10 resultados para Emergence Time Period
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Iowa Workforce Development research conducted in 2001 on Iowa workers displaced by layoffs indicated that post-layoff wages remained at or above pre-layoff levels. During the layoff quarters selected for analysis – first, second, and third quarters of 1998 – there were twenty-one layoff events, none of which were closures. The research at that time did not discriminate between closures or permanent layoffs for which no recall was expected and those layoff events expected to recall workers. The post/pre ratios1 of the affected workers in manufacturing were at or above 100%, while remaining slightly below the universe pre/post ratios for the same time period.
Resumo:
In recent years, thin whitetopping has evolved as a viable rehabilitation technique for deteriorated asphalt cement concrete (ACC) pavements. Numerous projects have been constructed and tested, allowing researchers to identify the important elements contributing to the projects’ successes. These elements include surface preparation, overlay thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. Although the main factors affecting thin whitetopping performance have been identified by previous research, questions still existed as to the optimum design incorporating these variables. The objective of this research is to investigate the interaction between these variables over time. Laboratory testing and field testing were conducted to achieve the research objectives. Laboratory testing involved shear testing of the bond between the portland cement concrete (PCC) overlay and the ACC surface. Field testing involved falling weight deflectometer deflection responses, measurement of joint faulting and joint opening, and visual distress surveys on the 9.6-mile project. The project was located on Iowa Highway 13 extending north from the city of Manchester, Iowa, to Iowa Highway 3 in Delaware County. Variables investigated include ACC surface preparation, PCC thickness, slab size, synthetic fiber reinforcement usage, and joint spacing. This report documents the planning, construction, and performance of each variable in the time period from summer 2002 through spring 2006. The project has performed well with only minor distress identification since its construction.
Resumo:
This is a second report, submitted by Benjamin F. Shaughbum, on the Public Archives for the time period of September 18, 1906 to May 11, 1907. As a "program for immediate action" six recommendations were submitted to the Trustees of the State Library and Historical Department of Iowa under the date of September 18, 1906.
Resumo:
In the August Data Download, we reported that the number of prison admissions due to probation revocation had declined in FY 2008 in comparison with the previous four years, despite the fact that the number of offenders on probation has actually increased over that time period. In this issue we explore information in the reports of violation that led to probation revocations to prison.
Resumo:
Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This report answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. These were computed using work zone traffic conditions for partial-closure projects and detour volumes and routes for full-closure projects. Conditions during construction were compared to after construction. Crash costs were computed using Highway Safety Manual methodology. Safety Performance Functions produced annual crash frequencies that were translated into crash cost savings. In considering an average project, the percentage of RUC savings was around 13% of the total contract amount, or $444,389 of $3,464,620. The net RUC savings produced was around $7.2 million after subtracting the approximately $1.7 million paid in incentives. In other words, for every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted. I/D provisions were very successful in saving RUC for projects with full-closure, projects in urban areas, and emergency projects. Rural, non-emergency projects successfully saved RUC but not at the same level as other projects. The I/D contracts were also compared to all Missouri Department of Transportation contracts for the same time period. The results show that I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. But I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award. A survey of state transportation departments and contractors showed that both agreed to the same issues that affect the success of I/D contracts. Legal analysis suggests that liquidated damages is preferred to disincentives, since enforceability of disincentives may be an issue. Overall, in terms of work zone impact mitigation, I/D contracts are very effective at a relatively low cost.
Resumo:
The following reports include data for youth discharging from graduated sanction services (Tracking and Monitoring, Supervised Community Treatment and Life-skills) between the time period of July 1, 2005 and June 30, 2006.
Resumo:
In recent years in both Iowa and nationally, there has been a strong focus on increasing salary levels for teachers. Iowa initiated the Student Achievement and Teacher Quality Program in fiscal year 2002 to improve the quality of K-12 teachers in Iowa schools. The program's funding to improve teacher salaries continues and is now part of the school-aid formula. During the same time period, there has been a growing focus on recruiting and improving the quality of school district superintendents and other school administrators. This issue review looks at the growth of salaries over the past ten years for Iowa's full-time teachers, superintendents and other administrators.
Resumo:
This report documents Phase III of a four-phase project. The goals of the project are to study the feasibility of using advanced technology from other industries to improve he efficiency and safety of winter highway maintenance vehicle operations, and to provide travelers with the level of service defined by policy during the winter season at the least cost to the taxpayers. The results of the first phase of the research were documented in the Concept Highway Maintenance Vehicle Final Report: Phase One dated April 1997, which describes the desirable functions of a concept maintenance vehicle and evaluates its feasibility. Phase I concluded by establishing the technologies that would be assembled and tested on the prototype vehicles in Phase II. The primary goals of phase II were to install the selected technologies on the prototype winter maintenance vehicles and to conduct proof of concept in advance of field evaluations planned for Phase III. This Phase III final report documents the work completed since the end of Phase II. During this time period, the Phase III work plan was completed and the redesigned friction meter was field tested. A vendor meeting was held to discuss future private sector participation and the new design for the Iowa vehicle. In addition, weather and roadway condition data were collected from the roadway weather information systems at selected sites in Iowa and Minnesota, for comparison to the vehicles' onboard temperature sensors. Furthermore, the team received new technology, such as the mobile Frensor unit, for bench testing and later installation.
Resumo:
This report provides a summary description of the activities of the Iowa Medicaid Drug Utilization Review Commission, along with an evaluation of the Iowa Medicaid retrospective drug utilization review program. Information contained in this report covers projects completed and evaluated during the time period of July 2014 through June 2015.
Resumo:
This report describes the U.S. 63 Corridor in terms of its economic and demographic features, the physical characteristics of the existing facility and the traffic it serves. Also, the various improvement alternatives are described and evaluated. These evaluations consider the traffic needs in the time period up to the year 2010, the travel benefits that would derive from alternative improvements to U.S. 63 and the economic development benefits that would be stimulated by such improvements. These benefits are related to the costs of the improvements and various indicators of economic feasibility are provided.