrolled to provide a fair assessment of participation rates and opportunities. EFT – A previous attempt to implement ELT and EFT was terminated due to concern that it would negatively impact county revenues by reducing interest income earned on state funds collected by the county and held until the monthly transfer to the state. To avoid that problem in this implementation, the EFT solution should remain revenue neutral to the counties, by allowing fees submitted by EFT to be immediately directed to the proper county account. Because ARTS was designed and has the capacity to accommodate EFT, a vendor is not needed to implement EFT. The estimated time to implement EFT is six to nine months. It is expected that EFT development will overlap ELT development. ERT – ERT itself must be developed in phases. It will not be possible to quickly implement a fully functioning, paperless ERT system, because federal law requires that transfer of title be accompanied by a written odometer statement unless approval for an alternate electronic statement is granted by the National Highway Traffic Safety Administration (NHTSA). It is expected that it will take as much as a year or more to obtain NHTSA approval, and that NHTSA approval will require design of a system that requires the seller to electronically confirm the seller’s identity, make the required disclosure to the buyer, and then transfer the disclosure to the buyer, who must also electronically confirm the buyer’s identity and electronically review and accept the disclosure to complete and submit the transaction. Given the time that it will take to develop and gain approval for this solution, initial ERT implementation will focus on completing and submitting applications and issuing registration applied for cards electronically, with the understanding that this process will still require submission of paper documents until an electronic odometer solution is developed. Because continued submission of paper documents undermines the efficiencies sought, ―full‖ ERT – that is, all documents necessary for registration and titling should be capable of approval and/or acceptance by all parties, and should be capable of submission without transmittal or delivery of duplicate paper documents .– should remain the ultimate goal. ERT is not recommended as a means to eliminate review and approval of registration and titling transactions by the county treasurers, or to place registration and titling approval in the hands of the dealers, as county treasurers perform an important role in deterring fraud and promoting accuracy by determining the genuineness and regularity of each application. Authorizing dealers to act as registration agents that approve registration and title applications, issue registration receipts, and maintain and deliver permanent metal license plates is not recommended. Although distribution of permanent plates by dealers is not recommended, it is recommended that dealers participating in ERT generate and print registration applied for cards electronically. Unlike the manually-issued cards currently in use, cards issued in this fashion may be queried by law enforcement and are less susceptible to misuse by customers and dealers. The estimated time to implement the electronic application and registration applied for cards is 12 to 18 months, to begin after ELT and EFT have been implemented. It is recommended that focus during this time be on facilitating transfers through motor vehicle dealers, with initial deployment focused on higher-volume dealers that use DMS systems. In the long term an internet option for access to ERT must also be developed and maintained to allow participation for lower-volume dealers that do not use a DMS system. This option will also lay the ground work for an ERT option for sales between private individuals. Mandatory participation in Iowa is not recommended initially. As with ELT, it is recommended that mandatory participation be considered after at least an initial phase of ERT has been implemented and a suitable number of dealers have enrolled to provide a fair assessment of participation rates and opportunities. The use of vendors to facilitate ERT is not initially proposed because 1) DOT IT support staff is capable of developing a system that will interact with DMS systems and will still have to develop a dealer and public interface regardless of whether a vendor acts as intermediary between the DMS systems, and 2) there is concern that the cost of the vendor-based system, which is funded by transaction-based payments from the dealer to the vendor, will be passed to the consumer in the form of additional documentation or conveyance fees. However, the DOT recommends flexibility on this point, as development and pilot of the system may indicate that a multi-vendor approach similar to that recommended for ELT may increase the adoption rate by larger dealers and may ultimately decrease the user management to be exercised by DOT staff. If vendors are used in the process, additional legislation or administrative rules may be needed to control the fees that may be passed to the consumer. No direct cost to the DOT or county treasurers is expected, as the DOT expects that it may complete necessary programming with existing staff. Use of vendors to facilitate ERT transactions by dealers using DMS systems would result in transaction fees that may ultimately be passed to consumers. LEGISLATION – As a result of the changes implemented in 2004 under Senate File 2070, the only changes to Iowa statutes proposed are to section 321.69 of the Iowa Code, ―Damage disclosure statement,and section 321.71, ―Odometer requirements.‖ In each instance, authority to execute these statements by electronic means would be clarified by authorizing language similar to that used in section 321.20, subsections ―2‖ and ―3,‖ which allows for electronic applications and directs the department to ―adopt rules on the method for providing signatures for applications made by electronic means.‖ In these sections, the authorizing language might read as follows: Notwithstanding contrary provisions of this section, the department may develop and implement a program to allow for any statement required by this section to be made electronically. The department shall adopt rules on the method for providing signatures for statements made by electronic means. Some changes to DOT administrative rules will be useful but only to enable changes to work processes that would be desirable in the long term. Examples of long term work processes that would be enabled by rule changes include allowing for signatures created through electronic means and electronic odometer certifications. The DOT rules, as currently written, do not hinder the ability to proceed with ELT, EFT, and ERT.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The transportation system is in demand 24/7 and 365 days a year irrespective of neither the weather nor the conditions. Iowa’s transportation system is an integral and essential part of society serving commerce and daily functions of all Iowans across the state. A high quality transportation system serves as the artery for economic activity and, the condition of the infrastructure is a key element for our future growth opportunities. A key component of Iowa’s transportation system is the public roadway system owned and maintained by the state, cities and counties. In order to regularly re-evaluate the conditions of Iowa’s public roadway infrastructure and assess the ability of existing revenues to meet the needs of the system, the Iowa Department of Transportation’s 2006 Road Use Tax Fund (RUTF) report to the legislature included a recommendation that a study be conducted every five years. That recommendation was included in legislation adopted in 2007 and signed into law. The law specifically requires the following (2011 Iowa Code Section 307.31): •“The department shall periodically review the current revenue levels of the road use tax fund and the sufficiency of those revenues for the projected construction and maintenance needs of city, county, and state governments in the future. The department shall submit a written report to the general assembly regarding its findings by December 31 every five years, beginning in 2011. The report may include recommendations concerning funding levels needed to support the future mobility and accessibility for users of Iowa's public road system.” •“The department shall evaluate alternative funding sources for road maintenance and construction and report to the general assembly at least every five years on the advantages and disadvantages and the viability of alternative funding mechanisms.” Consistent with this requirement, the Iowa Department of Transportation (DOT) has prepared this study. Recognizing the importance of actively engaging with the public and transportation stakeholders in any discussion of public roadway conditions and needs, Governor Terry E. Branstad announced on March 8, 2011, the creation of, and appointments to, the Governor’s Transportation 2020 Citizen Advisory Commission (CAC). The CAC was tasked with assisting the Iowa DOT as they assess the condition of Iowa’s roadway system and evaluate current and future funding available to best address system needs. In particular the CAC was directed to gather input from the public and stakeholders regarding the condition of Iowa’s public roadway system, the impact of that system, whether additional funding is needed to maintain/improve the system, and, if so, what funding mechanisms ought to be considered. With this input, the CAC prepared a report and recommendations that were presented to Governor Branstad and the Iowa DOT in November 2011 for use in the development of this study. The CAC’s report is available at www.iowadot.gov/transportation2020/pdfs/CAC%20REPORT%20FINAL%20110211.pdf. The CAC’s report was developed utilizing analysis and information from the Iowa DOT. Therefore, the report forms the basis for this study and the two documents are very similar. Iowa is fortunate to have an extensive public roadway system that provides access to all areas of the state and facilitates the efficient movement of goods and people. However, it is also a tremendous challenge for the state, cities and counties to maintain and improve this system given flattening revenue, lost buying power, changing demands on the system, severe weather, and an aging system. This challenge didn’t appear overnight and for the last decade many studies have been completed to look into the situation and the legislature has taken significant action to begin addressing the situation. In addition, the Iowa DOT and Iowa’s cities and counties have worked jointly and independently to increase efficiency and streamline operations. All of these actions have been successful and resulted in significant changes; however, it is apparent much more needs to be done. A well-maintained, high-quality transportation system reduces transportation costs and provides consistent and reliable service. These are all factors that are critical in the evaluation companies undertake when deciding where to expand or locate new developments. The CAC and Iowa DOT heard from many Iowans that additional investment in Iowa’s roadway system is vital to support existing jobs and continued job creation in the state of Iowa. Beginning June 2011, the CAC met regularly to review material and discuss potential recommendations to address Iowa’s roadway funding challenges. This effort included extensive public outreach with meetings held in seven locations across Iowa and through a Transportation 2020 website hosted by the Iowa DOT (www.iowadot.gov/transportation2020). Over 500 people attended the public meetings held through the months of August and September, with 198 providing verbal or written comment at the meetings or through the website. Comments were received from a wide array of individuals. The public comments demonstrated overwhelming support for increased funding for Iowa’s roads. Through the public input process, several guiding principles were established to guide the development of recommendations. Those guiding principles are: • Additional revenues are restricted for road and bridge improvements only, like 95 percent of the current state road revenue is currently. This includes the fuel tax and registration fees. • State and local governments continue to streamline and become more efficient, both individually and by looking for ways to do things collectively. • User fee concept is preserved, where those who use the roads pay for them, including non¬residents. • Revenue-generating methods equitable across users. • Increase revenue generating mechanisms that are viable now but begin to implement and set the stage for longer-term solutions that bring equity and stability to road funding. • Continue Iowa’s long standing tradition of state roadway financing coming from pay-as-you-go financing. Iowa must not fall into the situation that other states are currently facing where the majority of their new program dollars are utilized to pay the debt service of past bonding. Based on the analysis of Iowa’s public roadway needs and revenue and the extensive work of the Governor’s Transportation 2020 Citizen Advisory Commission, the Iowa DOT has identified specific recommendations. The recommendations follow very closely the recommendations of the CAC (CAC recommendations from their report are repeated in Appendix B). Following is a summary of the recommendations which are fully documented beginning on page 21. 1. Through a combination of efficiency savings and increased revenue, a minimum of $215 million of revenue per year should be generated to meet Iowa’s critical roadway needs. 2. The Code of Iowa should be changed to require the study of the sufficiency of the state’s road funds to meet the road system’s needs every two years instead of every five years to coincide with the biennial legislative budget appropriation schedule. 3.Modify the current registration fee for electric vehicles to be based on weight and value using the same formula that applies to most passenger vehicles. 4.Consistent with existing Code of Iowa requirements, new funding should go to the TIME-21 Fund up to the cap ($225 million) and remaining new funding should be distributed consistent with the Road Use Tax Fund distribution formula. 5.The CAC recommended the Iowa DOT at least annually convene meetings with cities and counties to review the operation, maintenance and improvement of Iowa’s public roadway system to identify ways to jointly increase efficiency. In direct response to this recommendation, Governor Branstad directed the Iowa DOT to begin this effort immediately with a target of identifying $50 million of efficiency savings that can be captured from the over $1 billion of state revenue already provided to the Iowa DOT and Iowa’s cities and counties to administer, maintain and improve Iowa’s public roadway system. This would build upon past joint and individual actions that have reduced administrative costs and resulted in increased funding for improvement of Iowa’s public roadway system. Efficiency actions should be quantified, measured and reported to the public on a regular basis. 6.By June 30, 2012, Iowa DOT should complete a study of vehicles and equipment that use Iowa’s public roadway system but pay no user fees or substantially lower user fees than other vehicles and equipment.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Department of Corrections recently entered into a data sharing agreement with Iowa Workforce Development (IWD), the purpose of which is to better ascertain the effect of prison education on postprison employment. This study is important because the DOC partners with community colleges to provide prison-based education, with a goal of increasing the numbers of inmates completing GEDs. We are demonstrating success toward that goal, but what we lack is empirical evidence showing the level of success that Iowa prison education programs have on Iowa offenders’ employment success upon their return to communities here in the state.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The present research project was designed to identify the typical Iowa material input values that are required by the Mechanistic-Empirical Pavement Design Guide (MEPDG) for the Level 3 concrete pavement design. It was also designed to investigate the existing equations that might be used to predict Iowa pavement concrete for the Level 2 pavement design. In this project, over 20,000 data were collected from the Iowa Department of Transportation (DOT) and other sources. These data, most of which were concrete compressive strength, slump, air content, and unit weight data, were synthesized and their statistical parameters (such as the mean values and standard variations) were analyzed. Based on the analyses, the typical input values of Iowa pavement concrete, such as 28-day compressive strength (f’c), splitting tensile strength (fsp), elastic modulus (Ec), and modulus of rupture (MOR), were evaluated. The study indicates that the 28-day MOR of Iowa concrete is 646 + 51 psi, very close to the MEPDG default value (650 psi). The 28-day Ec of Iowa concrete (based only on two available data of the Iowa Curling and Warping project) is 4.82 + 0.28x106 psi, which is quite different from the MEPDG default value (3.93 x106 psi); therefore, the researchers recommend re-evaluating after more Iowa test data become available. The drying shrinkage (εc) of a typical Iowa concrete (C-3WR-C20 mix) was tested at Concrete Technology Laboratory (CTL). The test results show that the ultimate shrinkage of the concrete is about 454 microstrain and the time for the concrete to reach 50% of ultimate shrinkage is at 32 days; both of these values are very close to the MEPDG default values. The comparison of the Iowa test data and the MEPDG default values, as well as the recommendations on the input values to be used in MEPDG for Iowa PCC pavement design, are summarized in Table 20 of this report. The available equations for predicting the above-mentioned concrete properties were also assembled. The validity of these equations for Iowa concrete materials was examined. Multiple-parameters nonlinear regression analyses, along with the artificial neural network (ANN) method, were employed to investigate the relationships among Iowa concrete material properties and to modify the existing equations so as to be suitable for Iowa concrete materials. However, due to lack of necessary data sets, the relationships between Iowa concrete properties were established based on the limited data from CP Tech Center’s projects and ISU classes only. The researchers suggest that the resulting relationships be used by Iowa pavement design engineers as references only. The present study furthermore indicates that appropriately documenting concrete properties, including flexural strength, elastic modulus, and information on concrete mix design, is essential for updating the typical Iowa material input values and providing rational prediction equations for concrete pavement design in the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The resilient modulus (MR) input parameters in the Mechanistic-Empirical Pavement Design Guide (MEPDG) program have a significant effect on the projected pavement performance. The MEPDG program uses three different levels of inputs depending on the desired level of accuracy. The primary objective of this research was to develop a laboratory testing program utilizing the Iowa DOT servo-hydraulic machine system for evaluating typical Iowa unbound materials and to establish a database of input values for MEPDG analysis. This was achieved by carrying out a detailed laboratory testing program designed in accordance with the AASHTO T307 resilient modulus test protocol using common Iowa unbound materials. The program included laboratory tests to characterize basic physical properties of the unbound materials, specimen preparation and repeated load triaxial tests to determine the resilient modulus. The MEPDG resilient modulus input parameter library for Iowa typical unbound pavement materials was established from the repeated load triaxial MR test results. This library includes the non-linear, stress-dependent resilient modulus model coefficients values for level 1 analysis, the unbound material properties values correlated to resilient modulus for level 2 analysis, and the typical resilient modulus values for level 3 analysis. The resilient modulus input parameters library can be utilized when designing low volume roads in the absence of any basic soil testing. Based on the results of this study, the use of level 2 analysis for MEPDG resilient modulus input is recommended since the repeated load triaxial test for level 1 analysis is complicated, time consuming, expensive, and requires sophisticated equipment and skilled operators.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of this study is to systematically evaluate the Iowa Department of Transportation’s (DOT’s) existing Pavement Management Information System (PMIS) with respect to the input information required for Mechanistic-Empirical Pavement Design Guide (MEPDG) rehabilitation analysis and design. To accomplish this objective, all of available PMIS data for interstate and primary roads in Iowa were retrieved from the Iowa DOT PMIS. The retrieved data were evaluated with respect to the input requirements and outputs for the latest version of the MEPDG software (version 1.0). The input parameters that are required for MEPDG HMA rehabilitation design, but currently unavailable in the Iowa DOT PMIS were identified. The differences in the specific measurement metrics used and their units for some of the pavement performance measures between the Iowa DOT PMIS and MEPDG were identified and discussed. Based on the results of this study, it is recommended that the Iowa DOT PMIS should be updated, if possible, to include the identified parameters that are currently unavailable, but are required for MEPDG rehabilitation design. Similarly, the measurement units of distress survey results in the Iowa DOT PMIS should be revised to correspond to those of MEPDG performance predictions. *******************Large File**************************

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa DOT reviewed Corps of Engineers accounting records to determine the costs of operating and maintaining a 300 mile section of the Mississippi River. This document reviews the details the study.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The liquid and plastic limits of a soil are consistency limits that were arbitrarily chosen by Albert Atterberg in 1911. Their determination is by strictly empirical testing procedures. Except for the development of a liquid limit device and subsequent minor refinements the method has remained basically unchanged for over a half century. The empirical determination of an arbitrary limit would seem to be contrary to the very foundations of scientific procedures. However, the tests are relatively simple and the results are generally acceptable and valuable in almost every conceivable use of soil from an engineering standpoint. Such a great volume of information has been collected and compiled by application of these limits to cohesive soils, that it would be impractical and virtually impossible to replace the tests with a more rational testing method. Nevertheless, many believe that the present method is too time consuming and inconsistent. Research was initiated to investigate the development of a rapid and consistent method by relating the limits to soil moisture tension values determined by porous plate and pressure membrane apparatus. With the moisture tension method, hundreds of samples may be run at one time, operator variability is minimal, results are consistent, and a high degree of correlation to present liquid limit tests is possible.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The goal of this research was to recommend specific changes relating to service by intercity buses and third level air carriers to propose an appropriate state role in the implementation of changes. Changes contemplated in this research were to be directed to the increased use of intercity buses and third level air carriers in such manner as to exert a benefit to user as well as the general public. Specific objectives of the project included: (1) to analyze the potential for a system of express intercity bus routes in Iowa; (2) to estimate the demand for third level air carrier services in cities having populations under 50,000; (3) to forecast the relationship between economic costs and benefits from an intercity bus system emphasizing express routes between major population centers and supporting a subsystem of local and intraregional public transportation; (4) to estimate the economic feasibility of expanded third level air carrier service with emphasis upon those routes proposed as worth of further evaluation; and (5) to provide guidance for establishing the need for state and local subsidies to institute a system of express intercity buses and to expand third level air carrier services. In addition to passenger movements, enhancing package freight shipments was also to be considered in the evaluation of proposed improvements.